GOODWE A-BP Installation Guide
- June 6, 2024
- GOODWE
Table of Contents
GOODWE A-BP Installation Guide

INSTALLATION INSTRUCTIONS
-
Installation space
- Upward———-500mm(19.69 in.)
- Downward——300mm(11.81 in.)
- Front————–300mm(11.81 in.)
- Both sides——-200mm(7.87 in.)

-
Dimensions for drilling holes

-
Fix the wall bracket

-
Install the inverter

-
Fasten screws

-
Inverter could be locked for anit-theft

-
Wiring Conduit Plugs Connection

-
Battery cable assembly and connection

-
On-grid cable assembly and connection

-
Back-up cable assembly and connection

-
Auto-transformer cable assembly and connection
-
CT connection

-
Battery BMS connection
For CAN1 battery, for example BYD, please connect BMS cables to CAN1 terminals.
For LG battery, please connect BMS cables to 485-1 terminals and connect enable signal cables to LG _EN+ & LG_EN-.

-
Plug the WiFi module into the Wifi terminal.
Auto-transformer Connection (Optional)
-
Installation space
- Upward ———-300mm(11.81 in.)
- Downward ——300mm(11.81 in.)
- Front ————-200mm(7.87 in.)
- Both sides ——-100mm(3.94 in.)

-
Fix the wall bracket

-
Installation the auto-transformer

-
Auto-transformer connection

-
WIRING SYSTEM FOR A-BP SERIES INVERTER (FULL LOAD)

-
SYSTEM CONNECTION DIAGRAM(FULL LOAD)
Note 1: The backup Output L1 or L2 Max continuous current carrying capacity≤40A
Note 2: The actual 50A circuit breaker is installed in this box or other boxes.

-
WIRING SYSTEM FOR A-BP SERIES INVERTER

-
SYSTEM CONNECTION DIAGRAM
Note 1: The rated current of the circuit breaker depends on the load power.
Note 2: The Max continuous output current Per Phase @120V is 40A.
Note 3: The back-up Output L1 or L2 Max continuous current carrying capacity≤40A.

-
SEMS Portal websitewww.semsportal.com

Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>