SALUS KL06 Wiring Centre Instruction Manual

June 6, 2024
SALUS

salus control logo

SALUS KL06 Wiring Centre

SALUS KL06 Wiring Centre

Wiring centre description

wiring center detail

  1. Cartridge fuse 5 x 20 mm 2 A

  2. Power Supply

  3. Diodes

  4. NSB (Night Set Back reduction) function

  5. Thermostats connection

  6. Actuators connection

  7. PL06 – pump (or boiler) control module
    PL07 – pump and boiler control module

  8. Serial connector for PL06 and PL07 modules

Introduction

Wired KL06 230V wiring centre allows easy and quick connection of thermostats and actuators.
It has a serial connector for additional modules (sold separately):
• PL06 Pump or boiler control module
• PL07 Pump and boiler control module
The KL06 230V wiring centre is adapted to work with NC type actuators (normally closed) and maximum 6 thermostats.

Product Compliance

This product complies with the essential requirements and other relevant provisions of the following EU Directives: EMC 2014/30/EU, Low Voltage Directive LVD 2014/35/EU, RoHS directive 2011/65/EU. The full text of the EU Declaration of Conformity is available at the following internet address: www.saluslegal.com.

Safety information

Use in accordance to national and EU regulations. Use the device as intended, keeping it in dry condition. Product for indoor use only. Installation must be carried out by a qualified person in accordance to national and EU regulations. Before any of operation releated to power supply (connecting wires, installing the device, etc.), make sure that KL06 is not connected to any power source. Installation must be carried out by a qualified person. Incorrect connection of the wires may cause damage to the wiring centre. The KL06 can not be used in conditions of water vapor condensation neither exposed to water.

Technical Information
  • Power Supply 230 V AC 50 Hz
  • Max load 2 (1) A
  • Outputs Terminals for actuators (230 V)
  • Dimmensions [mm] 300 x 86 x 63

Fuse

Note : Replace the fuse only when the wiring centre is disconnected from power supply (230 V ~).
Main fuse is located under the housing cover next to power supply terminals and secures the wiring centre and the devices connected to it. Use cartridge fuses (5×20 mm) with nominal max current 2 A. To replace fuse remove the fuse holder with a flat screwdriver and pull out the fuse.

Power Supply

Power supply for wiring centre is 230 V ~ 50Hz.

connection 1

LED diodes

  • green LED diode indicates power supply connection (230 V AC)
  • orange LED diode indicates NSB function being activated

NSB (Night Set Back reduction) function

NSB function is activated in non-programmable Salus thermostats of the Expert NSB, HTR, BTR series via external signal. NSB 230 V signal (night-time temperature reduction) is sent via an external timer or programmable thermostat connected to the KL06 wiring centre. Non-programmable thermostats are receiving NSB signal and reducing setpoint temperature (by switching to eco mode). All thermostats have to be connected using a 4-wire cable (min. 4 x 0,75 mm2, max. 4 x 1,5 mm2 ).

Thermostats connection

  • Connecting EXPERT NSB, HTR or BTR series thermostats with NSB functionconnection 2
  • Connecting a 230 V thermostat to the KL06-M wiring centre (e.g. SQ610 Quantum Thermostat)connection 3
  • Connecting ON/OFF battery-powered thermostat with voltage-free COM / NO output contacts (e.g. 091FL, RT310, RT510)

Actuators connection
The actuator wires should be secured with the self locking connectors in the appropriate zone. Up to 6 actuators with a load of up to 2 Watts each can be connected to a single zone. Should more than 6 actuators be required in a zone use an additional relay to relieve the output.

PL06 – pump (or boiler) control module
PL06 module is used to control the pump (or boiler) using volt-free NC/COM/NO contacts. When any of thermostats connected to the KL06 230 V reports heat demand, COM/NO contacts are closing. COM/NO contacts are opening, when thermostats connected to the wiring centre will stop sending signal for heating.

Jumpers 0-15
These are used to set in minutes the delay time (overrun time). Default setting is „0”.

0-15 values specify the time in minutes. E.g. when jumper is set to value „0”,COM/NO output will turn off as soon as the thermostats stop calling for heat. If  jumper will be set to the value „10”, the module will turn off 10 min after the thermostats stop calling for heat.

Jumpers P,1,2,3,4,5,6
They are used to select the zone which turns on the module. Default setting is „P”.

P – all zones start the module
1, 2, 3, 4, 5, 6 – select the specific zone which turns on the module.

PUMP CONTROLconnection 7

BOILER CONTROLconnection 8

  • Power Supply from the KL06 wiring centre
  • Max load 5 (2) A
  • Outputs NO/COM/NC relay
  • Dimensions [mm] 60 x 80 x 20

7 B. PL07 – pump and boiler control module

PL07 module is used to control the pump and the boiler using volt-free COM/NO contacts. When any of thermostats connected to the KL06 230V reports heat demand, COM/NO contacts are closing. COM/NO contacts are opening, when thermostats connected to the wiring centre will stop sending signal for heating.

ON-OFF Delay jumper
Is used to activate the delay output for the pump and boiler. Default is „ON”.

connection 9• „ON” position activates the pump and boiler outputs with a delay of 3 minutes after the heating signal is supplied from any of the thermostats connected to the wiring centre.
• „OFF” position causes immediate activation of the pump and boiler outputs.

ON-OFF Overrun jumper
Is used to activate the delay output for the pump when heating is satisfied. Default is „ON”.

„ON” position turns OFF the pump output with a delay of 3 minutes when all thermostats stop calling for heat.

„OFF” position immediately turns OFF the pump output when all thermostats stop calling for heat.

Pump and boiler controlconnection 11

Serial connector for PL06 and PL07 modules

It provides communication between the KL06 wiring centre and the PL06/PL07 modules. KL06 wiring centre + PL06/PL07 module increases functionality and additionally makes possible to control pump and/or boiler. PL06/PL07 module is powered from the wiring centre.

INSTALLATION

installation 1 installation
2

INSTALLATION OF THE ADDITIONAL MODULE PL06 OR PL07 ON THE EXAMPLE OF PL06 MODULEinstallation 3

Documents / Resources

| SALUS KL06 Wiring Centre [pdf] Instruction Manual
KL06, Wiring Centre
---|---
| SALUS KL06 Wiring Centre [pdf] Instruction Manual
KL06 Wiring Centre, KL06, Wiring Centre, Centre

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SALUS User Manuals

Related Manuals