WVC-1400 MPPT Solar Grid Tie Micro Inverter User Manual

June 6, 2024
INVERTER

Microinverter
Use Manual
WVC-1400

WVC series communication type intelligence Micro grid-connected inverter

  • Maximum power point tracking
  • Reverse power transmission
  • I / 0, fully isolated
  • No installation, no maintenance
  • Adaptive voltage/frequency
  • Internal high precision meter
  • App monitoring system
  • Forward full-bridge topology
model WVC-1400
Maximum input power 1400Watt
Output voltage mode 120/230V Auto switch
PV Open circuit voltage 30-60VOC
Operating voltage range 22-60V
Starting voltage range 22-60V
short-circuit current 65A
Maximum working current 56A
Output parameters @120V @230V
Output peak power 1400Watt 1400Watt
Rated output power 1350Watt 1350Watt
Output current 11.6A 6A
AC voltage range 80-160VAC 180-280VAC
AC frequency range 48-51Hz/58-61Hz 48-51Hz/58-61Hz
Power factor >95% >95%
Number of branch connections 3PCS(Single) 6PCS(Single)
Output efficiency @120V @230V
Static MPPT efficiency 99.50% 99.50%
Max output efficiency 95% 95%
Loss of power at night <0.5W <0.5W
Total current harmonics <5% <5%

Appearance and technical features

Temperature range -40°C to +65°C
Size(L×W×H) 370mm×300mm×41.6mm
Net amount 3.0kg
Waterproof grade Ip65 NEMA3R
Heat dissipation mode Self-cooling
Communication mode 433MHz/WiFi
Power transmission mode Reverse transmission, Load priority
monitoring system Mobile phone APP、Browser
Electromagnetic Detection EN61000-6-1:2007 EN6100-6-3:2007+A1:2011+AC:2012
Power Grid standard EN50549-1、EN 50549-2、NBR 16149:2013、UL1741
Power grid detection IEC/EN 62109-1、 IEC/EN 62109-2、 IEC 62116、IEEE 1547
Certificate CE,ETL,INMETRO,Patented technology

Packing weight

Specifications Each(Packing)  Box(4PCS)
weight 4.0KG 16.5KG
Size 430×375×140mm 430×405×380mm

System diagram

Description of the connector and cable core of the microinverter

** Note **You can purchase a professionally customized AC bus with a T-type connector.
Use this AC bus as the AC bus for each branch. Connect it hand in hand to form a modular micro-inverter branch wiring system.

LED indicator function of micro-inverter

  1. Red light is on—The micro-inverter is powered on, the red light is on, and the equipment is ready to work;
  2. Red light flashes—-The micro-inverter is fully prepared and enters the delayed startup state;
  3. Flashing green MPPTMaximum PowerPoint search status;
  4. Greenlight is on—-MPPTMaximum PowerPoint locked state;
  5. The green light turns red—-a. Island protection; b. Frequency protection; c. AC over/under-voltage protection; d. DC voltage over and under-voltage protection; e. fault; f. software shutdown;

Normal working indicator flashing process: Connect the micro-inverter to the AC and DC terminals, and then turn on the power the red light will be on for 3 seconds the red light will flash for 30 seconds the green light will flash quickly (MPPT maxim urn PowerPoint search)—, The green light is on, (MPPT lock).

Appearance description of micro-inverter

Preparation before installation:

  1. Please install Kayden micro inverter series products as shown in the following figure.
  2. Please note that only qualified personnel can install and/or replace Kaideng micro-inverters.
  3. Before installing or using Kaideng Micro Inverter, please read all instructions and technical instructions and the warning mark system and photovoltaic array on Kay Microinverter.
  4. When installing the inverter handshake cable, please plan that your AC branch circuit cannot exceed the current limit, that the maximum number of micro-inverters in each branch can be reasonably allocated.
    Inverter model| Number of branches
    ---|---
    WVC-295| 30PCS
    WVC-300| 30PCS
    WVC-350| 25PCS
    WVC-600| 15PCS
    WVC-700| 12PCS
    WVC-1000| 10PCS
    WVC-1200| 8PCS
    WVC-1400| 6PCS
    WVC-1600| 5PCS
    WVC-2000| 5PCS
    WVC-2400| 3PCS
    WVC-2800| 3PCS

*Each region may be different. Please refer to local requirements to define the number of micro-inverters per branch in your area.

  1. Implement all national electrical codes (NEC), ANSI / NFPA 70 in accordance with all local electrical codes and all relevant regulations.
  2. Please do not try to repair the Kaideng micro-inverter. It does not contain user-serviceable parts. If it fails, please contact Kaideng customer service to obtain the ID number and start the replacement process. Tampering or opening the Kaideng microinverter will invalidate the warranty.
  3. Please make sure that the installation operation is performed before the AC power is disconnected, and do not install the K -aiding micro-inverter with power on.
  4. After the installation of the power station is completed, please install a ground wire on the photovoltaic support, install and use lightning protection and/or surge suppress
    -ion equipment protection system in the AC junction box. It is very important to have a switch device that automatically protects against lightning strikes and surges.
  5. In addition to Kaideng Energy’s WVC series micro-inverters, you must also purchase photovoltaic brackets / AC boxes / electrical cables and other related materials. The current of each channel of the WVC series micro-inverters at the branch of the installed circuit cannot exceed 40 Amp, if the rated current is exceeded, it may lead to an unsafe factor.
  6. Check if you still have the following related equipment: AC junction box, tools: screwdriver, wire cutter, voltmeter, torque wrench, socket, and wrench for installing hardware, etc.

WVC-1400 microinverter installation drawing

Inverter installation steps

Step1 Install the inverter on the bracket of the photovoltaic panel with the screws provided with the machine, as shown in the following figure:

Step2 Connect the positive and negative poles of the DC connection MC4 plug on the photovoice -Altaic board to the DC input terminal of the inv -enter, as shown below:
Step3
Open the waterproof cover of the AC output the connector of the inverter and connect the AC cable to the AC waterproof plug. The connection method is as shown in the plug connection diagram:

Step 4 Connect the AC output cable to the AC main cable;

Step 5 Repeat steps 1 to 3, install and connect all inverters;
Step 6 Connect the AC main cable to the utility grid to start your green energy journey.

Wiring Diagram WVC-1400 Triple Phase

Distribution network preparation tool

When installing the KDM monitoring system, it is necessary to configure the KDM monitoring system in advance. Please use the two-dimensional scanning function to download and install the MxEasyLink network distribution tool.
( IOS SYSTEM Download Password:Mxchip )

http://d.firim.top/rlpm?utm_source=fir&utm_medium=qr
https://www.pgyer.com/o1pH?sign=&auSign=

Monitoring system distribution network instructions

Press the reset button (A-1), release the button (A-2) when the indicator light flashes quickly, and operate in the MxEasyLink interface of the mobile phone. (Please explain the parameters below for Android and IOS) When the network configuration is completed, the Ready and Link lights of the collector will become a constant light display (A-3).

Android client configuration

Connect the wireless network of your mobile phone to your home wireless signal source and open the MxEasyLink client B-1, fill in the wireless SSID and password in the software. When the collector is in the (A-2) state, click the send command button B-2, The system will automatically configure the network until the data string is received, and the network configuration is successful (B-3).

IOS Client configuration

Open the MxEasyLink client, click “+” in the upper right corner C-1 to create network configuration settings and fill in the SSID and password, and select the mode as “EasyLink AWS”. When the collector flashes quickly as shown in Figure(A-2), click the “Start  EasyLink AWS Mode” button is like C-2. When the distribution network receives the module data and returns C-3. Click “Confirm” to complete the network configuration.

KDM Monitoring System

Ready to work:
Install the “KDM Monitoring System” tool on your Android Phone Download: http://jzi6.cn/MiTp6q (You can scan the QR to Download)
Note: This application only supports Android. If you have an iPhone, please operate in your browser and log in to the website: kdm.kaidengdg.com

http://jzi6.cn/MiTp6q

Create account
Open KDM software D-1, first use KDM monitoring system, please click Register D-2, register KDM account and save D-3.

ADD Station
After logging account, click “Add Station” Like Figure E-1, fill in the Information, and fill in the 8-digit code on the back of the Modem into the corresponding items. For example, E-2. For the electrical box option, please select “None”, and fill in “1” “Figure E-3

ADD Inverter
When the creation of the power station is completed, the page will automatically jump to the interface for adding an inverter (make sure the inverter has been installed correctly), fill in the 8-digit ID on the inverter and click Add such as F1, after the addition is completed You can return to query the working status of the inverter F-2 and view the basic operating status of the power station F-3. * The Wi-Fi modem changes its working mode (press and hold the reset button until the following display appears):
TCP/IP mode: Release the Ready indicator from “off→on-off”;
Internet of Things mode: Release the Ready indicator from “off→on”;

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

INVERTER User Manuals

Related Manuals