ROBOS RAE244012E-01 Alexander 24W and 40W LED Batten Instruction Manual
- June 6, 2024
- ROBOS
Table of Contents
INSTRUCTION MANUAL
ALEXANDER 24W/40W LED BATTEN, IP20,1200MM, 4000K,
WHITE, EMERGENCY
RAE244012E-01, RAE404012E-01
PLEASE READ THE INSTRUCTIONS BEFORE COMMENCING INSTALLATION AND RETAIN THEM
FOR FUTURE REFERENCES.
! Electrical products can cause death or injury, or damage to property. If in
any doubt about the installation or use of this product, consult a competent
electrician
Note:
Product technical information and specification may change over time without
prior notification. For the latest technical information please visit our web
site
www.robus.com or
robusdirect.com
-10°C < Ta < +40°C, 220V – 240V ~ 50/60Hz, Class I, IP20, Battery Warranty: 2 Years
Luminaire is non-dimmable
Suitable for mounting on a normally flammable surface.
Installation
- Ensure mains supply is switched off before commencing work.
- Select a suitable location for mounting luminaire.
- Expose the base by removing the screws.
- Remove diffuser/ LEDs from the base. Unplug Connector.
- Write installation date on battery and connect the battery.
- Mark appropriate fixing hole positions on the wall, check the location of buried cables, pipes, and other building services before drilling.
- Feed supply cables through cable entry hole and attach the base to surface.
- Connect wires from un-switched supply to terminals: Brown/Live to PL, Blue/ Neutral to N, and Green/ Yellow to earth. For fitting always on, link terminal “SL” to terminal “PL”. When controlled by switch connect switch live wire to terminal SL and permanent live to PL. Note: if the “SL” terminal is not connected, fitting works as non-maintained.
- Plug-in connector, attach diffuser/ LEDs, and tighten screws. Ensure that it is secure. Switch on supply: The green LED should come on indicating correct battery charge status. When supply to permanent live PL is lost, the battery will operate fitting in emergency mode. RHESUS-2W: 2 wires suspension kit.
Testing
The emergency lighting must be inspected and tested regularly in accordance
with local codes of practice: note: for safety reasons tests should be carried
out during daylight hours.
The minimum recommended test schedule is as follows:
After installation, allow 24 hours to ensure full battery charge and then
interrupt the supply; the maximum duration time is 3 hours check that LEDs are
still lighting.
- Daily check that charge indicator LED is working
- Monthly, interrupt mains for a short period and check LED lights
- Annual 12-month check, full-duration test. Interrupt mains supply, LEDs will light and should last for a minimum 3 hours operation: batteries must be replaced when they can no longer support 3-hour operation.
- Complete record sheet on installation and retain in maintenance file.
- Update file with ongoing test records for inspection by fire officer or another duly authorized person
Market Surveillance: LS Code of energy efficiency Class D RAE244012-LS; RAE404012-LS Disconnect driver input and output connections. Remove screws and remove the diffuser. Remove LED PCB
Information for the Product user:
- Please note the requirement to dispose of Waste Electrical & Electronic Equipment separately from household waste (WEEE marked with crossed-out wheelie bin symbol).
- Please consider your role in contributing to re-use and recycling by returning this product at end of life to a collection center for waste electrical equipment or a Civic Amenity site, or to a retail outlet from which you are purchasing a replacement.
- This equipment may contain substances that are hazardous to health and the environment if disposed of carelessly. It is important that it is separated from normal household waste and recycled in the WEEE chain
- The “crossed out wheelie bin symbol” on a product indicates this equipment must not be disposed of in a normal household waste, but should be disposed of according to local WEEE regulations
The Installation must be carried out by a qualified electrician
Issue 2 090721.
Installation and Maintenance Record:
Installer………………..
Installation……………..Type
Installation test duration & Date….
Month | 1st Year | 2nd Year | 3 Year | 4 Year | |
---|---|---|---|---|---|
Test | Signed | Date | Signed | Date | Signed |
1 | Short | ||||
2 | Short | ||||
3 | Short | ||||
4 | Short | ||||
5 | Short | ||||
6 | Short | ||||
7 | Short | ||||
8 | Short | ||||
9 | Short | ||||
10 | Short | ||||
11 | Short | ||||
Short | |||||
12 | 3Hr. |
L.E.D lighting & Electrical Distribution Group UC
IRE: Nangor Road, Dublin 12, D12 E7VP, Ireland
UK: Bracknell Enterprise & Innovation Hub, Ocean
House, 12th Floor, The Ring, Bracknell,
Berkshire RG12 1AX, UK
Tel: +353 1 7099000
Fax: +353 1 7099060
Email: info@robus.com
Website:www.robus.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>