ZKTeco SBT2000S Swing Barrier Turnstile Installation Guide

June 6, 2024
ZKTECO

ZKTeco SBT2000S Swing Barrier Turnstile Installation Guide

ZKTeco SBT2000S Swing Barrier Turnstile

SBT2000S Swing Barrier Turnstile

Due to regular upgrades of systems and products, ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual.

1. Installation Requirements

  • It is recommended that the swing barrier turnstile be installed on a horizontal solid platform with 50 mm to 100 mm in height, the horizontal angle must not be greater than ±0.7°.
  • It is also recommended that the swing barrier turnstile should not be used in the corrosive environment.
  • Make sure the ground wire of the system is reliably connected to avoid personal injuries or other accidents.
  • After installation, check if the connection is done correctly at the connecting points of the ground wire, at the connector assemblies and wiring points of the circuits, as well as at each movable part of the swing barrier turnstile. Any loose nuts, screws and other fasteners should be tightened in time to avoid any failures caused by long-time operations.

2. Installation Position

The installation position of the swing barrier turnstile depends on its size. A distance of 100mm between the swing barrier turnstile and the wall needs to be reserved for ease of opening the top cover of the machine to perform maintenance and adjustment. The reference figure is shown below:

FIG 1 Installation Position

Figure 2-1 SBT2000S Series Dual-lane

3. Preparation

  1. Tools: A measuring tape, an adjustable wrench, an impact drill and a small screwdriver (included in the package).
  2. Material: A PVC anti-fire and insulation tube (diameter≥25mm), standard three-core power extension wire, tether cable (random configuration), M12 expansion screws (included in the package).
  3. Thread the connection wire of the device through the tube before assembly.
    The power and signal wires should be set separately to easily distinguish strong and weak power. Please invite professional personnel to complete the wiring. The device must be connected to the ground. Below is the outline and dimensions of SBT2000S:

FIG 2 Preparation

FIG 3 Preparation

Figure 3-1

4. Installation

  1. Prepare the tools for product installation and sort out the auxiliaries according to the packing list.
  2. Mark the screw hole at the centre of the stand, and the edge of the chassis base on the ground according to the sizes as shown on the Figure 4-1.
  3. Drill the holes with Ф14 and embed M12 anchor screws or expansion screws. As shown on the Figure 4-2.

FIG 4 Installation

Figure 4-1

FIG 5 Installation

Figure 4-2

4. Place the swing barrier turnstile according to the sizes and positions as shown in the figure before installation and fixing.
5. For the outlets of the concealed cables, please refer the below diagram indicating the mounting
holes. The input voltage for this swing barrier turnstile is AC100V-120V/200V- 240V and its master and slave are connected by an 2-core cable (signal) and a 2-core cable (power). When installing the swing barrier turnstile, the user only needs to connect it to the corresponding ports. Note that the PVC conduits are laid 100mm under the ground, with the height of the exposed part not exceeding 100mm. In addition, the conduit outlet is bent back to prevent the ingress of water into the conduit.

SBT2000S series installation holes and cabling positions is shown in Figure 4-3:

FIG 7 Installation

Figure 4-3

6. Connect the online cables and perform the power-on test. Wait for 10 seconds for the turnstile to complete the self-test program. At the same time, check if the indicators work properly. If everything works fine, you can tighten the screws and fix the device. If an exception occurs, please contact your vendor.
7. It is recommended that a warning line be marked on the ground after installing the device, so as to prompt the pedestrian to stand behind the warning line when swiping the card. As shown in Figure 4-4:

FIG 8 Installation

Figure 4-4

5. Wiring Diagram

Below is the wiring diagram:

FIG 9 Wiring Diagram

FIG 10 Wiring Diagram

FIG 11 Wiring Diagram

ZKTeco Industrial Park, No. 26, 188 Industrial Road,
Tangxia Town, Dongguan, China.
Phone : +86 769-82109991
Fax : +86 755 – 89602394
www.zkteco.com

Copyright© 2020 ZKTECO CO., LTD. All Rights Reserved.

Read More About This Manual & Download PDF:

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ZKTECO User Manuals

Related Manuals