MAAX 10037438 1-Piece Freestanding Bathtub Instruction Manual
- June 5, 2024
- MAAX
Table of Contents
MAAX 10037438 1-Piece Freestanding Bathtub
INSTALLATION INSTRUCTIONS
STEP :1
Bathtub and drain positioning Make sure the finished floor is perfectly
leveled. Impact: Is very hard to fix the level of the floor with the bathtub
in place over the finished floor. With the help of the bathtub or the optional
template, mark on the floor the position of the drain. Before drilling a hole
in the floor for the drainpipe, make sure there are no hidden elements
underneath (pipes, floor joists, heating ducts, electrical
wires).
If the optional F² Drain kit was purchased to facilitate this installation, you have to install it in this step. Please refer to 10032746 installation guide section 1P FS before installing the bathtub.
STEP:2
Leveling legs adjustment Place the bathtub upside down on cardboard to
protect the surface. Adjust the legs so that they exceed the top of the edge
of the skirt by 1/8″. You can use a 2×4 to take the measure as shown. Turn the
bath over to confirm that it is stable on the ground. Validate that all legs
are in contact with the ground.Do not remove the Technical Identification
number, doing so may void the warranty. This number may be found at the back
of the tub or above the drain, It is recommended to take note of the number so
that it is easier to access.
STEP :3
For ABS, PVC Plumbing / F2 drain ONLY Adapter installation to the 1 1/2” drain Male pipe thread (NPT) Preassemble the drain line piping to the 1 1/2” drain male pipe thread (NPT). The bathtub must be tested before installation is complete. Fill the bathtub to the overflow and inspect for leaks. Tighten all connections.
Do not forget that it is very important to test the bathtub to inspect for leaks.
STEP:4
Bathtub preparation and installation Lose the drain connection and turn the bathtub upside down on cardboard. To complete the installation and solidify the bathtub, apply a 3/8” wide bead of silicone along the seam where the bathtub rests against the floor
Turn the bathtub and place it in the previously marked position. The bathtub must be tested before installation is complete. Fill the bathtub to the overflow and inspect for leaks. Tighten all connections.Do not forget that it is very important to test the bathtub to inspect for leaks.
Wait 24 hours before using the bathtub.
References