Swagelok MS-CRD-FIXTURE Series 5, 10, and 20 Weld Head Tube Fixture Block Instructions

June 3, 2024
Swagelok

Swagelok MS-CRD-FIXTURE Series 5, 10, and 20 Weld Head Tube Fixture Block

Swagelok-MS-CRD-FIXTURE-Series-5-10-and-20-Weld-Head-Tube-Fixture-Block-
PRO

Attaching Centering Gauge to Plenum

  1. Attach a screw (#4-40 UNC), a lock washer, and one end of the lanyard to the side of the plenum with the tapped hole.
  2. Use a screw (#4-40 UNC) and lock washer to attach the centering gauge to the other end of the lanyard.

Swagelok-MS-CRD-FIXTURE-Series-5-10-and-20-Weld-Head-Tube-Fixture-
Block-1

Alignment Adjustment Instructions

  1.  Loosen the four cap screws on the fixture side plate pointed to by the arrows on the plenum.
  2. Place a minimum length of tubing in the collets so it rests across both side plates.
    Weld Head Series| Minimum Tubing Length, in. (mm)
    ---|---
    Series 5| 1.50 (38.1)
    Series 10| 2.00 (50.8)
    Series 20| 3.00 (76.2)
  3. Lock down the stationary fixture side plate and then the loosened fixture side plate using the latches at the top of the fixture side plates.
  4. Tighten the four cap screws loosened in step 1.
  5. Release the latching mechanism, and remove the straight length of the tubing.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals