edbak TR1 Flat Screen Trolley Instruction Manual
- June 5, 2024
- edbak
Table of Contents
INSTALLATION MANUAL
TR1
Plasma/LCD Trolley 22” – 60”
Technical drawing
Checklist
-
Assembling wheels to the base plate
-
Assembling base plate with pipes
-
Assembling mounting head on pipes
-
Assembling back plate with mounting head
-
Mounting front plates to the back of screen
-
Mounting screen on the VESA adapter
-
Security skrew
-
Adjustable screen position
-
Tilt and height adjustment of the screen
-
Assembling rubber plugs
WARNING:
Please read this manual before the installation to ensure proper assembly. The
assembly should be carried out in accordance with this manual by at least two
persons with proper qualifications in assembly. EDBAK Company shall not be
liable for any material or property damage or bodily injury resulting from
improper assembly. Therefore, you should always follow the instructions:
– during the assembly, please follow the instructions carefully. Otherwise, it
may result in product damage or even personal injury;
– before the assembly you must ensure that under the surface of the wall where
the mount is to be fixed there are no power cables, water or sewage pipes, or
gas installations;
– while fixing the screen on the mount, please ensure that the screws are of
proper length and diameter. In order to ensure the right length and diameter,
you may use the accompanying plastic pads. The use of improper screws may
result in permanent product damage. Extra caution should be given with movable
elements in order to prevent crushing r pressing your hands or fingers. This
manual indicates such elements. The terms of the product guarantee are set
forth in the guarantee card.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>