Luminergie CR0 Screw the Cable Grippers Installation Guide

June 4, 2024
Luminergie

Luminergie CR0 Screw the Cable Grippers

Luminergie CR0 Screw the Cable
Grippers product

SUSPENDED INSTALLATION

  1. Choose and mark the mounting locations on the ceiling, drill holes if needed.  

  2. Secure cable couplers (a) on the ceiling using appropriate mounting screws #8 and anchors (not included).

  3. Screw the cable grippers (b) into the cable couplers on the ceiling. Tighten to secure.

  4. Loosen the stoppers on the cable grippers (b) and pass the suspension cables (c) all the way inside. Tighten the cable stoppers.

  5. Adjust the 1/4”-20NC inserts (d) inside the upper channel of the extrusion to position them equal distance from both ends. Tighten the inserts using set screws (e) and Allen key.

  6. Assemble cable grippers (g) to the extrusion using the set screws (e) installed in the inserts. Tighten the cable grippers.

  7. Loosen the stoppers on the cable grippers (g) and pass the suspension cables (c) into the cable grippers and out through the side exit holes. Adjust the cable length to the needed suspension height.

  8. Tighten the stoppers of the cable grippers (g). When the luminaire is well aligned, cut off the excess cable.

  9. rubans DEl et de gradateurs.
    Make sure that the power is switched off at the electrical panel.
    Pass the electrical wire (l) from the luminaire through the hole in the canopy (m), tie the wire into a knot to prevent it from being pulled out. Then pass the wire through the central hole in the mounting plate (n). Locate junction box (by others). Make electrical connections between the wire from the luminaire (l) and the output wire of the remote driver (by others). See the wiring diagrams below for different connection options depending on LED tape and dimmer types.Luminergie CR0 Screw the Cable Grippers fig
10

  10. Assemble the mounting plate(n) to the junction box using provided screws (p).

  11. Assemble the canopy (m) to the mounting plate (n) using provided screws (q).

ATTENTION

  • Pass the main power feed (not included) and power supply input cable (3) into junction box (not included).
  • Connect the white (N, Neutral) cables from the power feed and from the power supply.
  • Connect the black (L, Live) cables from the power feed and from the power supply.
  • Connect the copper, green or yellow (G, ground) wires from the power supply, power feed, and the junction box. Use appropriate twist-on connectors (not included).
  • Install the junction box cover (not included).

WARNING: RISK OF ELECTRIC SHOCK

To prevent electric shock, power should be turned off from the electrical panel before installation or maintenance process. INSTALLATION MUST COMPLY WITH ALL CURRENT NATIONAL AND LOCAL ELECTRICAL CODES.Luminergie CR0 Screw the Cable
Grippers fig 13

  1. Choose and mark the mounting locations on the ceiling, drill holes if needed.

  2. Secure cable couplers (a) on the ceiling using appropriate mounting screws #8 and anchors (not included).

  3. Screw the cable grippers (b) into the cable couplers on the ceiling. Tighten to secure.

  4. Loosen the stoppers on the cable grippers (b) and pass the suspension cables (c) all the way inside. Tighten the cable stoppers.

  5. Adjust the 1/4”-20NC inserts (d) inside the upper channel of the extrusion to position them equal distance from both ends. Tighten the inserts using set screws (e) and Allen key.

  6. Assemble cable grippers (g) to the extrusion using the set screws (e) installed in the inserts. Tighten the cable grippers.

  7. Loosen the stoppers on the cable grippers (g) and pass the suspension cables (c) into the cable grippers and out through the side exit holes. Adjust the cable length to the needed suspension height.

  8. Tighten the stoppers of the cable grippers (g). When the luminaire is well aligned, cut off the excess cable.

  9. WARNING: RISK OF ELECTRIC SHOCK
    To prevent electric shock, power should be turned off from the electrical panel before installation or maintenance process. INSTALLATION MUST COMPLY WITH ALL CURRENT NATIONAL AND LOCAL
    Make sure that the power is switched off at the electrical panel.
    Locate junction box (not included). Pass the AC main power feed (not included) through the central hole in the mounting plate (n).
    Assemble the mounting plate to the junction box using provided screws (p). Thoroughly secure the mounting plate(n) to the ceiling using appropriate mounting screws #8 (not included).

  10. Make electrical connections between the driver input (o) and the main power feed (see wiring on p.9).

  11. Pass the electrical wire (l) from the luminaire through the hole in the canopy (m). Adjust the electrical wire to the desired length. Tie the wire into a knot to prevent it from being pulled out.

  12. Make electrical connections between the driver output (o) and the luminaire electrical wire (l).
    See the wiring diagrams p.9 for different connection options depending on LED tape and dimmer types.

  13. Assemble the canopy (m) to the mounting plate (n) using provided screws (q). Luminergie CR0 Screw the Cable Grippers fig 26

HIGH VOLTAGE CONNECTION BETWEEN THE POWER SUPPLY INPUT AND THE POWER

FEEDLuminergie CR0 Screw the Cable Grippers fig 27

LOW VOLTAGE CONNECTION BETWEEN THE POWER SUPPLY OUTPUT AND THE

LUMINAIRELuminergie CR0 Screw the Cable Grippers fig
28

CIK0, CIK1, CIK2

Luminergie CR0 Screw the Cable Grippers fig
29 Luminergie CR0 Screw the Cable Grippers fig
30 Luminergie CR0 Screw the Cable Grippers fig
31 Luminergie CR0 Screw the Cable Grippers fig
32

Make sure that the power is switched off at the electrical panel. Locate junction box (by others). Pass the AC main power feed (by others) through the central hole in the mounting plate (n). Assemble the mounting plate to the junction box using provided screws (p). Thoroughly secure the mounting plate(n) to the ceiling using appropri-ate mounting screws #8 and anchors if necessary (by others).

WARNING: RISK OF ELECTRIC SHOCK

To prevent electric shock, power should be turned off from the electrical panel before installation or maintenance process. INSTALLATION MUST COMPLY WITH ALL CURRENT NATIONAL AND LOCAL ELECTRICAL CODES.

Make electrical connections between the driver input (o) and the main power feed (see wiring on p.14).

CIK0, CIK1, CIK2

Luminergie CR0 Screw the Cable Grippers fig
36

  • Make electrical connections between the driver output (o) and the luminaire electrical wire (l).
    See the wiring diagrams p.14 for different connection options depending on LED tape and dimmer types.

  • Assemble the canopy (m) to the mounting plate (n) using provided screws (q).

Luminergie CR0 Screw the Cable Grippers fig 37 Luminergie CR0 Screw the Cable Grippers fig 38 Luminergie CR0 Screw the Cable Grippers fig 39