Galanz GL1CT24AS4G Gas Cooktop Instruction Manual
- June 4, 2024
- Galanz
Table of Contents
Galanz GL1CT24AS4G Gas Cooktop
INSTALLATION
Installation and service must be conducted by qualified/licensed technicians, in accordance with national & local regulations. Failure to comply will void the product warranty.
- Always disconnect the appliance power before installation & maintenance.
- These cooktops are designed to be dropped into a countertop measuring >24 inches in depth.
- Please use the “Cutting size board” (cardboard packed in the box) to outline & cut a hole in the countertop.
- Minimum vertical clearances of 18 inches from top surface unit to side cabinets.
- The minimum horizontal distance(S) from the sides and back of the appliance to adjacent vertical combustible walls extending above the top panel, 6 inches from the left side, 6 inches from the right side, and 2 inches from the rear wall.
- Minimum clearance to combustible construction centered above the cooking surface: Vertical 30 inches, Horizontal 30 inches.
- The unit overhead cabinet maximum depth: 13 inches. Minimum Horizontal Distance from the front edge of the counter to the front side of the appliance, 1 inch.
Note:
The adjacent furniture and all materials used in installation must be able to
withstand a minimum of 185°F above the ambient temperature.
However certain types of vinyl or laminate kitchen furniture are particularly prone to heat damage or discoloration at temperatures below 185°F.
CONNECT THE COOKTOP TO GAS
Shut off the main gas supply valve before disconnecting the old cooktop and leave it off until the new hook-up has been Completed. Don’t forget to relight the pilot on other gas appliances when you turn the gas back on. Never use an old connector when installing a new cooktop.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>