POWER-POLE AVG-MP-0937 PV Extension Pulpit Instructions
- June 1, 2024
- POWER-POLE
Table of Contents
- INSTRUCTIONS
- INCLUDED HARDWARE
- MOUNTING PARAMETERS
- DRILL PILOT HOLES
- INSTALL PULPIT
- 3 Phillips Head Screwdriver, tighten hardware snug using a 7/16” Socket &
- INSTALL PV TO PULPIT
- INSTALL SPRINGS AND SHROUDS
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
- 2 Phillips Head Screwdriver
- 3 Phillips Head Screwdriver
**POWER-POLE AVG-MP-0937 PV Extension Pulpit Instructions
**
INSTRUCTIONS
TOOLS:
-
2 Phillips Head Screwdriver
-
3 Phillips Head Screwdriver
- 7/16” Socket
- 7/16” Wrench
- Ratchet
- Electric Drill
- 5-16” Drill Bit
INCLUDED HARDWARE
QTY. | LABEL | ITEM # | DESCRIPTION |
---|---|---|---|
6 | A | AVG-MH-SC-0318 | 1 /4″-20, Full Thread, 3″, Stainless Flat-Head Phillips |
Drive Screw
1| B| AVG-MP-0937| Pulpit Plate, Long
6| C| AVG-MP-0915| Thick Rubber Washer
6| D| AVG-MH-WS-0306| 1 /4″ Large Stainless Steel Flat Washer
6| E| nut-14-tall| 1/4″ Brass Tall Nylon Lock Nut
4| F| AVG-MH-BT-0320| 1 /4″-20, 1 1 /8″ Stainless Hex Head Bolt
2| G| AVG-MH-BT-0319| 1/4″-20, 7/8″ Stainless Hex Head Bolt
6| H| wash-14-pp| 1/4″ Small Stainless Steel Flat Washer
6| I| AVG-MH-WS-0321| 1/4″ Lock Washer
DETERMINE MOUNTING LOCATION
Cam Arm Clearance
After reading the Mounting Parameters lay the Pulpit B on the boat deck and
line up the mounting holes on the PV Mounting Template (included with trolling
motor) with the holes on the Pulpit B . Move the Pulpit B into position so the
Cam Arms have proper clearance and all parameters are me
MOUNTING PARAMETERS
- Ensure there are no obstructions or sensitive components where the mounting hardware will be installed.
- Make sure the cam arms can have a full range of motion and will not hit the boat when the unit is deployed.
- Ensure there are no obstructions blocking the motor from fully deploying and stowing.
- If mounting to a curved Boat Deck, ensure Rubber Washers C are used between the Pulpit and Deck.
DRILL PILOT HOLES
Drill Pilot holes for the Flat Head Screws A using a 5/16” Drill Bit.
Use the furthest possible forward two holes, the furthest possible back two
holes, and two holes that are spaced evenly in between the others.
Preferred Mounting Example
Check the area beneath where the Pulpit will be mounted to ensure there are no
hoses, wires lines tanks or other sensitive components
IMPORTANT! If installing to gel-coat, follow the drilling procedure in
Appendix A of the Installation & Owner’s Guide to ensure you do not
crack or chip the gel-coat.
IMPORTANT! Make sure the cut-out is facing the front of the boat and the
counter-sunk holes are facing upright.
INSTALL PULPIT
Install the Pulpit Mounting Hardware in order. While holding Screws A with a
3 Phillips Head Screwdriver, tighten hardware snug using a 7/16” Socket &
Wrench.
- (6) Screws A
- Pulpit B
- (6) Rubber Washers C if needed
- Boat Deck
- (6) Large Washers D
- (6) Nylon Lock Nuts E
NOTICE: If Installing the PV to Pulpit using a Quick Disconnect Mount,
follow the Mounting the Move PV Section in the Installation Owner’s
Guide.
Always disconnect power by turning the main battery cutoff switch to the
off position before performing any installations.
REMOVE SPRINGS AND SHROUDS
STEP : 1 Using a #2 Phillips Screwdriver, remove the (2) Screws that
attach the Shroud Assembly.
STEP : 2 Rotate the Shroud Assembly so it is resting against the Die Cast
Motor Housing.
STEP : 3 (Optional for easiest install) Remove the (2) Springs by pulling
upward and sliding the spring eye off of the spring post.
Shroud Removal
Spring Removal
REMOVE QUICK DISCONNECT HARDWARE
STEP 1 While holding the rear two Flat Head Screws with a #3 Phillips
Screwdriver, loosen the Hex Nuts using a 7/16” Socket and Ratchet, then remove
hardware. FIG A
STEP 2 Push down on and hold the Foot Pedal so the arms slide backward,
allowing the additional (4) Screws to be accessed. FIG B
Figure B
Figure A
STEP : 3 Repeat STEP 1 for the remaining (4) Screws and hardware.
FIG A
NOTICE : You will need to use an extension to reach the front four
nuts.
INSTALL PV TO PULPIT
Install the PV mounting hardware in order. Tighten hardware snug using a 7/16” Socket & Wrench.
- (6) Bolts ( F for the front four mounting holes, G for the rear two mounting holes)
- (6) Lock Washers H
- (6) Small Washers I
- Pulpit B
PV to Pulpit Long
NOTICE: You will need to use an extension to reach Bolts F .
NOTICE: You will need to engage the Foot Release to reach Bolts F .
INSTALL SPRINGS AND SHROUDS
STEP 1 Reinstall the (2) Springs.
STEP 2 Flip the Shroud Assembly down, ensuring the Shrouds are
interlocking not overlapping.
STEP 3 Install the Screw on either side of the unit. Using a #2
Phillip’s head screwdriver, tighten snug.
Spring Install
Shroud Installation
9010 Palm River Road, Tampa, Florida 33619 • phone 813.689.9932 • fax
813.689.8883 • power-pole.com
Power-Pole is a registered trademark of JL Marine Systems, Inc. © Copyright
2023 JL Marine Systems, Inc. All Rights Reserved