HITACHI RAK-VJ18PHAE Air Conditioner Instruction Manual
- June 1, 2024
- Hitachi
Table of Contents
- HITACHI RAK-VJ18PHAE Air Conditioner
- Product Information
- Product Usage Instructions
- SAFETY PRECAUTION
- Direct Mounting On The Wall
- Procedures of Installation and Precautions
- Heat Insulation and Finish of the Piping
- HOW TO REMOVE INDOOR UNIT
- Pipe Connection
- CONNECTION OF POWER CORD
- Wiring of The Indoor Unit
- HOW TO REMOVE OR ATTACH THE FRONT COVER
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
HITACHI RAK-VJ18PHAE Air Conditioner
Product Information
Specifications
- Model: RAK-VJ18PHAE, RAK-VJ25PHAE, RAK-VJ35PHAE, RAK-VJ42PHAE, RAK-VJ50PHAE
- Refrigerant Type : R410A, R32
- Power Cord Type : NYM
- Recommended Installation Height: 2300mm or more from the floor
- Distance from air outlet to fire alarm: At least 1500mm
Product Usage Instructions
Safety Precautions
Before operating the unit, carefully read and follow the safety precautions listed below:
- Use an IEC-approved power cord of type NYM.
- Ensure a stable, non-vibratory mounting location with full support for the unit.
- Avoid installation near flammable gas sources or heat sources.
- Maintain proper clearance distances as specified in the installation manual.
- Connect the earth line during installation to prevent electric shock.
- Keep the unit and remote controller at least 1m away from radio and television to avoid interference from noise.
Installation Guidelines
Follow these guidelines for proper installation:
- Request a qualified technician for installation to prevent water leakage, short circuit, or fire hazards.
- Ensure smooth water flow when installing the drain hose to avoid furniture damage.
- Avoid placing the unit near high-frequency machines and high-power wireless systems to prevent signal transmission errors.
- Mount the unit at least 2300mm above the floor and maintain a distance of at least 1500mm from the fire alarm.
Maintenance
After installation, ensure the unit operates properly by explaining the operation and maintenance guidelines to the customer as described in the user’s guide.
FAQ
- Q: Can I install the unit myself?
- A: It is recommended to request a sales agent or qualified technician for installation to avoid water leakage, electric shock, or fire hazards. Improper installation may lead to serious consequences.
- Q: How far should the unit be placed from high-frequency machines?
- A: To avoid signal transmission errors, ensure the remote controller is placed far away from high-frequency machines and high-power wireless systems.
FOR SERVICE PERSONNEL ONLY
- Carefully read through the procedures of proper installation before starting installation work.
- The sales agent should inform customers regarding the correct operation of installation.
Tools Needed For Installation Work
- (Marko is an exclusive use tool for R410A, R32) Screwdriver
- Measuring Tape
- Knife
- Saw
- 065mm PowerDrill
- Hexagonal Wrench Key
- Wrench(14,17,19,22mm) ® Gas leakage Detector
- PipeCutter
- Putty
- Vinyl Tape
- Pliers
- Flare Tool © Vacuum Pump Adapter®Manifold Valve
- Charge Hose © Vacuum Pump
SAFETY PRECAUTION
- Read the safety precautions carefully before operating the unit.
- The contents of this section are vital to ensure safety. Please pay special attention to the following sign
Be sure that the unit operates in proper condition after installation. Explain to customer the proper operation and maintenance of the unit as described in the user’ s guide. Ask a customer to keep this installation manual together with the instruction manual.
WARNING
-
Please request your sales agent or qualified technician to install your unit. Water leakage, short circuit or fire may occur if you do the installation work yourself.
-
Please observe the installation stated in the installation manual during the process of installation. Improper installation may cause water leakage, electric shock and fire. Make sure that the units are mounted at locations which are able to provide full support to the weight of the units. If not, the units ma collapse and impose danger.
-
Observe the rules and regulations of the electrical installation and the methods described in the installation manual when dealin with the electrical work. Use cables which are approved official in your country. Be sure to use the specified circuit. A short circuit an fire may occur due to the use of low quality wire or improper work.
-
Be sure to use the specified cables for connecting the indoor and outdoor units. Please ensure that the connections are tight after th
conductors of the wire are inserted into the terminals to prevent the external force is being applied to the connection section of the terminal base. Improper insertion and loose contact may cause over-heating and fire. -
Please use the specified components for installation work. Otherwise, the unit may collapse or water leakage, electric shock, fire c stronger vibration may occur.
-
Be sure to use the specified piping set for R32. Otherwise, this may result in broken copper pipes or faults.
-
When installing or transferring an air conditioner to another location, make sure that air other than the specified refrigerant(R32) does not enter the refrigeration cycle. If other air should enter, the pressure level of the refrigeration cycle may increase abnormally which could result in a rupture and injury.
-
Be sure to ventilate fully if a refrigerant gas leaks while at work. If the refrigerant gas comes into contact with fire, a poisonous gas may occur.
-
After completion of installation work, check to make sure that there is no refrigeration gas leakage. If the refrigerant gas leaks into the room, coming into contact with fire in the fan-driven heater, space heater, etc., a poisonous gas may occur.
-
Unauthorized modifications to the air conditioner may be dangerous. If a breakdown occurs please call a qualified air-conditioning
-
Be sure to use the specified cables for connecting the indoor and outdoor units. Please ensure that the connections are tight after the conductors of the wire are inserted into the terminals to prevent the external force is being applied to the connection section of the terminal base. Improper insertion and loose contact may cause overheating and fire.
-
Please use the specified components for installation work. Otherwise, the unit may collapse or water leakage, electric shock, fire or stronger vibration may occur.
-
Be sure to use the specified piping set for R32. Otherwise, this may result in broken copper pipes or faults.
-
When installing or transferring an air conditioner to another location, make sure that air other than the specified refrigerant(R32) does not enter the refrigeration cycle. If other air should enter, the pressure level of the refrigeration cycle may increase abnormally which could result in a rupture and injury.
-
Be sure to ventilate fully if a refrigerant gas leaks while at work. If the refrigerant gas comes into contact with fire, a poisonous gas may occur.
-
After completion of installation work, check to make sure that there is no refrigeration gas leakage. If the refrigerant gas leaks into the room, coming into contact with fire in the fan-driven heater, space heater, etc., a poisonous gas may occur.
-
Unauthorized modifications to the air conditioner may be dangerous. If a breakdown occurs please call a qualified air condition technician or electrician. Improper repairs may result in water leakage, electric shock, and fire, etc.
-
Be sure to connect the earth line from the power supply wire to the outdoor unit and between the outdoor and indoor unit. Do not connect the earth line to the gas tube, water pipe, lighting rod or the earth line of the telephone unit. Improper earthing may cause electric shocks.
-
When finishing the refrigerant collection (pumping down), stop the compressor and then remove the coolant pipe.
-
If you remove the refrigerant pipe while the compressor is operating and the service valve is released, air is sucked and pressure in the freezing cycle system will build up steeply, causing an explosion or injury.
-
When installing the unit, be sure to install the refrigerant pipe before starting the compressor.
-
If the refrigerant pipe is not installed and the compressor is operated with the service valve released, air is sucked and the pressure level of the refrigeration cycle may increase abnormally which could result in a rupture and injury. The electric cables should neither be reworked nor added.
-
Make sure to use an exclusive circuit breaker. Otherwise fire or electric shock might occur by connection failure, isolation failure or over current.
-
Make sure to connect cables to terminal properly and terminal cover should close firmly. Otherwise, over heating at terminal contact, fire or electric shock might occur.
-
Make sure that there is no dust on any connected points of electric cables and fix firmly. Otherwise, fire or electric shock might occur.
CAUTION
- A circuit breaker must be installed in the house distribution box for the direct connected power supply cables to the outdoor unit. In case of other installations, a main switch with a contact gap or more than 3mm has to be installed. Without a circuit breaker, the danger of electric shock exists.
- Do not install the unit near a location where there is flammable gas. The outdoor unit may catch fire if flammable gas leaks around it.
- Please ensure smooth flow of water when installing the drain hose. Improper installation may wet your furniture.
- An IEC approved power cord should be used. Power cord type: NYM.
THE CHOICE OF MOUNTING SITE
(Please note the following matters and obtain permission from the customer before installation.)
WARNING
- The unit should be mounted at stable, non-vibratory location which can provide full support to the unit.
CAUTION
- No nearby heat source and no obstruction near the air outlet is allowed.
- The clearance distances from top, right and left are specified in figure below.
- The location must be convenient for water drainage and pipe connection with the Outdoor unit.
- No nearby leakage risk of flammable gas, and no nearby source of vapor or oil smoke.
- To avoid interference from noise, please place the unit and its remote controller at least 1m from the radio and television.
- To avoid any error in signal transmission from the remote controller, please put the controller far away from high-frequency machines and high-power wireless systems.
- The installation height should be at least 2300 mm or more from the floor.
- The distance from the air outlet to the fire alarm must be at least 1500mm and there must be no fire alarm in the front direction of the indoor unit.
Figure showing the Installation of the Indoor Unit.
Installation of Hanger, Wall Penetration, and Installation of Protection Pipe
CAUTION
The draining of the water container inside the Indoor unit can be done from the left. Therefore the hanger must be fixed horizontally or slightly tilted towards the side of drain hose. Otherwise, condensed water may overflow the water container.
Direct Mounting On The Wall
Please use hidden beams in the wall to hold the hanger.
Procedures of Installation and Precautions
Procedures to fix the hanger.
- Drill holes on wall.
- Push plug into the holes.
- Fix the hanger on wall
- Procedures to fix the holder of remote control
- Drill holes on the wall.(As shown below)
- Push plug into the holes.(As shown below)
Installation Of Remote Controller
- Installation Of Remote Controller
- The remote controller can be placed in its holder which is fixed on wall or beam.
- To operate the remote controller at its holder, please ensure that the unit can receive signal transmitted from the controller at the place where the holder is to be fixed.The unit will beep when signal is received from the remote controller. The signal transmission is weakened by the fluorescent light. Therefore, during the installation of the remote control holder, please switch on the light, even during day time, to determine the mounting location of the holder.
Wall Penetration and Installation of Protection Pipe
- Drill a ø65mm hole on wall which is slightly tilted towards the outdoor side. Drill the wall at a small angle.
- Cut the protection pipe according to the wall thickness.
- Empty gap in the sleeve of protection pipe should be completely sealed with putty to avoid the dripping of rain water into the room.
- Please ensure smooth flow of water when installing the drain hose. Improper installation may wet your furniture. An IEC approved power cord should be used. Power cord type: NYM.
WARNING
Be sure that the wire is not in contact with any metal in the wall. Please use the protection pipe as wire passing through the hollow part of the wall so as to prevent the possibility of damaged by mouse. Unless it seals completely,any air with high humidity flows from outdoors and any dew may drop.
Installation Of The Indoor Unit
Cutting Low Cover bush
- While installing the pipe from the right, left or bottom side, use a knife to cut openings as shown in figure.
- Then smoothen the edges of openings with a file.
PIPING FROM THE RIGHT SIDE (BACKWARD, DOWNWARD, HORIZONTAL)
Preparation
- Connect connecting cord.
- Pull out the pipe, connecting cord and drain hose.
Installation
Insert the pipe through the wall hole.
- The upper part of the Indoor unit is hung on the hanger.
- The projection at the lower part of the Indoor unit is hooked onto the hanger.
PIPING FROM THE LEFT SIDE (BACKWARD, DOWNWARD, HORIZONTAL)
Preparation
- Changed of Drain Hose and Installation Procedures.
- Exchange the location of drain hose and drain cap while installing the pipe from the left side as shown in below. Be sure to plug in the drain hose until the insulating material folds upon itself.
CAUTION
- The rubber strap used for fixing the insulator should not be tied with great force. Otherwise,this will damage heat insulation and causes water condensation.
- Please pull the lower part of the Indoor unit outwards to check if the unit is hooked onto the hanger. Improper installation may cause vibration and noise.
- Transform the piping while holding down the lower portion of pipe support by hand.
INSTALLATION AFTER CONNECTION OF REFRIGERATING PIPES
- The refrigerating pipe should be adjusted to fit into the hole on the wall and then ready for further connection.
- The terminals of 2 connected pipes must be covered with an insulator used for terminal connection. Then the pipes are wrapped with insulation pipe.
- Connect the connecting cord after removing low cover. (Refer to “CONNECTION OF POWER CORD”)
- After adjustment, fit the connecting cord and pipes into the space available under the unit. Use a holder to hold them tight.
- Be sure to cut the extra binding band. (Otherwise, it may result in abnormal noise or dewfall
THE CONNECTION OF REFRIGERATING PIPE DURING
THE INSTALLATION OF INDOOR UNIT
Preparation To Install Refrigerating Pipes
- The refrigerating pipes and connecting cord transform and are attached.
Installation
- Hang the indoor unit onto the hanger. Use the temporary stand at the back of the Indoor unit to push its lower part 15cm forwards.
- Place the drain hose through the hole on the wall.
- Wrap the refrigerating pipes with an insulation pipe after connecting the refrigerating pipe.
- Connect the connecting cord after removing low cover. (Refer to “Connection of Power Cord”)
- After adjustment, the connecting cord and refrigerating pipes are placed into the space available under the Indoor unit.
- The projection of Indoor unit must hook to the hanger.
Heat Insulation and Finish of the Piping
- The connected terminals should be completed sealed with heat insulator and then tied up with a rubber strap.
- Do not tie the terminals with the tape too tight. If any clearance or over-tightening may cause condensation.
- Please tie the pipe and power line together with vinyl tape as shown in the figure showing the installation of Indoor and Outdoor units.
- To enhance the heat insulation and to prevent water condensation, please cover the outdoor part of the drain hose and pipe with an insulation pipe.
- Completely seal any gap with putty.
Installation of Drain Hose
CAUTION
Be sure that the drain hose is not loosely connected bend or proper condition like left figure.
CAUTION
You are free to choose the side (left or right) for the installation of drain hose. Please ensure the smooth flow of condensed water of the Indoor unit during installation. (Careless may result in water leakage.)
HOW TO REMOVE INDOOR UNIT
- Push up the [PUSH] sections at the bottom of the indoor unit and pull the bottom plate towards you. Then the claws are released from the stationary plate.
(The [PUSH] sections are indicated by 2 arrows in the right figure)
INSTALLATION OF REFRIGERATING PIPES AND AIR REMOVAL
Preparation of Pipe
- Use a pipe cutter to cut the copper pipe and remove the burr.
- Before flaring, please put on the flare nut.
Pipe Connection
CAUTION
- In case of removing flare nut of a indoor unit, first remove a nut of small diameter side, or a seal cap of big diameter side will fly out. Free from water into the piping when working.
- Be sure to tighten the flare nut to the specified torque with a torque wrench.
- If the flare nut is overtightened, the nut may be split after a long period has passed, and may cause a refrigerant leak.
- Please be careful when bending the copper pipe.
- Screw in manually while adjusting the center.
- After that, use a torque wrench to tighten the connection
Gas leakage inspection
Please use gas leakage detector to check if leakage occurs at connection of Flare nut as shown in below.If gas leakage occurs, further tighten the connection to stop leakage.
CONNECTION OF POWER CORD
WARNING
THIS APPLIANCE MUST BE EARTHED.
Detail of Cutting the Connecting Cord
Wiring of The Indoor Unit
Wiring of The Indoor Unit
- For wire connection of the Indoor unit, you need to remove the front cover, the low cover under the body of the unit and the terminal cover.
- Remove the cover from the terminal base and screw the cable.
Method to remove the low cover
How to connect the optional parts
(H-LINK RAC Adapter, Dry contact, Wired Remote Controller, Run status and alarm output)
- For cable connection to control P.W.B., you need to remove front cover and electrical box cover.
- Each connecting location is as below.
- Dry contact: CN6
- H-LINK RAC Adapter: CN7B
- Wired Remote Controller: CN20
- Relay kit for run status and alarm output: CN25
- Please check and confirm the manuals attached to each optional part for more connection details.
- Please check the service manual about how to set from remote controller.
- You can refer to this installation manual how to remove and re-attach the front cover.
- Please be careful not to damage lead wires by the edge of plate when connecting the optional parts.
- Please do the operation test after the connection.
HOW TO REMOVE OR ATTACH THE FRONT COVER
How to remove the front cover
- Remove the front panel
- Push the end of the right-side arm outward to release the tab.
- Move the left-side arm outward to release the left tab, and then pull the panel towards you. Remove the filters.
- After removing 3 screws, remove the cover of electric box,
- pull the center of the front cover towards you and release the claws.
- Pull the side faces (lower sections) of the front cover towards you as shown in the figure and remove the cover.
How to Attach the Front Cover
- After installing the front cover onto the unit, hook three claws at upper side of the cover securely. Then, push the center of the front cover to lock the claws.
- Assemble the cover of the electric box.
- Tighten the 3 screws.
- Install the filter.
- Attaching the Front Panel
- Insert the shaft of the left arm along the step on the unit into the hole.
- Securely insert the shaft of the right arm along the step on the unit into the hole.
- Make sure that the front panel is securely attached, and then close the front panel.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>