EZ-FLO EZ010-HC High Capacity Systems Instruction Manual
- June 1, 2024
- EZ-Flo
Table of Contents
- EZ010-HC High Capacity Systems
- HC TANK ASSEMBLY & PARTS LIST
- CAP Tubing Fittings: Insert & Release
- System Installation
- Main Line Connection
- Fill Tank with Product
- Gallons of Water Until Empty
- FAQ
- Troubleshooting:
- Agitation Valve Operation
- Quick Refill Guide
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
INSTALLATION AND OPERATING GUIDE
HIGH CAPACITY SYSTEMS
MODELS: EZ010-HC, EZ017-HC, EZ025-HC
(EZ025-HC PICTURED)
For an overview of the EZ-FLO System
Installation & operation:
www.ezfloinjection.com/videos/
EZ010-HC High Capacity Systems
-
IMPORTANT *
READ INSTRUCTIONS BEFORE INSTALLING THE SYSTEM
TO INSURE PROPER INSTALLATION- Do not connect to an irrigation system that is not protected by an approved back flow prevention device
- Use only with non-hazardous products
- Minimize exposure to direct sunlight to maximize service life
- Do not install if water hammer is present
- Do not install if pressure exceeds 80 PSI
HC TANK ASSEMBLY & PARTS LIST
2 – Shut Off Valves
Part # SOV (with 2 washers)
5- Feet 1/4” Black Tubing5- Feet 1/4” Black Tubing Part # BT5
3 – Tubing Clamps
(1 Extra) Part # RTC
5- Feet 1/4’’ Clear Tubing Part # CT5
For EZ-FLO Warranty information visit our website at: www.ezfloinjection.com
CAP Tubing Fittings: Insert & Release
The EZ-FLO system uses push connect fittings to connect the clear and black 1/4” tubing to the cap.
To Insert:
Step 1. Insert the end of the tubing into the appropriate side (Clear to
Green/Out and Black to Blue/In) by pressing into the hole/Collet. Press gently
until the tubing stops.
Step 2. Gently tug the tubing to insure it is locked into place.
To Remove:
Step 1. Shut off pressure to the system.
Step 2. Apply gentle pressure to the Green or Blue Collet with your
fingers.
Step 3. While holding pressure, gently pull the tubing away from the
fitting to release.
Note: Make sure to direct the fitting away from your face and body. A
small amount of residual pressure may be in the tank and cause a momentary
release of fluid.
System Installation
Typical installation
The EZ-FLO Mainline Injection Systems are normally installed in a valve box,
connected to the main line of the irrigation system after the back flow
preventer. This will allow the system to inject to any irrigation zone valve
located after the installation point. One unit will feed both drip and
sprinkler zones automatically adjusting for pressure and flow.
Step 1 – Locate the installation point and pipe size
- Connection must be made after an approved back flow prevention device.*
- The connection can be made either in the irrigation main line. vertically or horizontally
- The connection may be installed the tank without issue.above or below
- The connection may be from the back flow prevention device.any distance
- Multi-zone insallation feeds all irrigations zones
- Single zone feeds only one zone
Use only the correct size connection for the installation as indicated on the CBV box label.
Part# | Mainline Size |
---|---|
CBV-100 | 3/4” & 1” |
CBV-125 | 1.25” |
CBV-150 | 1.5” |
CBV-200 | 2” |
CBV-250 | 2.5” |
CBV-300 | 3” |
CBV-400 | 4” |
Saddle kits & C-Spools available for larger main line connections.
Do not use reducing bushings on the CBV unless directed to by an EZ-FLO
representative (does not apply to CBV-100).
If your irrigation mainline has multiple diameters, such as a pump discharge
to a larger mainline, it is best to install in the smallest diameter available
to obtain best performance.
*Installations on a mainline may only be used with a mainline rated system. Installations after a zone valve or on a well may not be subject to the same back flow requirements.
Main Line Connection
Step 2 – Shut of water and relieve pressure
You can use the valve on the back flow prevention device (pictured) or shut
off your water main.
Step 3 – Cut out a section of pipe slightly larger than the cut out length of the coupling.
Step 4 – Glue the coupling into the line.
CBV-100 ONLY
USE INCLUDED REDUCING BUSHINGS FOR 3/4” PVC INSTALLATION
Step 5 – Attach tubing to the coupling.
ATTACH BLACK TUBING TO BLUE FITTING, CLEAR TUBING TO GREEN FITTING AND SECURE
WITH TUBING CLAMPS
Connect Cap to Irrigation System
Step 6
Turn shut off valves to the off position (shown)
Turn water on at back flow preventer
Connect blue connector to water IN connection by pressing the black tubing into the blue fitting
Connect green connector to fertilizer OUT connection by pressing the clear tubing into the blue fitting
*Refer to page 3 for detailed tubing operation
Fill Tank with Product
Step 7 – The EZ-FLO system can be filled with any liquid or water soluble
product. EZ-FLO MAXXPRODUCTS are specifically designed for use with
fertigation and all irrigation systems.
Fill the tank based on the product’s coverage recommendations or capacity.
Typical fertilizer coverage rate:
Liquid- 1 Gallon per 10,000 sqft every 4 to 8 weeks
Powder- 1 Pound per 1,000 sqft every 4 to 8 weeks
Remove fill cap and pour fertilizer directly into tank through the opening and then top off with water until all air is gone from the tank. If your fertilizer is not colored, add blue or green dye.
Model | Tank Size | Maximum Capacity |
---|---|---|
EZ010-HC | 10.0 Gallon | 75 lbs dry or 10.0 gal liquid |
EZ017-HC | 17.5 Gallon | 150 lbs dry or 17.5 gal liquid |
EZ025-HC | 23.0 Gallon | 225 lbs dry or 23.0 gal liquid |
- ALL TANK CAPACITIES ARE APPROXIMATE *
DO NOT LEAVE AIR IN THE TANK
Air will fracture the tank and is not covered by the warranty. Check that the
o-ring is in place prior to replacing fill cap.
Connector Calibration – Coupling Ball Valve
The CBV connection must be calibrated to the flow rate of your irrigation
system. If the irrigation system is higher flow, primarily composed of spray
heads or larger drip irrigation zones, adjustment to the CBV may not be
required.
The EZ-FLO system must be full of fertilizer which provides a color that can
be used to indicate flow through the clear line. If your fertilizer is not
colored, add blue or green dye to the tank.
Start by setting the proportioning cap adjustment setting to the and the fast
position CBV in full open position.
Step 9 – Turn on a sprinkler or drip zone with the closest to average
gallons per minute flow rate and watch the clear, fertilizer-out tubing for
color.
If color is steadily flowing through the clear output tube, the CBV does not
require adjustment. Please note the color in the tube will be lighter than the
color in the tank due to the mixing.
If color is not flowing through the clear tubing, slowly turn the CBV to the
closed position in small increments, stopping once color begins to flow.
Once color is visible, you no longer have to adjust the CBV connection. You
may leave it in position permanently.
To prove the system is working, adjust the feed setting on the cap, back and
forth. While the irrigation system is running, turn the knob from slow to
fast, and fast to slow. Each time you adjust the knob to a new setting, the
color in the tube will change. Slower settings are lighter and faster setting
are darker.
Once all is confirmed, leave the handle in the calibrated position, and set
the proportioning cap feed rate to the desired setting per your systems
instructions.
For additional information, please read the FAQ/ Troubleshooting in the CBV
instruction manual.
Set Flow Adjustment
Step 10 – Set the flow rate by turning the adjustment knob to the proper
setting.
Slow Setting – is used for normal and most common setting in regions with
high watering requirements such as hot dry climates or sandy soils.
#1 Setting – is used for normal maintenance in regions with more moderate
climates and moderate watering schedules where soils have good moisture
retention.
#2 Setting – is used to encourage fast growth or to quickly improve the
condition of a landscape in poor condition. The unit will empty more quickly
and can be refilled more often.
Fast Setting – is used to for periodic fertilization. The unit will empty
more quickly and can be refilled more often.
Setting| Ratio| OZ. of fertilizer per gal. of water| Based
on Watering Frequency
---|---|---|---
Slow| 15000:1| .008 (1/20 tsp)| 4+ days per week
1| 8000:1| .017 (1/10 tsp)| 3 days per week
2| 2000:1| .064 (2/5 tsp)| 2 days per week
Fast| 400:1| .320 (2 tsp)| 1 day per week
PROPORTIONING CAP
*Ratio refers to the amount of water
mixed with the fertilizer. For example, a 400:1 ratio means 400 gallons of
water will be mixed with 1 gallon of fertilizer. The adjustment knob can be
set in between settings if desired. These ratios are approximate because feed
rates can vary by the type of product being distributed. Ratios are provided
as a general guideline only. The watering frequency guideline is general and
for convenience only. Additional caution and care should be taken when using a
feed setting faster than #1.
Gallons of Water Until Empty
The following table shows the approximate gallons of water required to distribute the fertilizer from the EZ-FLO system at the various flow settings.
Model | EZ001-CX | EZ003-CX | EZ005-FX | EZ010-FX |
---|---|---|---|---|
Slow | 22,500 | 37,500 | 67,500 | 127,500 |
# 1 | 12,000 | 20,000 | 36,000 | 68,000 |
# 2 | 3,000 | 5,000 | 9,000 | 17,500 |
Fast | 600 | 1,000 | 1,800 | 3,400 |
More detailed application instructions are available on our website: www.ezfloinjection.com
FAQ
How much product to put into the tank:
Refer to the product label and tank capacity from page 6. Additional information is on our website
What fertilizer can I use:
Almost any liquid or water soluble powder product. Do not use dry broadcast fertilizers
Can I use weed killer/ herbicide in the system:
Typically no, hazardous products are not recommended for use in the EZ-FLO system.
What cap setting should I use:
Slow and #1 are the most common cap settings. Page 9 offers more details on each setting
How often do I need to refill:
This will vary on landscape size and watering schedule but typically every 4 to 8 weeks
How do I know when to refill:
How do I know when to refill: The system can be checked for color by in the clear output tubing during irrigation operation. If the fertilizer color is gone, you need to refill the system. Alternatively, you may let the system run without fertilizer (just water) and refill based on a set schedule.
How do I know it is working:
When the irrigation system is running watch the clear output tube for color. You may adjust the cap from slow to fast to see the color change. You can use blue or green food dye to add color to the fertilizer.
Will I over fertilize:
No, the EZ-FLO injection process micro doses products but we do recommend caution when using new products and faster feed settings.
Will the system clog drip irrigation:
No. EZ-FLO and Maxx-Products can help clean drip systems and make them work effectively.
If product is mixed with water, will it dilute:
No, the patented process and agitation valve control dilution of compatible products
Will the fertilizer stain:
Not if using EZ-FLO recommended products. Check other manufacturers labels if not using EZ-FLO brands
How do I winterize the system:
Simply close the shut off valves, disconnect it from the irrigation system and drain the tank
The system is emptying too fast:
Confirm you used the correct cap setting and check the “Connector Calibration” page and adjust the CBV to a more open position.
My system is always full of water, is it working:
Yes! This is part of our patent and you can review the videos on our website to see how it works
Troubleshooting:
I cannot see color when closing the ball valve:
Confirm you have set the knob to fast.
Check to see that both shut off valves on the tubing are open.
Confirm you have a zone of irrigation running (water flowing).
Confirm you have added enough fertilizer and that it has a color.
For more information and videos
Agitation Valve Operation
(Optional)
When using fully concentrated water soluble powders, it is recommended to have
the Agitation Valve ON.
In the ON position, the agitation continues to stir and dissolve concentrated
product at the bottom.
Significant dilution of the solution does not occur until the powder has fully
dissolved.
If only liquid is used, a slow steady dilution can occur at faster feed rates.
The ON position is illustrated by the image in figure 1.
When using fully concentrated liquid, diluted liquid, or dissolved powder
products, it is recommended to have the Agitation Valve OFF.
In the OFF position, the agitation no longer mixes at the bottom.
Significant dilution of the solution does not occur*
The OFF position is illustrated by the image in figure 2.
*EZ-FLO tested the Agitation Valve with standard mineral fertilizers, micro nutrients, and acids. Observed variations are +/- 5%. Some products, primarily organic supplements, and humic acids, will leave residue and cloud the solution even when dispensed accurately.
Quick Refill Guide
Step 1 – Turn off the water using the Shut Off Valves, both valves must be closed
Step 2 – Open drain plug & remove fill cap
CAUTION: the system is under pressure, open slowly to allow for the
pressure to safely vent Grab the tab/handle on the drain plug and turn to the
left
There is no need to completely remove the plug, the side ports will drain the
fluid. Some products may leave a slight residual.
This may be left in the tank or flushed out.
Step 3 – Fill tank with product
Reference fill section for maximum capacities.
Results depend on product quality, use MAXX-PRODUCTS for best performance
Step 4 – Fill tank with water by opening Shut Off Valve or hose until
full
DO NOT LEAVE AIR IN THE TANK
Step 5 – Screw on fill cap & turn on both Shut Off Valves
*Check to make sure o-ring is in place under the cap prior to screwing the cap back on.
© 2024, EZ-FLOTM injection Systems
www.ezfloinjection.com