Hudson Yards Large Commercial Playground System for Kids and Teens Instruction Manual
- June 1, 2024
- Hudson Yards
Table of Contents
- Post Installation
- Square Deck Installation
- Rectangle Deck Installation
- 36” Transfer Station (for 3.5” post) Install
- D-Rail Installation
- Pebble Climber Installation
- 12-inch Middle Stair Installation
- 4-foot Double Wave Slide Installation
- 3.5-inch Maze Panel Installation
- 4.5-inch 2-Clamp Arch Rail Installation
- Pod Climber Installation
- Overhead Snake Loop Ladder Installation
- 3.5inch Bench Panel Installation
- Rain Wheel Installation
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Hudson Yards Large Commercial Playground System for Kids and Teens
Instruction Manual
Post Installation
STEP: 1
DO NOT CEMENT POSTS INTO PLACE UNTIL THE ENTIRE STRUCTURE IS
ASSEMBLED.
Refer to the General Installation guide footing information and dig proper
holes for the support posts.
Square Deck Installation
STEP: 1
After the posts are in place, using four (4) M10*35 bolts, eight (8) M10
washers, and four (4) M10 lock nuts, attach each square deck to each
preattached deck clamp as shown in the image.
Deck clamps are pre-attached to the posts and should not be altered in any
way.
Rectangle Deck Installation
STEP: 1
After the posts are in place, using four (4) M10*35 bolts, eight (8) M10
washers, and four (4) M10 lock nuts, attach the rectangle deck to each pre-
attached deck clamp as shown in the image.
Deck clamps are pre-attached to the posts and should not be altered in any
way.
-inch Clamp Installation Guide
inch Flat Clamp
Connect half of the flat clamp to the component using one (1) M8*40 bolt.
Then, using the other half of the flat clamp and the hardware provided in the
clamp hardware bag, attach the other half of the tube clamp around the post.
inch Tube Clamp
Connect half of the clamp to the component using one (1) M8*30 bolt. Then,
using the other half of the tube clamp and the hardware provided in the clamp
hardware bag, attach the other half of the tube clamp around the post.
inch Clamp Installation Guide
inch 90-Degree Flat Clamp
Connect half of the flat clamp to one panel using one (1) M8*40 bolt. Then,
using the other half of the flat clamp and the hardware provided in the clamp
hardware bag, attach the other half of the tube clamp around the post. Then,
attach the next panel to the other side of the clamp using the same process.
inch Double Slide Clamp
Connect half of the double slide clamp to the double slide hood using one
(1) M8*30 bolt. Then, using the other half of the clamp and the hardware
provided in the clamp hardware bag, attach the other half of the tube clamp
around the post.
36” Transfer Station (for 3.5” post) Install
STEP: 1
Connect half of the 3.5-inch tube clamp to the handrail using one (1) M830
bolt. Set the handrail into place, then attach the second half of the clamp
using the hardware provided in the clamp bag. Repeat this process for the
other handrail.
STEP: 2
Using three (3) M1025 bolts, six (6) M10 washers, and three (3) M10 lock
nuts, attach the top of the stairs to the square deck.
STEP: 3
Using four (4) M10*25 bolts, eight (8) M10 washers, and four (4) M10 lock
nuts, connect the bottom of the handrails to the bottom of the 3-foot transfer
stair.
STEP: 4
Using two (2) M10*25 bolts, four (4) M10 washers, two (2) lock nuts, attach
the handrail to the square deck.
STEP: 5
Using three (3) M10*25 bolts, six (6) M10 washers, and three (3) M10 lock
nuts, attach the ADA transfer deck to the base of the 3-foot ADA transfer
stair.
STEP: 6
See general installation guide regarding footing information for the
transfer deck handrail & mount.
Using two (2) M10*65 bolts, four (4) M10 washers, and two (2) M10 lock nuts,
attach the transfer handrail to the ADA transfer deck.
STEP: 7
Using two (2) M10*25 bolts, four (4) M10 washers, and two (2) lock nuts,
attach the transfer deck mount to the ADA transfer deck.
STEP: 8
See general installation guide regarding footing information for the ADA
transfer step mount. Using two (2) M10 bolts, four (4) M10 washers, and two
(2) M10 lock nuts, attach the transfer step to each ADA transfer step mount.
STEP: 9
Using three (3) M10*25 bolts, six (6) M10 washers, and three (3) M10
washers, attach the top of the ADA transfer step to the ADA transfer deck.
D-Rail Installation
STEP: 1
Take two (2) 3.5-inch tube clamps and connect half of the clamps both ends of
the D-Rail using one (1) M8*30 bolt. Then, using the other half of the tube
clamp and the hardware provided in the clamp hardware bag, attach the other
half of the tube clamp around the post to the D-Rail. Repeat this process for
the other D-Rail.
Pebble Climber Installation
STEP: 1
See general installation guide regarding footing information.
Pebble climber requires a 12” x 18” footing.
12-inch Middle Stair Installation
STEP: 1
Using eight (6) M1025 bolts, twelve (12) M10 washers, and six (6) M10 lock
nuts, attach the 12-inch middle stair to the assigned decks.
STEP: 2
Then, once the stair is in place, attach the 12-inch connection handrail to
the posts using four (4) 3.5-inch tube clamps, and four (4) M830 bolts. Then,
attach the bottom of the handrails to the decks using one (1) M10*25 bolt, two
(2) M10 washers, and one (1) M10 lock nut for each attachment point.
4-foot Double Wave Slide Installation
STEP: 1
Attach the deck climber extension to the proper deck using four (4) M10*25
bolts, eight (8) M10 washers, and four (4) M10 lock nuts.
STEP: 2
Then, See general installation guide regarding footing information for the
double slide end mounts. Using two (2) M820 bolts, two (2) M8 spring gaskets,
and two (2) M8 washers, attach the slide end mounts to the double
slide.
STEP: 3
Then, attach the slide to the deck extension using four (4) M1045 bolts,
eight (8) M10 washers, and four (4) M10 lock nuts.
STEP: 4
Once the slide is attached, take the double slide hood and insert hood into
the top of the slide, and then attach the top using two (2) double slide
clamps, and two (2) M8*30 bolts.
3.5-inch Maze Panel Installation
STEP: 1
Connect the bottom of the panel to the deck using two (2) M10*50 bolts,
four (4) M10 washers, and two (2) M10 lock nuts. Then attach the top of the
panel to the posts using two (2) flat clamps.
4.5-inch 2-Clamp Arch Rail Installation
STEP: 1
Attach the Arch Rail to the designated posts by connect half of the tube
clamp to the arch rail using one (1) M830 bolt. Repeat this process for each
post attachment point. Then, attach the rail to the deck using two (2) M1025
bolts, four (4) M10 washers, and two (2) M10 lock nuts. Finally, attach the
second half of the clamp around the post.
Pod Climber Installation
STEP: 1
See general installation guide regarding footing information for the pod
climber. Attach the circle end mount to the bottom of the climber using the
pre-attached hardware. Each attachment uses three (3) M10*20 bolts, three (3)
M10 spring gaskets, and one (3) M10 large gaskets.
STEP: 2
Attach the top of the climber to the designated arch rail top bracket using
one (1) M10*20 bolt, one (1) M10 spring washer, and one (1) M10 washer.
Overhead Snake Loop Ladder Installation
STEP: 1
Attach the Overhead Snake Ladder to the designated posts by connect half of
the tube clamp to the ladder using one (1) M8*30 bolt. Repeat this process for
each attachment point. Set the ladder into place, then attach the second half
of the clamp around the post.
3.5inch Bench Panel Installation
STEP: 1
Attach the Bench Panel to the designated posts using four (4) 3.5- inch
flat clamps, and four (4) M8*25 bolts.
Rain Wheel Installation
STEP: 1
Detach half of the tube clamp connected to the Rain Wheel, and reattach the
clamp around the support post, as shown in the picture. Recommended install
height is 20 to 36 inches above surfacing depending on age range.
10859 E Washington Street, Ste. 200
Indianapolis, IN 46229
1-800-667-0097
Created By: Aaron Price
Date: 03/29/2018
Page 1 of 1 (Rain Wheel Installation)
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>