VIXSON Paving Mold User Manual

June 1, 2024
VIXSON

VIXSON Paving Mold

VIXSON-Paving-Mold-product-image

Product Information

Specifications:

  • Size: 36 cm x 36 cm

Instructions for Use:

  1. Place the mold on a relatively flat surface. For best results, remove the top 2 cm of soil and level the mold before filling it with concrete. (Use the removed soil to fill the spaces on the sides and between the pavers).
  2. Thoroughly mix the concrete until it resembles plastic. If additional water is needed, add small amounts until you achieve the correct consistency.
  3. Fill each space of the mold with a bucket or masonry trowel.
  4. When the concrete is not completely set, level the surface with a masonry trowel.
  5. Then remove the mold.
  6. After removing the mold, level all edges with a masonry trowel until you are satisfied with the appearance. To make the work easier, dip the trowel in water.
  7. Place the mold next to the finished paver and continue with the previous steps until you finish the project.

Cleaning:
The paving mold can be cleaned with water and soap and dried with a dry cloth.

FAQ (Frequently Asked Questions)

  • Q: How long should the concrete dry for maximum strength?
    A: The concrete must dry for at least 5-7 days for maximum strength.

  • Q: How can I accentuate the joints between the pavers?
    A: You can accentuate the joints between the pavers with a mixture of sand and soil. Place the dry mixture in the cracks, level it to the desired height, moisten with water, and let it harden.

  • Q: What should I do if I need to adjust the appearance after removing the mold?
    A: You can level all edges with a masonry trowel until you are satisfied with the appearance. Dip the trowel in water to make the work easier.

USER MANUAL

CONTENT OF THE PACKAGE
1 x paving mold

SPECIFICATIONS

Size 36 cm x 36 cm.

INSTRUCTIONS FOR USE

  1. Place the mold on a relatively flat surface. For best results, remove the top 2 cm of soil and level the mold before filling it with concrete. (Use the removed soil to fill the spaces on the sides and between the pavers).
  2. Thoroughly mix the concrete until it resembles plastic. If additional water is needed, add small amounts until you achieve the correct consistency.
  3. Fill each space of the mold with a bucket or masonry trowel.
  4. When the concrete is not completely set, level the surface with a masonry trowel.
  5. Then remove the mold.
  6. After removing the mold, level all edges with a masonry trowel until you are satisfied with the appearance. To make the work easier, dip the trowel in water.
  7. Place the mold next to the finished paver and continue with the previous steps until you finish the project.

CAUTION!
For maximum strength, the concrete must dry for at least 5-7 days. Once the concrete is completely dry, you can accentuate the joints between the pavers with a mixture of sand and soil. Place the dry mixture in the cracks and level it to the desired height. Moisten the mixture with a little water (not too much) and let it harden. That completes the project.

CLEANING

The paving mold can be cleaned with water and soap and dried with a dry cloth.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals