VIXSON Paving Mold
Product Information
Specifications:
- Size: 36 cm x 36 cm
Instructions for Use:
- Place the mold on a relatively flat surface. For best results, remove the top 2 cm of soil and level the mold before filling it with concrete. (Use the removed soil to fill the spaces on the sides and between the pavers).
- Thoroughly mix the concrete until it resembles plastic. If additional water is needed, add small amounts until you achieve the correct consistency.
- Fill each space of the mold with a bucket or masonry trowel.
- When the concrete is not completely set, level the surface with a masonry trowel.
- Then remove the mold.
- After removing the mold, level all edges with a masonry trowel until you are satisfied with the appearance. To make the work easier, dip the trowel in water.
- Place the mold next to the finished paver and continue with the previous steps until you finish the project.
Cleaning:
The paving mold can be cleaned with water and soap and dried with a dry
cloth.
FAQ (Frequently Asked Questions)
-
Q: How long should the concrete dry for maximum strength?
A: The concrete must dry for at least 5-7 days for maximum strength. -
Q: How can I accentuate the joints between the pavers?
A: You can accentuate the joints between the pavers with a mixture of sand and soil. Place the dry mixture in the cracks, level it to the desired height, moisten with water, and let it harden. -
Q: What should I do if I need to adjust the appearance after removing the mold?
A: You can level all edges with a masonry trowel until you are satisfied with the appearance. Dip the trowel in water to make the work easier.
USER MANUAL
CONTENT OF THE PACKAGE
1 x paving mold
SPECIFICATIONS
Size 36 cm x 36 cm.
INSTRUCTIONS FOR USE
- Place the mold on a relatively flat surface. For best results, remove the top 2 cm of soil and level the mold before filling it with concrete. (Use the removed soil to fill the spaces on the sides and between the pavers).
- Thoroughly mix the concrete until it resembles plastic. If additional water is needed, add small amounts until you achieve the correct consistency.
- Fill each space of the mold with a bucket or masonry trowel.
- When the concrete is not completely set, level the surface with a masonry trowel.
- Then remove the mold.
- After removing the mold, level all edges with a masonry trowel until you are satisfied with the appearance. To make the work easier, dip the trowel in water.
- Place the mold next to the finished paver and continue with the previous steps until you finish the project.
CAUTION!
For maximum strength, the concrete must dry for at least 5-7 days. Once the
concrete is completely dry, you can accentuate the joints between the pavers
with a mixture of sand and soil. Place the dry mixture in the cracks and level
it to the desired height. Moisten the mixture with a little water (not too
much) and let it harden. That completes the project.
CLEANING
The paving mold can be cleaned with water and soap and dried with a dry cloth.