Spectrum SIEN4880BKEC Sienna Universal Handing Black PVC Accordion Door Instruction Manual

June 1, 2024
SPECTRUM

Spectrum SIEN4880BKEC Sienna Universal Handing Black PVC Accordion Door

Spectrum-SIEN4880BKEC-Sienna-Universal Handing-Black-PVC-Accordion-Door-
product

Specifications

  • Handle
  • 8 Top Glides (1 Spare)
  • 1 Overhead Track
  • 1 T Style Top-Glide
  • 1 Magnetic Latch Striker Plates
  • 1 Tube of Track Lubricant
  • 3 Flathead Screws
  • 12 Track & Anchor Screws (1 Spare)
  • 2 Handles Pins
  • Female & Male Connectors

Product Usage Instructions

Door Installation

  1. Measure the Door Opening: Ensure the door height fits the opening. Trim if necessary.
  2. Install the Top Track: Position and secure the top track at the top of the door opening.
  3. Install the Handles: Attach the handles to the door panels.
  4. Install The Top Glides: Position and secure the top glides on each panel.
  5. Install the Door Panels: Apply lubricant and slide the panels onto the track.
  6. Secure The Top Track: Secure the track with screws for smooth operation.
  7. Secure The Anchor Panel: Secure the anchor panel to the jamb to complete installation.

Frequently Asked Questions (FAQ)

  • Q: Can I alter the width of the door?
    A: No, the width of the door cannot be altered.

  • Q: What should I do if my door opening is less than 80 inches high?
    A: If the opening is less than 80 inches high, you may need to trim the door panels using a saw.

  • Q: Where should I apply the track lubricant?
    A: Apply track lubricant to each top glide before installing the door panels.

SIENNA

INSTALLATION INSTRUCTIONS

For quick and easy installation of your folding door, read these instructions thoroughly. A few minutes of prior planning will make the job easier and will ensure years of trouble-free use.

The Tools You Will Need

  • Small #1 Phillips type screwdriver • tape measure
  • small nail • 3/32” drill bit for pilot holes • hacksaw or fine tooth saw (saw needed to trim top track for the appropriate width or to trim height of panels if opening is less than 80” high) • masking tape (to secure doors if trimming is necessary)
  • Safety glasses.

Spectrum-SIEN4880BKEC-Sienna-Universal Handing-Black-PVC-Accordion-Door-
\(1\)

Door Parts Location

Spectrum-SIEN4880BKEC-Sienna-Universal Handing-Black-PVC-Accordion-Door-
\(2\)

SINGLE DOOR INSTALLATION

  1. Measure the Door Opening
    If the height of your door opening is approximately 80”, you will not need to alter the door itself. If the opening is less than 80” high, the door may be shortened by sawing off excess from the bottom of the door panels (end without holes).
    If you need to trim the height of the door: Stack the door panels together, secure with masking tape and cut with a hacksaw or fine tooth saw. Cut the overhead track 1/8” shorter than the width of the opening.
    The width of the door cannot be altered.

  2. Install the Top Track
    Position the top track on the top of the door opening so that it is straight and centered. After making a pilot hole (with a nail or 3/32” drill bit), drive a track screw through the screw hole nearest the center of the track. not tighten. (Tape may be used to hold the in place while you mark and drill.)

  3. Install the Handles
    Tap the two handle attachment pins into one handle, then fit the pins through the door panel holes. Press the other handle onto the pins. If necessary, you may back one handle with a solid object and tap the other handle alternately over each pin area until the handles are seated. Do not strike the middle of either handle.

  4. Install The Top Glides
    Position top glides over holes on top each full width panel. Snap top glides into place and make sure they are secure. To secure the T-style lead edge top glide, place the T shaped part inside the lead edge and align the holes. Then insert the female section from the outside hole through the hole in the T shaped glide through the other side of the lead edge.
    Then insert the threaded male screw into the female part and tighten until snug.Spectrum-SIEN4880BKEC-Sienna-Universal Handing-Black-PVC-Accordion-
Door- \(6\)

  5. Install the Door Panels
    Apply track lubricant to each top glide. Swing one end of the top track out of the door opening to accept the top glides. Decide if you want the door to open from the left or the right, then slide all top glides onto the track. Stack the panels together near the center screw.Spectrum-SIEN4880BKEC-Sienna-
Universal Handing-Black-PVC-Accordion-Door- \(7\)

  6. Secure The Top Track
    Swing the track back to its original position. After making pilot holes (with a nail or a 3/32”drill bit), drive the track screws through all track holes. Set all screws as straight and tight as possible to ensure smooth operation of the door.

  7. Secure The Anchor Panel
    Slide the entire door against the non-opening side of the doorway. With the door panel hanging naturally, locate the holes on the anchor panel where the door will be secured to the jamb.
    Using the drill, insert the screws and secure the end anchor panel to the jamb.

  8. Install Magnetic Latch Striker Plate
    Place the magnetic latch striker plate against the magnet on the lead edge. Close the door until it strikes the door jamb. Mark the top and bottom location of the striker plate on the jamb. Align the striker plate on the marked location and secure to the jamb with two flathead screws.Spectrum-
SIEN4880BKEC-Sienna-Universal Handing-Black-PVC-Accordion-Door-
\(10\)

Double Door Installation

Doors can be used as a Double door but due to the magnets, there will be approximately a 0.25” gap when the doors are in the closed position.

  1. Measure the Door Opening
    Divide the width of the opening by two. Cut each top track to this measurement so that when installed, the tracks butt against one another in the center of the door opening.

  2. Install One Top Track
    On a center line drawn across the top of the door opening, install either half track and install all screws in the half track.

  3. Install the Handles
    Tap the two handle attachment pins into one handle, then fit the pins through the door panel holes. Press the other handle onto the pins.
    Repeat with the other handle.

  4. Install the Top Glides
    Position top glides over center holes on top of each full width panel. Snap top glides into place and make sure they are secure.
    To secure the T-style lead edge top glide, place the T shaped part inside the lead edge and align the holes. Then insert the female section from the outside hole through the hole in the T shaped glide through the other side of the lead edge. Then insert the threaded male screw into the female part and tighten until snug. Repeat with the other door.

  5. Install Second Track and Door Panels
    Apply track lubricant to each top glide. Install the two doors in the half track with lead edges facing each other. Then install the second track and push one door onto this track. Set a screw at the track center joint and leave the screw projecting down 1/2” to prevent glides from passing the joint.

  6. Secure Anchor Panels
    Slide one door against the door jamb. With the door panel hanging naturally, locate the holes on the anchor panel where the door will be secured to the jamb. Using the drill, insert the screws and secure the end anchor panel to the jamb. Repeat with the other door. To close the doors, pull together until

LTL HOME PRODUCTS, INC.
125 Route 61  Schuylkill Haven, PA 17972
1.800.360.1585  fax 570.385.5475
www.ltlhomeproducts.com 
e-mail: info@ltlhomeproducts.com
Installation pdfs, videos, warranty registration and replacement parts can be found on our website under the Product Support section.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SPECTRUM User Manuals

Related Manuals