TECHNICAL DATA
| Performance|
---|---|---
Nominal Voltage| 51.2 Vdc
Nominal Capacity| 104Ah
Battery Energy1| 5320 Wh
Charge Voltage| 55.68~56.16Vdc
Discharge Voltage| 45.6-56.16 Vdc
Nominal Charge/Discharge Current| 50A
Nominal Charge/Discharge Power| 2500W
Max Charge / Discharge Current| 100A
Max Charge / Discharge Power| 5000W
Short Circuit Current| 350A
Communication
Display| SOC status indicator, LED indicator
Communication| RS232, RS485, CAN
General Specification
Dimension( W×D×H mm )| 450×150×533mm
Weight (Kg)| 45kg
Installation| Floor stand or Wall mounted
Working Temperature2| -20ºC ~ 60ºC
Storage Temperature
| ≤25ºC, 12 months
≤35ºC, 6 months
≤45ºC, 3 months
General Specification
Operating / Storage / humidity| ≤ 95%RH
Max Operating Altitude| ≤2000m
IP Rating| IP20
Cell Technology| LiFePO4, Lithium-iron Phosphate
Cycle life3| 6000 Cycles @ 80% DOD / 25ºC / 0.5C, 60% EOL
Scalability| Max 8 batteries in parallel
Standard Compliance
Certification
| PACK:UN38.3, IEC62619, IEC61000, CELL:UN38.3,
IEC62619, UL 1642, JET (more available upon re- quest)
Ordering and Deliverable Part
Product ordering part
| SUN-BATT-5.32 battery SUN-BATT-5.32 parallel cable
SUN-BATT-5.32 to PCS cable
PLEASE NOTE
Operating current derating according to cell voltage and battery temperature.
- Test conditions: 100% depth of discharge (DoD), 0.2C rate charge & discharge at 25ºC;
- Charge/discharge derating occurs when the operating temperature from -10ºC to 5 ºC & 45ºC to 55ºC.
- Condition apply. Refer to SUN-BATT-5.32 Warranty Letter
PRODUCT OVERVIEW
Brief Introduction
SUN-BATT-5.32 is a lithium battery with an operating voltage range between 45.6~56.16V. It is designed for residential energy storage applications and works together with a 48v battery hybrid inverter. SUN-BATT-5.32 is not suitable for supporting life-sustaining medical devices. SUN-BATT-5.32 has built-in BMS (Battery Management System), which can manage and monitor cells information including voltage, current and temperature. Besides that, BMS can balance cells charging to extend cycle life. BMS has protection functions including over-dis- charge, over-charge, over-current and high/low temperature; the system can automatically manage charge state, discharge state and balance state. Multiple SUN-BATT-5.32 can be connected in parallel to expand capacity and power, 8 SUN-BATT-5.32 can be connected in parallel at most.
Interface Introduction
Switch ON/OFF
-
Switch ON
For single SUN-BATT-5.32, switch ON rocker switch, then long press (more than 3 seconds) ON/OFF button on front panel, LED will flash, then battery will operate normally. L1 to L6 shows battery SoC, L7/L8 shows battery status. For multiple SUN-BATT-5.32 in parallel, switch ON rocker switch on all batteries, long press (more than 3 seconds) ON/OFF button of MASTER battery, LED will flash, battery system will automatically encode and assign ID to each slave battery, then battery system will operate normally. -
Switch OFF
Press start button of Master PACK more than 3s and then release the button, the master pack will shut down after all slave packs shut down(Sleep mode) . For single SUN-BATT-5.32, switch OFF rocker switch. For multiple SUN-BATT-5.32 in parallel, switch OFF rocker switch on MASTER battery first. Then switch OFF rocker switch on all slave batteries
LED Indicator Definition
Note :
- flash 1 – 0.25s light / 3.75s off
- flash 2 – 0.5s light / 0.5s off
- flash 3 – 0.5s light / 1.5s off
Charging Battery Level Indicators Instructions:
Discharging Battery Level Indicators Instructions:
CAN / RS485 Port
CAN / RS485 Communication Terminal (RJ45 port), connect to inverter, follow
CAN / RS485 protocol.
PIN | Definition |
---|---|
Pin 1, Pin 8 | RS485-B ( to PCS, reserved ) |
Pin 2, Pin 7 | RS485-A ( to PCS, reserved ) |
Pin 3 | NC |
Pin 4 | CANH ( to PCS ) |
Pin 5 | CANL ( to PCS ) |
Pin 6 | GND |
RS232 Port
RS232 Communication Terminal (RJ45 port) follow RS232 protocol, for
manufacturer or professional engineer to debug or service.
PIN | Definition |
---|---|
Pin 1, Pin 8 | GND |
Pin 2, Pin 7 | RS232_TX |
Pin 3, Pin 6 | RS232_RX |
Pin 4, Pin 5 | NC |
INSTALLATION GUIDE
Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Therefore, check the outer packing materials before installing the battery.
Checking the surface of packing materials for damage, such as holes and
cracks. If any damage is found, do not unpack the battery and contact the
dealer as soon as possible. You are advised to remove the packing materials
within 24 hours before installing the battery.
Checking Deliverables
After unpacking the battery, check whether deliverables are intact and
complete. If any damage is found or any component is missed, contact the
dealer. The below table shows the components and mechanical parts that should
be delivered.
Tools
Installation Requirements
Installation Environment Requirements
- Install the battery in the indoor environment.
- Place battery in secure location away from children and animals.
- Do not place the battery near any heat sources and avoid sparks.
- Do not expose the battery to moisture or liquids.
- Do not expose the battery to direct sunlight.
Installation Carrier Requirements
- Only mount battery on fire resistant building. Do not install batteries on flammable buildings.
- Battery is quite heavy, make sure the wall/ground can meet the load bearing requirements
Installation Instructions
Dimensions
Minimum mounting distance between battery pack and equipment:
Installation Procedure
STEP 1
Drill the hole with an 10mm drill bit as follows and fix the wall bracket to
the wall.
STEP 2
Install the hanging bracket
STEP 3
Hang SUN-BATT-5.32 on the wall bracket and tighten it.
STEP 4
Connect to ground.
STEP 5
Connect power cable.
STEP 6
Connect communication cable.
STEP 7
Connect communication cable.
BATTERY POWER AND COMMUNICATION CONNECTIONS
Parallel Cascade Connection
Applicable scenario:
- PCS with 100A charge/discharge current connect to SUN-BATT-5.32
Power Cable Wiring Instructions
Each SUN-BATT-5.32 has two pairs of power cable terminals, two P+, and two P-. The connec- tion terminals of each pair have the same function.
Single Module
In a single module application, any of the terminals of each pair can be used.
Parallel System
Multiple batteries can be connected in parallel to expand the capacity and
power. When using multiple batteries in parallel, one will operate as a master
and the others as slaves. One of the Master pack P+ terminals should connect
to the PCS, and the other should connect to another battery for capacity
expansion. One of the P- terminals of the last Slave pack should connect to
PCS, and the other should connect to another battery for capacity expansion.
For the other Slave packs, each P terminal should be connected to another
battery’s terminal.
PLEASE NOTE
The connection to the protection devices should use the P+ terminal from the
Master pack and the P- terminal from the last Slave pack.
Communication Cable Connections
The Master battery can automatically identify the Slaves batteries connected in parallel using its internal software control. The communication terminals Port In and Port Out (RJ45 port) are integrated with the signal for automatic coding function.
PLEASE NOTE
All parallel power cables should be of the same length.
The following describes the connections of a system with four batteries packs, one Master, and three Slaves.
- The CAN communication port of the Master pack should connect to PCS;
- Port In from the Master pack should not be connected;
- The Port Out from the master PACK should connect the Port In of the first slave PACK using a parallel communication wire;
- The Port Out of the first Slave pack should connect to the Port In of the second Slave PACK;
- Following the same pattern, the Port Out of the second Slave pack should connect to the Port In of the third Slave PACK;
- The Port Out of the third and last slave PACK should not be connected
Busbar Connection
Applicable scenario:
- PCS with 200A charge/discharge current connect to SUN-BATT-5.32.
PLEASE NOTE
All parallel power cables should be of the same length: (L1 = L2 = L3 = L4 =
L5 = L6 = L7 = L8)
- You are advised to use the EV power cables with minimal size of 25 mm2 or 3AWG (600V, 125A) and length min.1500mm.
- The P+ and P- power line between the busbar and the PCS should be able to support 200A rated current, You are advised to use the EV power cable with size min. 50 mm2 or 0AWG (600V, 210A).
- Before assembling Power cable, label the cable polarities correctly to ensure correct cable connections and identification.
- The power cables installation and connection must be carried out by trained professionals.
MAINTENANCE
Recharge Requirements During Normal Storage
Battery should be stored in an environment with temperature range between -10°C ~ +45°C, and maintained regularly according to following table with 0.5C (25A) current till 40% SoC after long storage time.
Recharge conditions when battery is over discharged
Storage Environment Temper- ature| Storage Time|
Note
-10~25ºC| ≤15 days| Battery Pack disconnected from PCS
25~35ºC| ≤7 days
35~45ºC| <12 hours| Battery Pack connected to PCS
Recharge Requirements When Over Discharged
Over discharged (90% DoD) battery should be recharged according to following table, otherwise over discharged battery will be damaged.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>