DAIKIN EWYD-4ZXL Multipurpose Unit with Inverter Driven Single Screw Compressor Instruction Manual

June 17, 2024
Daikin

DAIKIN-logo

DAIKIN EWYD-4ZXL Multipurpose Unit with Inverter Driven Single Screw

Compressor

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-product

Product Information

Specifications:

  • Model: EWYD~4ZB
  • Compressor Type: Inverter Driven Single Screw Compressor
  • Application: Multipurpose unit
  • Revision: 09
  • Date: 01/2023

Product Usage Instructions

Introduction
Before operating the unit, please review the precautions against residual risks outlined in the manual. Familiarize yourself with the general description and instructions for receiving the unit.

Operating Limits
Understand the storing and operational limits for both Air to Water and Water to Water operations. Ensure compliance with specified guidelines.

Mechanical Installation
Follow safety guidelines during installation, including using safety devices, noise protection measures, and proper moving and lifting techniques. Position the unit correctly, ensuring minimum space requirements are met.

  1. Safety Devices
    Install and test safety devices to ensure the safe operation of the unit.

  2. Noise and Sound Protection
    Implement measures to reduce noise levels and protect against sound disturbances.

  3. Moving and Lifting
    Handle the unit with care during moving and lifting operations to prevent damage.

  4. Positioning and Assembly
    Properly position and assemble the unit according to the provided instructions.

  5. Minimum Space Requirements
    Allocate sufficient space around the unit as per the minimum space requirements for optimal performance.

  6. Water Piping
    Connect water piping following recommended guidelines to ensure proper functioning.

  7. Water Treatment
    Implement water treatment measures as necessary to maintain water quality within the system.

  8. Evaporator and Condenser Exchangers Anti-freeze Protection
    Protect evaporator and condenser exchangers from freezing by implementing appropriate anti-freeze protection measures.

  9. Installing the Flow Switch
    Properly install the flow switch as instructed to monitor and control water flow effectively.

FAQ (Frequently Asked Questions)

  • Q: How often should water treatment be performed?
    A: Water treatment should be performed regularly as per the manufacturer’s recommendations to maintain system efficiency.

  • Q: What should I do if the unit exceeds the specified operating limits?
    A: If the unit exceeds operating limits, immediately stop operation and consult a qualified technician for inspection and necessary adjustments.

REV 09
Date 01/2023
Supersedes D–EIMHP01201- 18_08EN

LEGEND

EQUIPMENTS & INSTRUMENTS

1| SCREW COMPRESSOR VFD
2| 4-WAY VALVE (4WV)
TZAH| MOTOR THERMISTOR (140°C)
PZAH| HIGH-PRESSURE SWITCH (21,5 bar)
PT| PRESSURE TRANSDUCER
TT| TEMPERATURE TRANSDUCER
4| FINS & TUBES HEAT EXCHANGER
5| LIQUID RECEIVER
6| DRIER FILTER
7| BRAZED PLATE HEAT EXCHANGER – ECONOMIZER (BPHE)
8| SHELL&TUBE HEAT EXCHANGER – COLD WATER
9| SHELL&TUBE HEAT EXCHANGER – HOT WATER
10| PRESSURE RELIEF VALVE (Psat=24.5 bar)

+ CHANGEOVER DEVICE (OPTIONAL)

11| PRESSURE RELIEF VALVE (Psat=15.5 bar)

+ CHANGEOVER DEVICE (OPTIONAL)

12| CHECK VALVE
13| COPPER FILTER
14| ANGLE VALVE
15| BALL VALVE
16| RUBBER BELOW (FOR XL-XR VERSION)
17| SIGHT GLASS
ELECTRONIC EXPANSION VALVES (EXV)

C| EXV SHELL&TUBE HEAT EXCHANGER – COLD WATER
H| EXV SHELL&TUBE HEAT EXCHANGER – HOT WATER
E| EXV ECONOMIZER
D| EXV DEFROST
SOLENOID VALVES (SV)
SVc| VFD COOLING SYSTEM
SV4| SUBCOOLER
SV6| OIL RECOVERY

Fig. 1 – Typical refrigerant circuit
The water inlet and outlet are indicative. Please refer to the machine dimensional diagrams for exact water connections.

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(1\)

Label Identification

1 – Manufacturer’s logo 5 – Cable tightening warning
2 – Gas type 6 – Non-flammable gas symbol
3 – Hazardous Voltage warning 7 – Unit nameplate data
4 – Electrical hazard symbol 8 – Lifting instruction

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(2\)

INTRODUCTION

This manual provides information on the standard functions and procedures of all units in the series and is an important supporting document for qualified personnel, but can never be replaced.

  • All units are delivered with wiring diagrams, certified drawings, nameplates; and DOC (Declaration Of Conformity); these documents show all technical data for the unit you have bought. In case of any discrepancies between the contents of the manual and the documentation provided with the unit, always rely on the unit because it is an integral part of this manual.
  • Read this manual carefully before installing and starting up the unit.
  • Improper installation could result in electric shock, short-circuits, leaks, fire or other damage to the equipment or injury to people.
  • The unit must be installed by professional operators/technicians in compliance with the laws in force in the country of installation.
  • The start-up of the unit must also be performed by authorized and trained personnel and all activities must be carried out in compliance, in full compliance with local laws and regulations.

INSTALLATION AND START-UP ARE FORBIDDEN IF ALL INSTRUCTIONS CONTAINED IN THIS MANUAL ARE NOT CLEAR.
If you are unsure about assistance and for more information, contact an authorized representative of the manufacturer.

Precautions against residual risks

  1. Install the unit according to the instructions set out in this manual.
  2. Regularly carry out all the maintenance operations foreseen in this manual.
  3. Wear protective equipment (gloves, eye protection, hard hat, etc.) suited to the work in hand; do not wear clothes or accessories that can get caught or sucked in by flows of air; tie back long hair before entering the unit.
  4. Before opening the machine panelling make sure that it is firmly hinged to the machine.
  5. The fins on heat exchangers and the edges of metal components and panels can cause cuts.
  6. Do not remove the guards from mobile components while the unit is operating.
  7. Make sure that mobile component guards are fitted correctly before restarting the unit.
  8. Fans, motors and belt drives might be running: before entering, always wait for these to stop and take appropriate measures to prevent them from starting up.
  9. The surfaces of the machine and pipes can get very hot or cold and cause the risk of scalding.
  10. Never exceed the maximum pressure limit (PS) of the water circuit of the unit.
  11. Before removing parts on the pressurised water circuits, close the section of the piping concerned and drain the fluid gradually to stabilise the pressure at the atmospheric level.
  12. Do not use your hands to check for possible refrigerant leaks.
  13. Disable the unit from the mains using the main switch before opening the control panel.
  14. Check that the unit has been grounded correctly before starting it.
  15. Install the machine in a suitable area; in particular, do not install it outdoors if it is intended for use indoors.
  16. Do not use cables with inadequate sections or extension cord connections, even for very short periods or emergencies.
  17. For units with power correction capacitors, wait 5 minutes after removing the electric power supply before accessing the inside of the switchboard.
  18. If the unit is equipped with centrifugal compressors with integrated inverter, disconnect it from the mains and wait a minimum of 20 minutes before accessing it to carry out maintenance: residual energy in the components, which takes at least this length of time to dissipate, poses the risk of electrocution.
  19. The unit contains pressurised refrigerant gas: the pressurised equipment must not be touched except during maintenance, which must be entrusted to qualified and authorised personnel.
  20. Connect up the utilities to the unit following the indications set out in this manual and on the panelling of the unit itself.
  21. To avoid an environmental risk, make sure that any leaking fluid is collected in suitable devices per local regulations.
  22. If a part needs to be dismantled, make sure it is correctly re-assembled before starting the unit.
  23. When the rules in force require the installation of fire-fighting systems near the machine, check that these are suitable for extinguishing fires on electrical equipment and on the lubricating oil of the compressor and the refrigerant, as specified on the safety data sheets of these fluids.
  24. When the unit is equipped with devices for venting overpressure (safety valves): when these valves are triggered, the refrigerant gas is released at a high temperature and speed; preventing the release of gas from harming people or objects and, if necessary, discharge the gas according to the provisions of EN 378-3 and the local regulations in force.
  25. Keep all the safety devices in good working order and check them periodically according to the regulations in force.
  26. Keep all lubricants in suitably marked containers.
  27. Do not store inflammable liquids near the unit.
  28. Solder or braze only empty pipes after removing all traces of lubricant oil; do not use flames or other heat sources in the vicinity of pipes containing refrigerant fluid.
  29. Do not use naked flames near the unit.
  30. The machinery must be installed in structures protected against atmospheric discharge according to the applicable laws and technical standards.
  31. Do not bend or hit pipes containing pressurised fluids.
  32. It is not permitted to walk or rest other objects on the machines.
  33. The user is responsible for the overall evaluation of the risk of fire in the place of installation (for example, calculation of the fire load).
  34. During transport, always secure the unit to the bed of the vehicle to prevent it from moving about and overturning.
  35. The machine must be transported according to the regulations in force taking into account the characteristics of the fluids in the machine and the description of these on the safety data sheet.
  36. Inappropriate transport can cause damage to the machine and even leaking of the refrigerant fluid. Before start-up, the machine must be checked for leaks and repaired accordingly.
  37. The accidental discharge of refrigerant in a closed area can cause a lack of oxygen and, therefore, the risk of asphyxiation: install the machinery in a well-ventilated environment according to EN 378-3 and the local regulations in force.
  38. The installation must comply with the requirements of EN 378-3 and the local regulations in force; in the case of installations indoors, good ventilation must be guaranteed and refrigerant detectors must be fitted when necessary.

General Description
The unit you bought is an “air to water multipurpose”, a machine aimed to provide cooled and heated water on two separate loops independently during all year. The unit is aimed to operate within the limits described in the following. The unit operation is based on vapour compression, condensation and evaporation according to the reverse Carnot cycle.

The main components are:

  • Inverter-driven Screw compressor to rise the refrigerant vapour pressure from evaporation pressure to condensation pressure.
  • Evaporator, where the low-pressure liquid refrigerant evaporates to cool the water.
  • Condenser, where the high-pressure vapour refrigerant condensates to heat the water.
  • Air heat exchanger, where the exceeding heating or cooling energy is exchanged in the atmosphere thanks to the fans.
  • Expansion valves allow to reduction of the pressure of condensed liquid from condensation pressure to evaporation pressure.

Receiving The Unit

  • The unit must be inspected for any possible damage immediately upon reaching the final place of installation. All components described in the delivery note must be inspected and checked.
  • Should the unit be damaged, do not remove the damaged material and immediately report the damage to the transportation company and request they inspect the unit.
  • Immediately report the damage to the manufacturer representative, a set of photographs helps recognize responsibility.
  • Damage must not be repaired before the inspection of the transportation company representative.
  • Before installing the unit, check that the model and power supply voltage shown on the nameplate are correct. Responsibility for any damage after acceptance of the unit cannot be attributed to the manufacturer.

OPERATING LIMITS

Storing Storage

Environmental conditions must be within the following limits:

  • Minimum ambient temperature: -20°C
  • Maximum ambient temperature: 57°C
  • Maximum R.H.: 95% non-condensing

Storing below the minimum temperature may cause damage to components. Storing above the maximum temperature causes the opening of safety valves. Storing in a condensing atmosphere may damage electronic components. As a general rule, the unit should be operated with an evaporator water flow rate between 50% and 120% of the nominal flow rate (at standard operating conditions), however, check with the unit selection software the correct minimum and maximum allowed values for the specific model.

STORAGE AND OPERATION OUT OF THE LIMITS BELOW MAY DAMAGE THE UNIT. In case of doubts contact manufacturer representative

Operating limits Air to Water operation

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(3\)

The following options must be included according to the specific operating area:

  • Ref. area 1: standard unit – (no options are required to operate in this area)
  • Ref. area 2: standard unit – opt. 08 (Brine) (unit may not unload to minimum load)
  • Ref. area 3: standard unit – opt. 142 (High Ambient kit)

Note:

  • The above graph refers to the unit operating at full load. The unit may be able to operate outside the above envelope with compressors unloading. Please contact the factory for further details.
  • For operation with a temperature at the outlet of the cold heat exchanger below +4°C, the unit must operate with a glycol mixture (ethylene or propylene glycol). The glycol percentage must be provided according to the minimum ELWT needed.
  • The above graphic represents a guideline about the operating limits of the range. Please refer to the latest Chiller Selection Software (CSS) for real operating limits working conditions for each size.
  • Opt. 142 provides EC motor fans. The performances will differ from the standards.

Operating limits Water to Water operation (Recovery Mode)

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(4\)

The following options must be included according to the specific operating area:

  • Ref. area 1: standard unit (no options are required to operate in this area)
  • Ref. area 2: standard unit – opt. 08 (Brine) (unit may not unload to minimum load)

Note:

  • The above graph refers to the unit operating at full load. The unit may be able to operate outside the above envelope with compressors unloading. Please contact the factory for further details.
  • For operation with a temperature at the outlet of the cold heat exchanger below +4°C, the unit must operate with a glycol mixture (ethylene or propylene glycol). The glycol percentage must be provided according to the minimum ELWT needed.
  • The above graphic represents a guideline about the operating limits of the range. Please refer to the latest Chiller Selection Software (CSS) for real operating limits working conditions for each size.

MECHANICAL INSTALLATION

Safety
The unit must be firmly secured to the soil.

It is essential to observe the following instructions:

  • The unit can only be lifted using the lifting points marked in yellow fixed to its base.
  • It is forbidden to access the electrical components without having opened the unit main switch and switched off the power supply.
  • It is forbidden to access the electrical components without using an insulating platform. Do not access the electrical components if water and/or moisture are present.
  • Sharp edges and the surface of the condenser section could cause injury. Avoid direct contact and use adequate protection devices.
  • Switch off the power supply, by opening the main switch, before servicing the cooling fans and/or compressors. Failure to observe this rule could result in serious personal injury.
  • Do not introduce solid objects into the water pipes while the unit is connected to the system.
  • A mechanical filter must be installed on the water pipe connected to the heat exchanger inlet.
  • The unit is supplied with safety valves, that are installed both on the high-pressure and low-pressure sides of the refrigerant circuit.

It is forbidden to remove all protections of moving parts. In case of a sudden stop of the unit, follow the instructions on the Control Panel Operating Manual which is part of the on-board documentation delivered to the end user.

It is strongly recommended to perform installation and maintenance with other people. In case of accidental injury or unease, it is necessary to:

  • keep calm
  • Press the alarm button if present at the installation site
  • contact immediately emergency rescue personnel of the building or the Health Emergency Service
  • wait without leaving the injured person alone until the rescue operators come
  • give all necessary information to the rescue operators

Avoid installing the unit in areas that could be dangerous during maintenance operations, such as platforms without parapets or railings or areas not complying with the clearance requirements around the unit.

DAE units can be installed without charge restrictions in machinery rooms or in open air (location class. III). According to EN 378-1, a mechanical vent on the secondary circuit(s) has to be installed: to ensure location classification III the system shall be classified as an “indirect vented closed system”.

Key

  1. Occupied Space
  2. Refrigerant containing part(s)

Machinery rooms shall not be considered occupied space (except as defined in part 3, 5.1: machinery rooms used as a maintenance workspace shall be considered occupied spaces under access category c). Each exchanger (evaporator and condenser) is provided with a safety valve installed on a changeover valve that allows maintenance and periodic checks, without losing a significant amount of refrigerant. Do not leave the safety valve in the intermediate position. To prevent damages due to inhalation and direct contact with refrigerant gas, the safety valve outlets must be connected to a conveyor pipe before operations. These pipes must be installed so that, in case the valve opens, the discharged refrigerant flow does not affect people and/or things, or can enter the building through windows and/or other openings.

The installer is responsible for connecting the safety valve to the purge pipe and pipe dimensioning. In this regard, refer to the harmonized standard EN13136 to dimension the drain pipes to be connected to the safety valves.

All precautions concerning the handling of refrigerant must be observed by local regulations.

Safety devices
By the Pressure Equipment Directive, the following protection devices are used:

  • High-pressure switch → safety accessory.
  • External relief valve (refrigerant side) → overpressure protection.
  • External relief valve (heat transfer fluid side) → The selection of these relief valves must be made by the personnel responsible for completing the hydraulic circuit(s).

All factory-installed relief valves are lead-sealed to prevent any calibration change. If the relief valves are installed on a changeover valve, this is equipped with a relief valve on both outlets. Only one of the two relief valves is operating, the other one is isolated. Never leave the changeover valve in the intermediate position. If a relief valve is removed for checking or replacement please ensure that there is always an active relief valve on each of the changeover valves installed in the unit.

Noise and sound protection

  • The unit is a source of noise mainly due to the rotation of compressors and fans.
  • The noise level for each model size is listed in sales documentation.
  • If the unit is correctly installed, operated and maintained the noise emission level does not require any special protection device to operate continuously close to the unit without any risk.
  • In cases where the installation is subject to compliance with special sound requirements, it may be necessary to use additional noise attenuation devices, it is necessary to isolate the unit from its base with extreme care, correctly applying the anti-vibration elements (supplied as optional). Flexible joints must be installed on the water connections, as well.

Moving and lifting

  • Avoid bumping and/or jolting during loading/unloading the unit from the truck and moving it. Do not push or pull the unit from any part other than the base frame. Secure the unit inside the truck to prevent it from moving and causing damage. Do not allow any part of the unit to fall during transportation or loading/unloading.
  • All units of the series are supplied with lifting points marked in yellow. Only these points may be used for lifting the unit, as shown in the following figure.
  • Use spacing bars to prevent damage to the condensation bank. Position these above the fan grills at a distance of at least 2.5 metres.
  • The equipment, ropes, lifting accessories and handling procedures must comply with local regulations and current regulations.
  • Use only lifting hooks with a locking device. The hooks must be securely fixed before handling.
  • The lifting ropes, hooks and spacing bars must be strong enough to support the unit safely. Please check the unit weight on the unit nameplate.
  • The installer has the responsibility to ensure the selection and correct use of the lifting equipment. However, it is advisable to use ropes with a minimum vertical capacity equal to the total weight of the machine.
  • The machine must be lifted with the utmost attention and care following lifting label instructions; lift the unit very slowly, keeping it perfectly level.

Positioning and assembly

  • All units are designed for installation outdoors, either on balconies or on the ground, provided that the installation area is free of obstacles that could reduce airflow to the condenser coil.
  • The unit must be installed on a robust and perfectly level foundation; should the unit be installed on balconies or roofs, it might be necessary to use weight distribution beams.

Fig. 3 – Lifting

Unit with 4 lifting points
(The drawing shows only the 6 fans’ version. For the 4 fans version the lifting mode is the same)

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(6\)

(The drawing shows only the 12 fans’ version. The lifting mode is the same for the different number of fans)

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(7\)

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(8\)

  • For installation on the ground, a strong concrete base, at least 250 mm thickness and wider than the unit must be provided. This base must be able to support the weight of the unit.
  • The unit must be installed above antivibrating mounts (AVM), rubber or spring types. The unit frame must be perfectly levelled above the AVM.
  • Installation such as in the figure above must always be avoided. In case the AVMs are not adjustable the flatness of the unit frame must be guaranteed by using metal plate spacers.
  • Before unit commissioning, the flatness must be verified by using a laser levelling device or other similar devices. The flatness shall not be over 5 mm for units within 7 m in length and 10 mm for units over 7 m.
  • If the unit is installed in places that are easily accessible to people and animals, it is advisable to install protection grids for the condenser and compressor sections.

To ensure best performance on the installation site, the following precautions and instructions must be followed:

  • Avoid air flow recirculation.
  • Make sure that there are no obstacles to hamper airflow.
  • Make sure to provide a solid foundation to reduce noise and vibrations.
  • Avoid installation in particularly dusty environments, to reduce the soiling of condenser coils.

The water in the system must be particularly clean and all traces of oil and rust must be removed. A mechanical water filter must be installed on the unit’s inlet piping.

Minimum space requirements

  • It is fundamental to respect minimum distances on all units to ensure optimum ventilation to the condenser. Limited installation space could reduce the normal airflow, thus significantly reducing the machine’s performance and considerably increasing the consumption of electrical energy.
  • When deciding where to position the machine and to ensure proper airflow, the following factors must be taken into consideration: avoid any warm air recirculation and insufficient air supply to the air-cooled condenser.
  • Both these conditions can cause an increase in condensing pressure, which leads to a reduction in energy efficiency and refrigerating capacity. Thanks to the geometry of their air-cooled condensers, the units are less affected by poor air circulation conditions.
  • Also, the software has particularly the ability to compute the machine’s operating conditions to optimise the load under abnormal operating circumstances.
  • Every side of the machine must be accessible for post-installation maintenance operations. Figure 4 shows the minimum space required.
  • Vertical air discharge must not be obstructed as this would significantly reduce capacity and efficiency.
  • If the machine is surrounded by walls or obstacles of the same height as the machine, it must be installed at a distance of at least 2500 mm. If these obstacles are higher, the machine must be installed at a distance of at least 3000 mm.
  • Should the machine be installed without observing the recommended minimum distances from walls and/or vertical obstacles, there could be a combination of warm air recirculation and/or insufficient supply to the air-cooled condenser which could cause a reduction of capacity and efficiency.
  • In any case, the microprocessor will allow the machine to adapt itself to new operating conditions and deliver the maximum capacity available under any given circumstances, even if the lateral distance is lower than recommended.
  • When two or more machines are positioned side by side, a distance of at least 3600 mm between the respective condenser banks is recommended.
  • For further solutions, please consult Daikin technicians.

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(10\)

The minimum distances, reported above, ensure the functionality of the unit in most applications. However, there are specific situations that include multiple unit installations: in this case, the following recommendations have to be followed:

Multiple units are installed side by side in a free field with the dominant wind.
Considering an installation in areas with a dominant wind from a specific direction (as shown in Fig.6):

  • Unit N°1: is performing normally without any ambient over-temperature.
  • Unit N° 2: is working in a warmed ambient. The first circuit (from the left) works with air recirculating from Unit 1 and the second circuit to the recirculating air from Unit N°1 and recirculation from itself.
  • Unit N° 3: The circuit on the left is working in an over-temperature ambient due to the recirculating air from the other two units, the circuit on the right is working quite normally.

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(11\)

In order to avoid the hot air recirculation due to dominant winds, the installation where all units are aligned to the dominant wind is preferred (see figure below):

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(12\)

Multiple units are installed side by side in a compound.
In the case of compounds with walls of the same height as the units or higher, the installation is not recommended. Unit 2 and unit 3 work with sensible higher temperatures due to the enhanced recirculation. In this case, special precautions must be taken into account according to the specific installation (eg: louvred walls, installing the unit on the base frame to increase the height, ducts on the discharge of the fans, high lift fans, etc).

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(13\)

All the above cases are even more sensitive in case of design conditions close to the limits of the unit operating envelope.

NOTE:
Daikin cannot be considered responsible in case of malfunctions generated by hot air recirculation or insufficient airflow as a result of improper installation if the above recommendations are ignored.

Water piping
Piping must be designed with the lowest number of elbows and the lowest number of vertical changes of direction. In this way, installation costs are reduced considerably and system performance is improved.

The water system must have:

  • Anti-vibration mountings to reduce transmission of vibrations to the structures.
  • Isolating valves to isolate the unit from the water system during maintenance.
  • The flow switch, to protect the unit must be protected against freezing by continuous monitoring of the water flow in the evaporator. In most cases, on-site the flow switch is set to produce an alarm only when the water pump switches OFF and the water flow falls to zero. it is recommended to adjust the flow switch to produce a “Water Loss Alarm” when the water flow reaches 50% of the nominal value, in this case, the evaporator is protected against freezing and the flow switch can detect the water filter clogging.
  • Manual or automatic air venting device at the system’s highest point; drain device at the system’s lowest point.
  • Neither the evaporator nor the heat recovery device must be positioned at the system’s highest point.
  • A suitable device that can maintain the water system under pressure (expansion tank, etc.).
  • Water temperature and pressure indicators to assist the operator during service and maintenance.
  • A filter or device that can remove particles from the fluid. The use of a filter extends the life of the evaporator and pump and helps to keep the water system in a better condition. The water filter must be installed as close as possible to the unit, as in Fig. 7. If the water filter is installed in another part of the water system, the Installer has to guarantee the cleaning of the water pipes between the water filter and the evaporator.
  • Recommended maximum opening for strainer mesh is:
    • 0,87 mm (DX S&T)
    • 1,0 mm (BPHE)
    • 1,2 mm (Flooded)
  • The evaporator and condenser have an electrical resistance with a thermostat that ensures protection against water freezing at ambient temperatures as low as –16°C.
  • All the other water piping/devices outside the unit must therefore be protected against freezing.
  • The heat recovery device must be emptied of water during the winter season unless an ethylene glycol mixture in an appropriate percentage is added to the water circuit.
  • In case of unit substitution, the entire water system must be emptied and cleaned before the new unit is installed. Regular tests and proper chemical treatment of water are recommended before starting up the new unit.
  • If glycol is added to the water system as anti-freeze protection, pay attention to the fact that suction pressure will be lower, the unit’s performance will be lower and water pressure drops will be greater. All unit-protection systems, such as anti-freeze, and low-pressure protection will need to be readjusted.

Before insulating water piping, check that there are no leaks.

Water treatment
Before putting the unit into operation, clean the water circuit. The evaporator and the condenser must not be exposed to flushing velocities or debris released during flushing. It is recommended that a suitably sized bypass and valve arrangement is installed to allow flushing of the piping system. The bypass can be used during maintenance to isolate the heat exchanger without disrupting flow to other units.

Any damage due to the presence of foreign bodies or debris in the shell and tube heat exchangers will not be covered by warranty.
Dirt, scales, corrosion debris and other materials can accumulate inside the heat exchanger and reduce its heat exchanging capacity. Pressure drop can increase as well, thus reducing water flow. Proper water treatment therefore reduces the risk of corrosion, erosion, scaling, etc.. The most appropriate water treatment must be determined locally, according to the type of system and water characteristics. The manufacturer is not responsible for damage to or malfunctioning of equipment caused by failure to treat water or by improperly treated water.

Table 1- Water quality requirements

DAE Water quality requirements Shell &tube + Flooded BPHE
Ph (25 °C) 6.8 ÷ 8.4 7.5 – 9.0
Electrical conductivity [μS/cm] (25°C) < 800 < 500
Chloride ion [mg Cl- / l] < 150 < 70 (HP1);

< 300 (CO2)

Sulphate ion [mg SO42- / l]| < 100| < 100
Alkalinity [mg CaCO3 / l]| < 100| < 200
Total Hardness [mg CaCO3 / l]| < 200| 75 ÷ 150
Iron [mg Fe / l]| < 1| < 0.2
Ammonium ion [mg NH4+ / l]| < 1| < 0.5
Silica [mg SiO2 / l]| < 50| –
Chlorine molecular (mg Cl2/l)| < 5| < 0.5
Note:

1. Heat Pump
2. Cooling Only

Evaporator and condenser exchangers anti-freeze protection

  • The evaporator and condenser are supplied with a thermostatically controlled anti-freeze electrical resistance, which provides adequate anti-freeze protection at temperatures as low as –16°C.
  • However, unless the heat exchangers are empty and cleaned with an anti-freeze solution, additional methods must also be used against freezing.

Two or more of the below protection methods shall be considered when designing the system as a whole:

  • Continuous water flow circulation inside piping and exchangers
  • Addition of an appropriate amount of glycol inside the water circuit
  • Additional heat insulation and heating of exposed piping
  • Emptying and cleaning the heat exchanger during the winter season

It is the responsibility of the installer and/or local maintenance personnel to ensure that described anti-freeze methods are used. Make sure that appropriate anti-freeze protection is maintained at all times. Failing to follow the instructions above could result in unit damage. Damage caused by freezing is not covered by the warranty.

Installing the flow switch

  • To ensure sufficient water flow through the evaporator and condenser, a flow switch must be installed on both water circuits. The flow switch can be installed either on the inlet or outlet water piping. The purpose of the flow switch is to stop the unit in the event of interrupted water flow, thus protecting the evaporator and the condenser.
  • The manufacturer offers, as optional, a flow switch that has been selected for this purpose.
  • This paddle-type flow switch is suitable for heavy-duty outdoor applications (IP67) and pipe diameters in the range of 1” to 8”.
  • The flow switch is provided with a clean contact which must be electrically connected to terminals shown in the wiring diagram. The flow switch has to be tuned to intervene when the evaporator and/or condenser water flow is lower than 50% of the nominal flow rate.
  • For a proper unit operation, the water flow rate of both heat exchangers (evaporator and condenser) must always recirculate when the unit switch is active (On).
a Single pump
b Twin pump
c Drain ½ ‘’ NPT
d Automatic filling valve
e Plugged fitting¼’’ NPT
f Safety valve 10 BAR 1/2 ‘’ G
g Electrical heater ¾’’ G 100 W 230 V
j Water filter
TT Temperature sensor
--- ---
TS Temperature switch
PI Pressure gauge
FS Flow switch

Minimum system water volume (for Cold and Hot side)
All cold and hot water systems need adequate time to react to a load change. In the case of a multipurpose unit, the machine follows the set point on the cold side as well as the set point on the hot side. The control of the heating and cooling capacity of the unit is achieved by managing the load of the compressors (with VFD) and by cycling each circuit independently between the following operating modes: cooling only, cooling + heating, and heating only. The potential for short cycling usually exists when the cooling and heating loads fall below the minimum unit’s capacity or in systems with insufficient water volumes.

  • Design considerations for system water volume are the minimum cooling and heating load; the minimum cooling and heating unit’s capacity; and the time for each circuit to perform the switch of operating mode; on the heating side also the defrost effects need to be considered.
  • The water content is necessary to ensure the stability of plant operation and accurate temperature control. To determine the right value all the components of the systems should be considered as well as the plant layout and control strategy in place.
  • Assuming that there are no sudden load changes and that the chiller plant has reasonable turndown, a rule of thumb of “6,5 litres per kW” is considered for comfort cooling and comfort heating applications. The water content is calculated based on the “6.5 lt/kW” rule and is intended as the useful water volume always flowing through both cold and hot heat exchangers.
  • Note that in the presence of any bypass that causes a short circuit of the supply water with the return the resulting useful volume will be lower and lead to system instability.
  • For process cooling and/or heating applications, the request is typically for very high accuracy and stability of the supplied water temperatures. In all those cases the minimum water content to be considered should be increased from the “6.5 lt/kW”. In that situation, a deeper analysis must be carried out by the system designer with full awareness of the whole system’s characteristics and the final user’s expectations.
  • To comply with the minimum water volume could be necessary to add a buffer water tank to the circuit. The solution is to use a “two-attack” buffer tank installed on the return from the system to the unit.

Electric connections
Provide an electrical circuit to connect the unit. It must be connected to the copper cables with an adequate section relative to the plate absorption values and according to the current electrical standards. Daikin Applied Europe S.p.A. declines all responsibility for an inadequate electrical connection.

The connections to the terminals must be made with copper terminals and cables, otherwise overheating or corrosion may occur at the connection points with the risk of damaging the unit. The electrical connection must be carried out by qualified personnel, in compliance with the laws in force. There is a risk of electric shock.

The power supply to the unit must be set up in such a way that it can be switched on or off independently from that of other system components and other equipment in general, through a general switch. The electrical connection of the panel must be carried out maintaining the correct sequence of the phases. Refer to the specific wiring diagram for the unit you have bought. Should the wiring diagram not be on the unit or should it have been lost, please contact your manufacturer representative, who will send you a copy. In case of a discrepancy between the wiring diagram and the electrical panel/cables, please contact the manufacturer’s representative.

Do not apply torque, tension or weight to the main switch terminals. Power line cables must be supported by appropriate systems.

To avoid interference, all control wires must be connected separately from the power cables. To do this, use several electrical passage ducts. Simultaneous single and three-phase loads and phase unbalance can cause ground losses of up to 150 mA during normal unit operation. If the unit includes devices that generate higher harmonics, such as an inverter or phase cut, ground losses can increase to much higher values, about 2 A. The protections for the power supply system must be designed according to the values mentioned above. A fuse must be present on each phase and, where provided for by the national laws of the country of installation, a leak detector to earth. This product complies with EMC (Electromagnetic Compatibility) standards for industrial environments. Therefore it is not intended for use in residential areas, e.g. installations where the product is connected to a low-voltage public distribution system. Should this product need to be connected to a low-voltage public distribution system, specific additional measures will have to be taken to avoid interference with other sensitive equipment.

Before any electrical connection works to the compressor motor and/or the fans, make sure that the system is switched off and the main switch of the unit is open. Failure to observe this rule could result in serious personal injury.

Cable requirements

  • The cables connected to the circuit breaker must respect the insulation distance in the air and the surface isolation distance between the active conductors and the earth, according to IEC 61439-1 Table 1 and 2, and to the local and national laws. The cables connected to the main switch must be tightened using a pair of keys and respecting the unified clamping values, relative to the quality of the screws of the washers and nuts used.
  • Connect the earth conductor (yellow/green) to the PE ground terminal.
  • The equipotential protection conductor (earth conductor) must have a section according to Table 1 of EN 60204-1 Point 5.2, shown below.
  • In any case, the equipotential protection conductor (earth conductor) must have a cross-section of at least 10 mm2, by point 8.2.8 of the same standard.

Table 1 – Table 1 of EN60204-1 Point 5.2

Section of the copper phase conductors feeding the equipment

S [mm2]

| Minimum cross-section of the external copper protection conductor

Sp [mm2]

---|---
S ≤ 16

16 < S ≤ 35

S > 35

| S

16

S/2

Phase unbalance
In a three-phase system, the excessive imbalance between the phases is the cause of the engine overheating. The maximum permitted voltage unbalance is 3%, calculated as follows:

Where:

  • Vx = phase with greater unbalance
  • Vm = average of the tensions

Example: the three phases measure 383, 386 and 392 V respectively. The average is:

The unbalance percentage is:

less than the maximum allowed (3%).

OPERATION

Operator’s responsibilities

  • It is essential that the operator is appropriately trained and becomes familiar with the system before operating the unit. In addition to reading this manual, the operator must study the microprocessor operating manual and the wiring diagram to understand the start-up sequence, operation, shutdown sequence and operation of all the safety devices.
  • During the unit’s initial start-up phase, a technician authorized by the manufacturer is available to answer any questions and give instructions as to the correct operating procedures.
  • The operator must keep a record of operating data for every installed unit. Another record should also be kept of all the periodical maintenance and servicing activities.
  • If the operator notes abnormal or unusual operating conditions, he is advised to consult the technical service authorized by the manufacturer.

MAINTENANCE

Routine maintenance

  • This unit must be maintained by qualified technicians. Before beginning any work on the system the personnel shall assure that all security precautions have been taken.
  • Neglecting unit maintenance in these environments could degrade all parts of the units (coils, compressors, frames, pipes, etc..) with negative effects on performance and functionality.
  • There are two different levels of maintenance, which can be chosen according to the type of application (critical/non-critical) or the installation environment (highly aggressive).
  • Examples of critical applications are process cooling, data centres, etc.

Highly Aggressive Environments can be defined as the follows:

  • Industrial environment (with a possible concentration of fumes resulting from combustion and chemical process);
  • Coastal environment;
  • Highly polluted urban environment;
  • Rural environment close to animal excrement and fertilizers, and high concentration of exhaust gas from diesel generators;
  • Desert areas with risk of sandstorms;
  • Combinations of the above.
    • Table 2 lists all Maintenance activities for standard applications and standard environments.
    • Table 3 lists all Maintenance activities for critical applications or highly aggressive environments.
    • The below instructions are mandatory for cases listed above, but also advised for units installed in standard environments.

Table 2 – Standard Routine Maintenance Plan


List of Activities

| ****

Weekly

| Monthly

(Note 1)

| Yearly/ Seasonal

(Note 2)

---|---|---|---
General:|  |  |
Reading of operating data (Note 3)| X|  |
Visual inspection of the unit for any damage and/or loosening|  | X|
Verification of thermal insulation integrity|  |  | X
Clean and paint where necessary|  |  | X
Analysis of water (6)|  |  | X
Check of flow switch operation|  | X|
Electrical:|  |  |
Verification of control sequence|  |  | X
Verify contactor wear – Replace if necessary|  |  | X
Verify that all electrical terminals are tight – Tighten if necessary|  |  | X
Clean inside the electrical control board|  |  | X
Visual inspection of components for any signs of overheating|  | X|
Verify operation of compressor and oil heater|  | X|
Measure compressor motor insulation using the Megger|  |  | X
Clean air intake filters of the electrical panel|  | X|
Verify the operation of all ventilation fans in the electrical panel|  |  | X
Verify the operation of the inverter cooling valve and heater|  |  | X
Verify the status of capacitors in the inverter (signs of damage, leaks, etc)| |  | X
List of Activities| Weekly| Monthly
(Note 1)| Yearly/ Seasonal
(Note 2)
Refrigeration circuit:|  |  |
Check for any refrigerant leakage|  | X|
Verify refrigerant flow using the liquid sight glass – Sight glass full| X|  |
Verify filter dryer pressure drop|  | X|
Verify oil filter pressure drop (Note 5)|  | X|
Analyse compressor vibrations|  |  | X
Analyse compressor oil acidity (7)|  |  | X
Condenser section:|  |  |
Clean water rinse condenser banks (Note 4)|  |  | X
Verify that fans are well-tightened|  |  | X
Verify condenser bank fins – Comb if necessary|  |  | X

Notes:

  1. Monthly activities include all the weekly ones.
  2. The annual (or early season) activities include all weekly and monthly activities.
  3. Unit operating values should be read daily thus keeping high observation standards.
  4. In environments with a high concentration of airborne particles, it might be necessary to clean the condenser bank more often.
  5. Replace the oil filter when the pressure drop across it reaches 2.0 bar.
  6. Check for any dissolved metals.
  7. TAN (Total Acid Number): ≤0,10: No action
    • Between 0.10 and 0.19: Replace anti-acid filters and re-check after 1000 running hours. Continue to replace filters until the TAN is lower than 0.10.
    • 0,19: Replace oil, oil filter and filter dryer. Verify at regular intervals.
      Table 3 –Routine Maintenance Plan for Critical Application and/or Highly Aggressive Environment** List of Activities (Note 8)| Weekly| Monthly
      (Note 1)| Yearly/ Seasonal (Note 2)
      ---|---|---|---
      General:|  |  |
      Reading of operating data (Note 3)| X|  |
      Visual inspection of the unit for any damage and/or loosening|  | X|
      Verification of thermal insulation integrity|  |  | X
      Clean|  | X|
      Paint where necessary|  |  | X
      Clean and paint where necessary|  |  | X
      Analysis of water (6)|  |  | X
      Check of flow switch operation|  | X|
      Electrical:|  |  |
      Verification of control sequence|  |  | X
      Verify contactor wear – Replace if necessary|  |  | X
      Verify that all electrical terminals are tight – Tighten if necessary|  |  | X
      Clean inside the electrical control board|  | X|
      Visual inspection of components for any signs of overheating|  | X|
      Verify operation of compressor and oil heater|  | X|
      Measure compressor motor insulation using the Megger|  |  | X
      Clean air intake filters of the electrical panel|  | X|
      Verify the operation of all ventilation fans in the electrical panel|  |  | X
      Verify the operation of the inverter cooling valve and heater|  |  | X
      Verify the status of capacitors in the inverter (signs of damage, leaks, etc)| |  | X
      Refrigeration circuit:|  |  |
      Check for any refrigerant leakage|  | X|
      Verify refrigerant flow using the liquid sight glass – Sight glass full| X|  |
      Verify filter dryer pressure drop|  | X|
      Verify oil filter pressure drop (Note 5)|  | X|
      Analyse compressor vibrations|  |  | X
      Analyse compressor oil acidity (7)|  |  | X
      Condenser section:**|  |  |
      Clean water rinse condenser coils (Note 4)|  | X|
      Quarterly clean condenser coils (E-coated only)|  |  | X
      Verify that fans are well-tightened|  |  | X
      Verify condenser coil fins – Comb if necessary|  | X|
      Check the aspect of the plastic protection of the copper/aluminium connection| | X|

Notes:

  1. Units placed or stored in a Highly Aggressive Environment for a long time without operation are still subject to those routine maintenance steps.

Unit Maintenance and Cleaning

  • Units exposed to a highly aggressive environment can face corrosion in a shorter time than ones installed in a standard environment. Corrosion causes a rapid rusting of the frame core, consequently decreasing the unit structure lifetime. To avoid that, it is necessary to wash periodically the frame surfaces with water and suitable detergents.
  • In case part of the unit, frame paint comes off, it is important to stop its progressive deterioration by repainting the exposed parts using the proper products. Please contact the factory to get the required product specifications.
  • Note: in case of just salt deposits are present, it is enough to rinse the parts with fresh water.

Shut-off valves must be turned at least once a year to preserve their function.

Refrigerant charge verification
The multipurpose units are designed to operate in extremely variable conditions and modes (air to water and water to water). The refrigerant charge indicated on the name plate has been approved by the manufacturer allowing the unit to operate within the declared operating envelope. The high variable conditions lead to situations where the sight glass on the liquid line shows flashing of the refrigerant. Generally, this phenomenon leads the field operator to charge refrigerant in the unit. On a multi-purpose unit doesn’t add or remove refrigerant based only on the indication of the flashing in the sight glass. The refrigerant charge must be adjusted in water-to-water operation (Recovery mode) to avoid flashing at sight glass on the liquid line.

Inverter Electrolytic Capacitors
Compressor Inverters include electrolytic capacitors which have been designed to last a minimum of 15 years in normal use. Heavy-duty conditions may reduce the actual life of capacitors. The unit calculates capacitor residual life based on actual operation. When residual life gets below a given threshold, a warning is issued by the controller. In this case, the replacement of capacitors is recommended. This operation must be done only by qualified technicians. Replacement must be carried out through the following procedure:

  • Power off the unit.
  • Wait for 5 minutes before opening the inverter case.
  • Check that the residual DC voltage in the DC link is zero.
  • Open the inverter case and replace old capacitors with new ones.
  • Reset the unit controller through the maintenance menu. This will allow the controller to recalculate the new estimated life of the capacitors.

Capacitor Reforming after long shut-off period
Electrolytic capacitors may lose part of their original characteristics if they are not powered for more than 1 year. If the unit has been shut off for a longer period a “reforming” procedure as follows is necessary:

  • Power on the inverter
  • Keep it powered on without starting the compressor for at least 30 minutes
  • After 30 minutes the compressor can be started

Low Ambient Start-up
Inverters include a temperature control which allows them to withstand ambient temperatures down to -20°C. However, they should not be switched on at temperatures lower than 0°C unless the following procedure is executed:

  • Open the switch box (only trained technicians should perform this operation)
  • Open compressor fuses (by pulling the fuse holders) or compressor circuit breakers
  • Power on the unit
  • Keep the unit powered on for 1 hour at least (this allows inverter heaters to warm up the inverter)
  • Close fuse holders
  • Close the switch box

SERVICE AND LIMITED WARRANTY

  • All units are factory-tested and guaranteed for 12 months as of the first start-up or 18 months as of delivery.
  • These units have been developed and constructed according to high quality standards ensuring years of failure-free operation. It is important, however, to ensure proper and periodical maintenance under all the procedures listed in this manual and with good practice of machine maintenance.
  • We strongly advise stipulating a maintenance contract with a service authorized by the manufacturer to ensure efficient and problem-free service, thanks to the expertise and experience of our personnel.
  • It must also be taken into consideration that the unit requires maintenance during the warranty period.
  • It must be borne in mind that inappropriately operating the unit, beyond its operating limits or not performing proper maintenance according to this manual can void the warranty.

Observe the following points, in particular, to conform to warranty limits:

  1. The unit cannot function beyond the specified limits.
  2. The electrical power supply must be within the voltage limits and without voltage harmonics or sudden changes.
  3. The three-phase power supply must not have an unbalance between phases exceeding 3%. The unit must stay turned off until the electrical problem has been solved.
  4. No safety device, either mechanical, electrical or electronic must be disabled or overridden.
  5. The water used for filling the water circuit must be clean and suitably treated. A mechanical filter must be installed at the point closest to the evaporator inlet.
  6. Unless there is a specific agreement at the time of ordering, the evaporator water flow rate must never be above 120%and below 50% of the nominal flow rate.

PERIODIC OBLIGATORY CHECKS OF APPLIANCES UNDER PRESSURE

The units are included in category I → IV of the classification established by the European Directive 2014/68/EU (PED). For units belonging to this category, some local regulations require a periodic inspection by an authorized agency. Please check with your local requirements.

DURATION

  • The useful life of this unit is 10 (ten) years.
  • After this period the manufacturer advises to carry out total control of the whole and above all the integrity check of the pressurized refrigeration circuits, as required by the laws in force in some European Community countries.

DISPOSAL

  • The unit is made of metal, plastic and electronic parts. All of these components must be disposed of by local disposal laws and if in scope with the national laws implementing the Directive 2012/19/EU (RAEE).
  • Lead batteries must be collected and sent to specific waste collection centres.
  • Avoid the escape of refrigerant gases into the environment by using suitable pressure vessels and tools for transferring the fluids under pressure. This operation must be carried out by competent personnel in refrigeration systems and in compliance with the laws in force in the country of installation.

IMPORTANT INFORMATION REGARDING THE REFRIGERANT USED

This product contains fluorinated greenhouse gases. Do not vent gases into the atmosphere.

  • Refrigerant type: R134a*
  • GWP(1) value: 1430
  • (1)GWP = global warming potential

special version can be charged with R513a (GWP=631).

Factory And Field Charged Units Instructions
The refrigerant system will be charged with fluorinated greenhouse gases, and the factory charge(s) are recorded on the label, shown below, which is adhered inside the electrical panel. Periodic inspections for refrigerant leaks may be required depending on European or local legislation. Please contact your local dealer for more information. Do not vent gases into the atmosphere.

  • Fill in with indelible ink the refrigerant charge label supplied with the product as following instructions:
    • any refrigerant charge for each circuit (1; 2; 3) added during commissioning
    • the total refrigerant charge (1 + 2 + 3)
    • calculate the greenhouse gas emission with the following formula:
      GWP value of the refrigerant x Total refrigerant charge (in kg)/1000

DAIKIN-EWYD-4ZXL-Multipurpose-Unit-with-Inverter-Driven-Single-Screw-
Compressor-fig- \(19\)

  • a. Contains fluorinated greenhouse gases
  • b. Circuit number
  • c. Factory charged
  • d. Field charge
  • e. Refrigerant charge for each circuit (according to the number of circuits)
  • f. Total refrigerant charge
  • g. Total refrigerant charge (Factory + Field)
  • h. Greenhouse gas emission of the total refrigerant charge expressed as tonnes of CO2 equivalent
  • m. Refrigerant type
  • n. GWP = Global Warming Potential
  • p. Unit serial number

In Europe, the emission of greenhouse gases of the total refrigerant charge in the system (expressed in tonnes of equivalent CO2) is used to determine the frequency of maintenance interventions. Follow the applicable legislation.

The present publication is drawn up by information only and does not constitute an offer binding upon Daikin Applied Europe S.p.A. Daikin Applied Europe S.p.A. has compiled the content of this publication to the best of its knowledge. No express or implied warranty is given for the completeness, accuracy, reliability or fitness for particular purpose of its content, and the products and services presented therein. Specifications are subject to change without prior notice. Refer to the data communicated at the time of the order. Daikin Applied Europe S.p.A. explicitly rejects any liability for any direct or indirect damage, in the broadest sense, arising from or related to the use and/or interpretation of this publication. All content is copyrighted by Daikin Applied Europe S.p.A.

DAIKIN APPLIED EUROPE S.p.A.

  • Via Piani di Santa Maria, 72 – 00072 Ariccia (Roma) – Italia
  • Tel: (+39) 06 93 73 11
  • Fax: (+39) 06 93 74 014
  • http://www.daikinapplied.eu.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Daikin User Manuals

Related Manuals