EvoDose NXT Venturi Dilution System Instruction Manual
- June 17, 2024
- EvoDose
Table of Contents
EvoDose NXT Venturi Dilution System
Specifications:
- Filter: 100 Mesh / 105 Micron (Optional)
- Pressure Regulator: Optional
- Pipe Clamp for Tube Length >0.5m
- Operating Pressure: Min 1.75 bar Dynamic, Max 6 bar Static
- Color Options: Grey, Black, Beige, Red, White, Blue, Medium Brown (Tan), Green, Orange, Dark Brown, Yellow, Aqua, Purple, Pink, Clear
Product Usage Instructions
Installation :
- Use tools PZ2 and 6mm for installation.
- Follow the provided diagram for component assembly.
Operation:
- Ensure all components are securely installed.
- Refer to the dilution tip chart for accurate mixing ratios.
Maintenance :
- Regularly check for any leaks or damage.
- Clean the filter and pressure regulator as needed.
FAQ:
-
Q: What do the different color options signify?
A: The color options are for identification and customization purposes. You can choose the color that best suits your preferences or organizational needs. -
Q: How do I determine the correct mixing ratio?
A: Refer to the dilution tip chart provided in the manual. The chart specifies the ratio based on the desired output. -
Q: What should I do if I encounter leaks during operation?
A: Check all connections and components for any loose fittings or damaged parts. Tighten connections or replace parts as necessary to resolve the issue.
EvoDose NXT
Instruction Manual
Overview
- Filter – 100 Mesh / 105 Micron (Optional)
- Pressure regulator (Optional)
- Pipe clamp for Tube length >0.5m
Dilution tip chart
Dimensions
Tools
Installation
Operation
Maintenance
PSG Germany GmbH, Hochstr. 150-152, 47228 Duisburg, Germany,
Phone: +49 (0) 2065 89205-0
info@hydrosystemseurope.com
www.hydrosystemseurope.com
HYD10100216 Rev A 02/24
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>