BLUETTI AC500 Power Station User Manual
- June 16, 2024
- Bluetti
Table of Contents
**BLUETTI AC500 Power Station User Manual
**
Thank You!
Thank you for making BLUETTI a part of your family.
From the very beginning, BLUETTI has tried to stay true to a sustainable
future through green energy storage solutions for both indoor and outdoor use
while delivering an exceptional eco-friendly experience for our homes and our
world.
That’s why BLUETTI makes its presence in 70+ countries and is trusted by
millions of customers across the globe.
Declaration
- The installation should be performed by a licensed electrician. Improper installation may result in death or serious injury and property damage.
- This document is provided for reference purpose ONLY and does not constitute legal advice. Please consult the local licensed electrician for details.
BLUETTI shall not be liable for any damage or injury caused by improper installation of the backup system.
120 Volts AC500+B300S Backup System
AC500+B300S’s Machine Type is set to “Single Phase” by default. DO NOT change
this setting if you are operating a single AC500+B300S set.
To build the backup system, you need the following:
Accessories | Qty. |
---|---|
Transfer switch: Reliance TRK0505BR | 1 |
NEMA 14-50P to SS2-50R cord | 1 |
AC charging cable | 1 |
Refer to the diagram below for proper installation of AC500+B300S backup system.
- NEMA 14-50 Outlet
- NEMA SS2-50 Power Inlet Box
- AC500 Input Cable
- AC500 Output Cable
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
240 Volts AC500+B300S Backup System
You can build the 240V Split Phase System by pairing two sets of AC500+B300S together. The system also has double the available output power and capacity. Besides TWO sets of AC500+B300S, you also need the following:
Accessories | Qty. |
---|---|
Transfer switch: Reliance TRK0505BR | 1 |
AC500 split-phase output cable | 1 |
NEMA 14-50 socket | 1 |
AC500 split phase AC charging cable | 1 |
Before installing the Reliance Controls transfer switch system, please make a emergency energy plan that includes which appliances you need during a power outage. It is highly recommended to “balance the load” between the two phases of transfer switch, that’s to say, do not connect high-wattage appliances centrally to a single AC500+B300S set.
- NEMA 14-50 Outlet
- NEMA SS2-50 Power Inlet Box
- AC500 Split-phase Input Cable
- AC500 Split-phase Output Cable
Split Phase Backup System
Caution! The backup split phase system must be properly installed by a licensed electrician.
How to configure the AC500+B300S sets:
Step 1: Turn off both AC500+B300S sets.
Step 2: Connect AC500+B300S sets to transfer switch via the AC500 split-
phase output cable. One NEMA 14-50 plug goes to a set.
Step 3: Connect two AC500 units via the communication cable.
Step 4: Turn on either AC500+B300S set.
Step 5: Go to “Settings” and tap “Next”.
Step 6: Tap “Single Phase”, the machine type option pops up and select “Split phase”.
- Machine Type: Select Split Phase
Step 7: Select the “Master” in the Machine Address pop up.
Step 8: Turn on the other AC500+B300S set. Repeat step 5 and 6 to set its machine type to **“Split phase”.
**
Step 9: Select the “Slave” in the Machine Address pop up.
If the connection fails, clear the alarm history, wait for a moment or then try again.
Please watch the video from: https://www.youtube.com/watch?v=quvcX8mEUCo
NOTE:
- Disconnect the AC charging cables from AC500+B300S sets before connecting to the transfer switch.
- The split phase system can be controlled ONLY on the “Master” set.
- If one of the AC500+B300S sets is out of power, the split phase system fails automatically
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
- In the main panel, two Neutral/Ground bus bars have been connected together with copper strips.
Connect the AC500+B300S sets to the main panel
Charge the 240V split phase system with AC500 split phase AC charging cable.
Plug the cable to a NEMA 14-50 socket (240V )and the other two connectors into
AC500s’ AC input ports.
The AC input ports should be connected to L1/N/PE and L2/N/PE, respectively.
The current capacity of AC input plug shall be ≥ 50A.
WRONG CONNECTION
Warning! DO NOT charge AC500+B300S with standard AC charging cable in the split phase system, as this may cause damage to the batteries inside B300s and invalidate your warranty
L: Live wire
N: Neutral wire
NOTE:
The split phase system supports charging via solar panels. You can charge it by PV and the AC500 split-phase AC charging cable simultaneously. (AC input only through the AC500 split-phase AC charging cable but not the standard AC charging cable).
Accessories
Transfer switch
Recommendation: Reliance Controls TRK0505BR transfer switch.
https://www.bluettipower.com/collections/accessories
50A AC Charging Cable
https://www.bluettipower.com/collections/accessories
BLUETTI AC500 split-phase output cable
https://www.bluettipower.com/collections/accessories
BLUETTI AC500 split-phase AC charging cable
https://www.bluettipower.com/collections/accessories
Communication cable for split-phase function
Please buy it from BLUETTI official store.
https://www.bluettipower.com/products/communication-cable-for-split-phase-
function
NEMA 14-50R socket
For charging the 240V AC500+B300S split phase system.
https://www.bluettipower.com/collections/accessories
NEMA 14-50P to SS2-50R extension cord
For connecting AC500+B300S to the sub panel.
https://www.bluettipower.com/collections/accessories
How to install Reliance Controls
Please refer to Reliance Controls website: www.reliancecontrols.com
More information
Website: www.bluettipower.com
Email: service@bluettipower.com
How to build a partial home backup system with AC500+B300S (Only for US standard).
References
- BLUETTI: Portable Power Station, Solar Generator Kit
- Reliance Controls Corporation
- Explore Solar Accessories for Your Need - BLUETTI
- Communication Cable For Split-Phase | BLUETTI AC300 | EP500 Pro | EP500 | AC500
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>