Haturi Large Metal Toy Box Storage Instruction Manual

June 15, 2024
Haturi

Haturi Large Metal Toy Box Storage

WHAT IN BOX

INSTALLATION

  1. Connecting Rods: Connect the El and E2 top rods in the direction shown in the diagram, put the Fl and F2 connecting rods, and make sure the clips are fully seated in the holes.
  2. Top Frame Installation: After El and E2 are spliced together, make sure they are connected with A and B frames in the upward direction as shown in the dia­gram, make sure the spring snap position is on the right side and keep it facing upward, and then tighten it with G screws.
  3. Installation of the bottom frame: Install the four connected Fl and F2 in the bottom position, and then tighten the left and right connections with H screws.
  4. INSTALLATION OF THE STORAGE BAG: THE LAST Fl, F2 CROSSBAR ON THE TOP NEEDS TO BE SET INTO THE HOLES OF THE STORAGE BAG, AND THEN by THE THIRD STEP OF THE CONNECTION, TIGHTEN THE LEFT AND RIGHT SCREWS, THE OTHER THREE SIDES OF THE BAG WITH VELCRO OVER THE CROSSBAR OF THE FRAME, YOU CAN KEEP THE BAG FIXED.
  5. Installation of the top cover: After opening the metal top cover, insert the plate into the top connecting rod connection, and use the spring clip on the right side to fix the top cover.
  6. Wheel installation: 2 wheels with brakes and 2 universal wheels, you can install the wheels according to your needs, and use a small wrench to fix the wheels.

If you have any installation issues, please watch the installation video or contact us.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals