Paragon GZH3-1212BK Aluminum Composite Roof Panels Instruction Manual
- June 14, 2024
- Paragon
Table of Contents
- Introduction
- List of Parts
- STEP 1 Assembling the Corner Profiles
- STEP 2 Assembling the Rails
- STEP 3 Attaching the Rails to the Corner Profiles
- STEP 4 Secure the Gazebo to a Concrete Floor or Wood Deck
- STEP 5 Installing the Lower Roof Gable Profiles
- STEP 6 Installing the Roof Panels and Upper Roof Profiles
- STEP 7 Installing the Plastic Caps
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Gazebo GZH3-1212B
Aluminium Composite Roof Panels
Assembly Instructions
Introduction
Thank you for purchasing the Gazebo GZH3-1212BKA.
When properly assembled and maintained, this gazebo will provide many years of
enjoyment!
These instructions include helpful hints and important information needed to
safely assemble and properly maintain the gazebo. Please read these
instructions completely before you begin.
Our patented gazebo has been designed for easy assembly. All steps can be
completed by a team of four people.
Before Starting Assembly:
CAREFULLY READ ALL THE INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS
IN THE ORDER THEY ARE PRESENTED.
-
Make sure you have all the necessary parts:
Compare the contents of all cartons to the List of Parts. If ung;orts are missing or damaged, or you have any questions, please contact Customer service: (877)782 4482 before beginning assembly. -
lay the chs out in separate staging areas:
The List of Parts has the corresponding step number referenced to each part. We recommend that while you go through the list, make staging areas for each step and place the parts necessary for each step in these areas. This will save you time and effort during assembly. -
Select a Location:
When selecting a location for your gazebo, a flat level area is essential and if possible with proper water drainage and easy access fo power and water, if neccessary.
Choose a sunny, level position away from overhanging trees and power lines and protected from the VI:ind as nb1uch as possiE|e. Locate underground pipes or cables before preparing the site or anchoring the gazebo.
Noig: You may assemble the gazebo on a hard level surface and move it fo its final location when finished. Make sure that there are no obstacles between the assembly area and the final position. -
Prepare a Foundation:
After choosing a location, proper preparation of the site is recommended. The site must be level.
If the site is not level, create a base slightly larger than the outside dimensions of the gazebo using a perimeter of two by fours filled with either soil, sod or gravel.
Make sure the base is square by measuring the diagonals from both directions and making sure they are equal. The gazebo is secured with pegs into holes cast with concrete.
If you decide to have a concrete base, it is best to contact a reliable contractor to make sure it is flat and level. Make sure you have checked with your local authorities regarding any required building permits. -
Make sure you have the proper tools:
• Tape Measure
• Work Gloves
• Safety goggles
• Phillips Screwdriver
• Spirit Level
• 3/8″ masonry drill bit to drill holes for the concrete anchors supplied.
• 2 Small Step Ladders
• Wooden Mallet
• Scissors and knife
• Liquid soap or WD40 Lubricant
• Hex Key
NOTE: A cordless drill with Phillips head bit is highly recommended but
not essential.
Safety Advice
- The gazebo must be positioned and fixed on a flat level surface.
- Dispose of all plastic bags safely. Keep them out of the reach of children.
- Keep children and pets away from the assembly area until the work is completed.
- Always wear shoes, gloves and safety goggles when working.
- Take special care not to touch overhead power lines with the aluminium profiles.
- Do not attempt to assemble the gazebo in windy or wet conditions.
- Do not position your gazebo in an area exposed fo excessive wind.
- If using power tools or a ladder, always fol- low the manufacturers safety instructions.
- Hot items such as recently used grills, blowtorches etc. must not be stored in the gazebo.
- Make sure the gazebo complies with local building codes.
ATTENTION: DO NOT ATTEMPT TO ASSEMBLE THE GAZEBO ALONE!
List of Parts
The gazebo is shipped in four cartons. These carfons are heavy. Be careful
when liffing them.
Wear proper safety gear including work shoes, gloves and goggles.
The parts are identified by removable stickers.
Place all the parts for each step in staging areas, checking that you have all
pars as you go.
If any parts are missing or damaged, contact customer service before beginning
assembly:
Customer Service:(877) 782 4482 Email: cs-
outdoors@paragongroupusa.com
No. | Profile | Qty | Step | Box |
---|---|---|---|---|
1 | 4 | 1 | 2 | |
2 | 4 | 1 | 3 | |
3 | 4 | 1 | 3 | |
4 | 4 | 1 | 3 | |
5 | 4 | 2 | 2 | |
6 | 4 | 2 | 1 | |
9 | 12 | 2 | 3 | |
10 | 12 | 2 | 3 | |
11 | 4 | 5.6 | 2 |
4
12| | 4| 5| 1
13| | 4| 5.6| 2
4| 1
14| | 4| 5.6| 2
4| 1
15| | 4| 6| 4
16| | 4| 6| 4
17| | 4| 6| 4
18| | 1| 5| 3
19| | 1| 5| 3
23| | 2| 5| 3
STEP 1 Assembling the Corner Profiles
Place all the parts on a level surface.
A Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
Components ATTENTION: The corner profile
(1) has two screw holes to connect it to the corner roof connector (4) and 8
pre-drilled screw holes to attach rails (5,6) in step 3 at its fop end.
It has two screw holes to connect it to the support plate (3) at its bottom
end. 1. A Place corner profiles (1) parallel to each other on the ground.
Attach one Corner roof connector (4) to each top end as shown and fasten with
screws (30). 1. B Slide support frames (2)
over lower end of corner Erofiles( 1).
Attach support plates (3) o corner profiles (1) as shown, using two screws(30)
for each plate, make sure all screws are perpendicularly info the profile
holes. Leave sufipon frames (2) about
10″ over lower end of corner profiles (1) until step 4. (Secure the gazebo to
ground)
STEP 2 Assembling the Rails
2.A Insert rail connector (51)
info blunt end of the rail (5) secured with screws (28).
Insert long rail (5,51) into blunt end of the rail (6) secured with screws
(28) as shown.
Repeat to create four sets (5+6). 2.B Attach three
outer roof connectors (10) and three inner roof connectors (9) to each rail
set (5,6) at pre-drilled screw holes, using screws (29). ATTENTION: Attach roof connectors facing exactly in the
directions shown.
STEP 3 Attaching the Rails to the Corner Profiles
3.C Using at least 3 people, attach the remaining two roof
profile sefs (5+6) to corner profiles (1), connecting all four corner profiles
(1).
Fasten with four screws (29) and supplied magnetic hex key (41) on each side.
Close holes in profile sets with plastic caps #3 (36). IMPORTANT: After this step you should place the gazebo
frame in its desired location.
Make sure all corners are squared at 90 degrees.
STEP 4 Secure the Gazebo to a Concrete Floor or Wood Deck
4.A Concrete Floor:
- Drill holes approx. 3.00 inches deep and use a mallet to set up.
- 3/8” masonry drill bit to drill holes for the concrete anchors supplied.
- Using a concrete drill, drill holes into the concrete floor, corresponding to the holes in support plates (3).
- Insert concrete bolts (40) into the holes and hammer into place, using a mallet.
- Fasten concrete bolts with washers and nuts.
Wood Deck:
- Using an electric wood drill, drill holes into the wood floor, corresponding to the holes in support plates(3).
- Insert wood screws with washers(not supplied) into the holes and fasten, using an electric screw driver.
NOTE: After securing the gazebo fo the ground, we highly recommend filling the corner profiles (1) with 2 bags (20LBs each) of Pea Gravel each for extra stability, as shown.
STEP 5 Installing the Lower Roof Gable Profiles
ATTENTION:
DO NOT ATTEMPT TO ASSEMBLE THIS ALONE! Using at
least three people, install the roof gables (11,12,13,14) in the following
order:
VIEW FROM BELOW (from inside gazebo)
ATTENTION: Roof Profiles, roof h panels and gables must be aligned
properly during assembly to minimize any possibility of leaking.
IMPORTANT: Make sure that roof gable profiles (11,12,13,14) are installed
exactly as shown so that the pre-drilled screw holes will ali?‘n prorerly with
screw holes on the root panels.
5. A Using screws (31) and nuts (35), connect roof gable
profiles (11) to corner roof connectors (4) on top of corner profiles (1).
Using screws (29), connect roof gable profiles (11) to roof top connectors
(18) exactly as shown. 5.B Using screws (29),
connect roof gable profile (52) to roof top connector (19) as shown.
Connect roof top connector (19) to U-shaped connector (23) from above, using
screws (29). 5.C Fit roof panels (63,63) on
top of roof gable profiles (52,52).
Place roof profile (52A) on the top of roof gable profile (52) and fasten with
two screws (32) from below (inside gazebo). IMPORTANT: Gently cut on the
edge of the panels on both side with knife and remove protective plastic of
roof panels.
Place with black surface toward the sun facing out when installing.5.E Using screws (29), connect
U-shaped connector (23) underneath of roof top connector (18) as shown.
Using screws (29), connect roof
profile (12) to roof top connector (18) from below; the other end to inner
roof connector (9) by screw (29) as shown. 5.F Attach Y-connector (43) underneath of roof gable profiles
(11), using screw (29) as shown.
Connect roof gable profile (13,14) to Y-connector (43) and other end to inner
roof connector (9), using screws (29). 5.G Attach
hook(42) on the roof top connector (18).
Place corner cap(27) on the top of corer profiles(1) and fasten with
screws(30).
STEP 6 Installing the Roof Panels and Upper Roof Profiles
IMPORTANT: Gently cut on the edge of the panels on both side with knife
and remove protective plastic of roof panels. Place with black surface toward
the sun facing out when installing. Fit roof
panel (15) on top of roof profiles (11,13 and 14) as shown and fasten with one
screw (34) from below to outer roof connector (10).
Fit roof panel (16) on top of roof profiles (11,14) as shown and fasten with
one screw (34) from below to outer roof connector (10). 6.B Place roof profile (14A) on top of roof profile (14) as
shown. Align both profiles. Fasten with screws (32) from below (inside
gazebo). ATTENTION: Roof Profiles,
roof panels and gables must be aligned properly during assembly to minimize
any possibility of leaking.
STEP 7 Installing the Plastic Caps
Gazebo GZH3-1212BK
Aluminium Composite Roof Panels
Assembly Instructions
WARRANTY:
Warranty covers damage due to manufacturing defects only for a period of 5
years on the structure, and 5 years on the Aluminum Shell from date of
purchase. Warranty does not cover weather inflicted damage and/or damages
causes caused by not following assembly instructions and adhering to warnings
in manual. Warranty does not cover user error, negligence, or misuse.
ATTENTION: Roof profiles,roof panels and gables must be aligned properly
during assembly to minimize any possibility of leaking.
WARNING: Cancer and Reproductive Harm –
www.P65Warnings.ca.gov.
AVERTISSEMENT: Cancer et Troubles de I’appareil reproducteur –
www.P65Warnings.ca.gov.
ADVERTENCIA: Cdncer y Daiio Reproductivo –
www.P65Warnings.ca.gov.
www.paragon.outdoor.com
@paragonoutdorcompany
Paragon Group USA
Customer Service:(877) 782 4482
Email:cs-outdoors@paragongroupusa.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>