Sioux Chief ASTM F1807 Stainless Steel Cinch Clamp Connection User Guide
- June 14, 2024
- Sioux Chief
Table of Contents
Sioux Chief ASTM F1807 Stainless Steel Cinch Clamp Connection
Connection Installation
- Cut tube at 90-degrees. Do not crush OD of tubing with cutters. Hint: Slightly rotate cutter during blade engagement.
- Install ASTM F2098 stainless steel cinch clamp onto OD of tube. Install fitting fully into tube.
Note:
Full ear closure is required for proper installation. Always visually inspect
clamp for correct closed-ear form.
- Position clamp between 3/16″ and 1/4″ from tube end to ensure coverage of both sealing barbs.
- Close clamp ear with ratchet pincer tool. Tool will not release until clamp is fully closed. Remove any defective connections. Test all completed joints.
Check ratchet pincer tool calibration with a GO/NO-GO gauge daily. Refer to tool manufacturer’s instructions for calibration procedures.
Installation Notes:
- In high-chloride water conditions, use only polymer (ASTM F2159) fittings. Do Not install in contact with concrete.
- Avoid contact with soldering flux.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>