BLUETTI AC300 Generator Module Inverter User Manual
- June 14, 2024
- Bluetti
Table of Contents
BLUETTI AC300 Generator Module Inverter
Thank You!
Thank you for making BLUETTI a part of your family.
From the very beginning, BLUETTI has tried to stay true to a sustainable
future through green energy storage solutions for both indoor and outdoor use
while delivering an exceptional eco-friendly experience for our homes and our
world. That’s why BLUETTI makes its presence in 70+ countries and is trusted
by millions of customers across the globe.
Declaration
- The installation should be performed by a licensed electrician. Improper installation may result in death or serious injury and property damage.
- This document is provided for reference purpose ON LY and does not constitute legal advice. Please consult the local licensed electrician for details. BLUETTI shall not be liable for any damage or injury caused by improper installation of the backup system.
120 Volts AC300+B300 Backup System
AC300+B300’s Machine Type is set to “Single Phase” by default. DO NOT change
this setting if you are operating a single AC300+B300 set.
To build the backup system, you need the following:
Accessories | Qty. |
---|---|
Transfer switch: Reliance 370A Pro/Tran 2 | 1 |
NEMA TT30-P to Ll4-30R extension cord | 1 |
30AAC charging cable | 1 |
NOTE: Please read the Reliance 310A Pro/Tran2 manual before installation.
http://www.reliancecontrols.com/Documents/PT2%20Loadside%20lnstallation%20and%20Operating%20Instructions.pdf
Refer to the diagram below for proper installation of AC300+B300 backup
system.
NOTE:
1: TT-30 Socket
2: NEMA Ll4-30 Inlet on the transfer switch
3: 30A AC Charge cable
4: TT30-P to N EMA Ll4-30 extension cord
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
240 Volts AC300+B300 Backup System
You can build the 240V Split Phase System by pairing two sets of AC300+B300 together. The system also has double the available output power and capacity. Besides TWO sets of AC300+B300, you also need the following:
Accessories | Qty. |
---|---|
Transfer switch: Reliance 370A Pro/Tran 2 | 1 |
AC300 split-phase output cable | 1 |
NEMA Ll4-30R socket | 1 |
AC300 30A split phase AC charging cable | 1 |
Communication cable for split-phase function | 1 |
Please read the Reliance 310A Pro/Tran 2 manual before installation.
http://www.reliancecontrols.com/Documents/PT2%20Loadside%20lnstallation%20and%20Operating%20instructions.pdf
Before installing the Reliance Controls transfer switch system, please make a
emergency energy plan that includes which appliances you need during a power
outage. It is highly recommended to “balance the load” between the two phases
of transfer switch, that’s to say, do not connect high-wattage appliances
centrally to a single AC300+B300 set.
NOTE:
1: NEMA Ll4-30 Socket (Connect to AC300 Input)
2: NEMA Ll4-30 Inlet (Connect to AC300 Output)
3: 30A Split-phase AC Charging Cable
4: AC300 Split-phase Output Cable
Caution! The backup split phase system must be properly installed by a licensed electrician.
How to configure the AC300+B300 sets:
Step 1 : Turn off both AC300+B300 sets.
Step 2: Connect AC300+B300 sets to transfer switch via the AC300 split-
phase output cable. One TT-30 plug goes to a set.
Step 3 : Connect two AC300 units via the communication cable.
Step 4 : Turn on either AC300+B300 set.
Step 5 : Go to “Settings” and tap “Next”.
Step 6: Tap “Single Phase”, the machine type option pops up and select “Split phase”.
- Machine Type : Select Split Phase
Step 7: Select the “Master” in the Machine Address pop up.
Step 8: Turn on the other AC300+B300 set. Repeat step 5 and 6 to set its
machine type to “Split phase”.
Step 9: Select the “Slave” in the Machine Address pop up.
If the connection fails, clear the alarm history and reconnect.
NOTE:
- Disconnect the AC charging cables from AC300+B300 sets before connecting to the transfer switch.
- The split phase system can be controlled ONLY on the “Master” set.
- If one of the AC300+B300 sets is out of power, the split phase system fails automatically.
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
- In the main panel, two Neutral/Ground bus bars have been connected together with copper strips.
Connect the AC300+B300 sets to the main panel
Charge the 240V split phase system with AC300 30A split phase AC charging
cable.
Plug the cable to a NEMA Ll4-30 socket (240V )and the other two connectors
into AC300s’ AC input ports.
The AC input ports should be connected to Ll/N/PE and L2/N/PE, respectively.
The current capacity of AC input plug shall be::: 30A.
WRONG CONNECTION
Warning! DO NOT charge AC300+B300 with standard AC charging cable in the
split phase system, as this may cause damage to the batteries inside B300s and
invalidate your warranty.
L: Live wire
N: Neutral wire
NOTE:
The split phase system supports charging via solar panels. You can charge it
by PV and the AC300 30A split-phase AC charging cable simultaneously.
(AC input only through the AC300 30A split-phase AC charging cable but not
the standard AC charging cable)
Accessories
Transfer switch
Recommendation: Reliance Controls 370A PRO/TRAN 2 transfer switch.
BLUETTI 30A AC charging cable
Please buy it from BLUETTI official store.
AC300 30A AC Charging Cable
BLUETTI AC300 split-phase output cable
Please buy it from BLUETTI official store.
https://www.bluettipower.com
BLUETTI AC300 30A split-phase AC charging cable
Please buy it from BLUETTI official store.
https://www.bluettipower.com/products/30a-ac-charging-cable-for-split-phase-
function
Communication cable for split-phase function
Please buy it from BLUETTI official store.
https://www.bluettipower.com/products/communication-cable-for-split-phase-
function
NEMA Ll4-30R socket
For charging the 240V AC300+B300 split phase system.
Recommendation: Journeyman-Pro HJ P 2770 NEMA Ll4-30R socket.
NEMA TT30-P to Ll4-30R extension cord
For connecting AC300+B300 to the sub panel.
Recommendation: Parkworld NEMA TT30-P to Ll4-30R extension Cord.
Circuit breaker & protection box
If you have a residential solar array with a voltage of 72V-750V, you’re
strongly recommended to use a DC circuit breaker panel to enable or disable
solar charging.
NOTE: If there are two solar panel arrays with a total open circuit
voltage of 72-lS0V, you also need two 2P 76A DC circuit breakers.
How to install Reliance Controls
Please refer to Reliance Controls website:
www.reliancecontrols.com
How to install Reliance Controls ProTran2 – Partl, Tools and Planning
https://www.youtube.com/watch?v=xTqjwt6WJ7o&list=PLpYCEOn7d22iDNwpVnOF9HULSUYBBRV86
How to install Reliance Controls ProTran2 – Part2, Mounting
https://www.youtube.com/watch?v=wNbBHVHgw0Y&list=PLpVCEOn7d22iDNwpVnOF9HULSUVBBRY86&index=2
How to install Reliance Controls ProTran2 – Part3, Wiring
https://www.youtube.com/watch?v=TKruj9BpZM8&list=PLpVCEOn7d22iDNwpVnOF9HULSUYBBRV86&index=3
How to install Reliance Controls ProTran2 – Part4, Replacing Circuit
Breakers
https://www.youtube.com/watch?v=lkOuauT-
YPB&list=PLpYCEOn7d22iDNwpVnOF9HULSUYBBRV86&index=4
How to install Reliance Controls ProTran2 – Parts, Installing The Power
Inlet Box
https://www.youtube.com/watch?v=OM8sYRhEVPY&list=PLpVCEOn7d22iDNwpVnOF9HULSUVBBRV86&index=5
How to install dd Controls ProTran2 – Part6, How To Operate
https://www.youtube.com/watch?v=04GA9AK8Tmo&list=PLpVCEOn7d22iDNwpVnOF9HULSUYBBRY86&index=6
More information
Website: www.bluettipower.com
Email: service@bluettipower.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>