Acquaer B1AdJ8dGXPL 2 HP 220V Deep Well Submersible Pump Instructions
- June 14, 2024
- Acquaer
Table of Contents
WIRING INSTRUCTIONS
Submersible Well Pump
220V/60Hz
ATTENTION:
BLACK – HOT WIRE (110V),
BLUE – HOT WIRE (110V) ,
YELLOW – GROUND WIRE (PE).
Splice Kit:
A: Black Heat Shrink Tubing | B:White Heat Shrink Tubing | C: Butt Connector |
---|---|---|
D: Rubber Splicing Tape | E: Hot Melt Adhesive | F: Waterproof Electrical Tape |
ATTENTION:
BLACK – HOT WIRE (110V), BLUE – HOT WIRE (110V) , YELLOW – GROUND WIRE (PE).
Extension Cord Recommendations:
HP| Cable Length(ft)| 3-52 ft| 53- 98 ft| 99- 148 ft| 149- 197 ft| 198- 246
ft| 247- 295 ft
---|---|---|---|---|---|---|---
1 HP| Wire Size (AWG)| 18| 17| 16| 16| 15| 15
2 HP| Wire Size (AWG)| 16| 15| 14| 14| 13| 13
Ref. accessory numbers A, B, C, D, E & F on prev. page of splice kit.
****Match Each Other Correctly
- Place B over each individual wire.
- Firmly crimp each splice with crimping plier.
- Heat B with a heat gun or lighter.
- Wind D on the butt splice connections.
- Wrap the three wires together with E.
- Slide A over the connection and evenly heat it on all sides.
- Wind F over the shrink tubing A and cable.
CAUTION
- The pump’s voltage must match your power supply.
- Please install external check valves at the discharge to prevent flowback.
- The pump must be installed in a 4″ or larger well casing with torque arrestors.
- Please don’t run the pump dry. Make sure it is fully submerged in water.
- The pump is designed for clean water. Please make sure all fines and foreign matters in the well are removed before installation.
- Please keep the pump at least 10ft from the bottom of well,and above the well screen or casing perforations.
For more information on installation, please read the user manual.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>