legrand 311119 Keor MOD UPS Instruction Manual
- June 13, 2024
- Legrand
Table of Contents
legrand 311119 Keor MOD UPS
Product Information
- Product Name : Keor MOD
- Model Number : LE13363AC-05/23-01 GF
- Languages: English, Italiano, Deutsch, Spanish, French
Content of the Kit
- A a1 – Lateral mount subassembly (Qty : 1+1)
- B b3 b2 b1 – External shoulder Draw.5849 (Qty : 2)
- a9 – Base Plate Draw.6087 (Qty: 4)
- a10 – Screws M8X20 Cl.8.8 (Qty : 4)
- a11 – Safety washer for M8 DIN 128 Cl.8.8 (Qty : 4)
- a5 – Nut UNI5587 C.L.8.8Cl.8.8 (Qty : 2)
- a7 – Washer 12X36X2.5 UNI6593 (Qty : 1)
- a8 – Washer for UNI1751Cl.8.8 (Qty : 1)
- b2 – Screws M10X20 Cl 8.8 ( Qty: 6+6)
- b3 – Safety washer for M10 DIN 128 Cl.8.8 (Qty : 6+6)
- b4 – Washer for M10 DIN 125 Cl.8.8 (Qty : 6+6)
Product Usage Instructions
Installation Procedure
Step 1
Follow the installation manual for Keor MOD to install the seismic
basement.
Step 2
Refer to the image below to align the unit with the guides anchored to the
ground. Keep a distance of 16 mm between the side holes.
Step 3
Align the unit with the guides anchored to the ground, refer to the image
below to align the side holes, it is necessary to keep a distance of 16 mm.
Step 4
Follow the instructions in the Keor MOD installation manual to install the
battery packs in the drawers.
Step 5
Mount a metal bar with two relative screws for each battery drawer to keep
the battery packs stable. Refer to the picture in the manual for details.
Step 6 (only for 3 111 19)
For Keor MOD 125 kVA (3 111 19), in addition to the seismic basement, there
are ten metal bars and twenty M4x10 screws provided. Follow the instructions
in the Keor MOD installation manual to install the battery packs, then mount a
metal bar with two relative screws for each battery drawer.
Note: For detailed electrical data, refer to the technical specifications of Keor MOD.
Introduction
- This manual is an addendum to the installation manual for Keor MOD.
- It describes only the procedure to finalize the installation of the seismic basement of the Keor MOD with Seismic Kit 3 111 19 and 3 111 20.
For all the other information related to the installation and the use, consult the installation and user/manual for Keor MOD. For the technical electrical data
- 3 111 19 is equivalent to 3 104 80.
- 3 111 20 is equivalent to 3 104 81.
Content of the kit
TAG | DESCRIPTION | QTY |
---|---|---|
A | Lateral mount subassembly | 1+1 |
a1 | Base Plate Draw.6087 | 4 |
a9 | Screws M8X20 Cl.8.8 | 4 |
a10 | Safety washer for M8 DIN 128 Cl.8.8 | 4 |
a11 | Flat Washer for M8 ISO 7092 Cl.8.8 | 4 |
B | External shoulder Draw.5849 | 2 |
b2 | Screws M10X20 Cl 8.8 | 6+6 |
b3 | Safety washer for M10 DIN 128 Cl.8.8 | 6+6 |
b4 | Washer for M10 DIN 125 Cl.8.8 | 6+6 |
a5 | Nut UNI5587 C.L.8.8Cl.8.8 | 2 |
a7 | Washer 12X36X2.5 UNI6593 | 1 |
a8 | Washer for UNI1751Cl.8.8 | 1 |
POS. | TORQUING MOMENT | |
--- | --- | |
a9 | 18 Nm | |
b1 | 36 Nm |
Installation procedure
Step 1
Remove the UPS cabinet from the pallet by following the unpackaging
instructions in the installation manual.
Do not proceed with step 2 until the unpackaging has been completed.
Step 2
- Install the lateral mounts (A) to the ground keeping them aligned and with each other.
- Use 6 (3+3) M16 certified seismic fasteners to install the subassemblies, following the indications provided by the supplier. Install the lateral mounts in the final placement of the unit.
- Torquing moment for M16 provided by seismic anchor producer.
2.3 Step 3
Align the unit with the guides anchored to the ground, refer to the image
below to align the side holes, it is necessary to keep a distance of 16 mm.
Step 4
- Assemble the fins (a2) with the support feet using grub screws (a3), nuts (b3) M12 and flat washers.
- Mount the assembly of the four fins on the front brackets using the respective M8X20 screws and washers.
Step 5
- Adjust the support feet one by one until the machine has reached the height of the fixing holes on the side shoulder (A).
- Fix the side shoulders (A) with the preassembled shoulders (B) using the 12 (6 + 6) screws M10X20 (a4).
Step 6 (only for 3 111 19)
Only for the 3 111 19 (Keor MOD 125 kVA), in addition to the seismic basement,
there are also ten metal bars and twenty M4x10 screws to keep stable the
battery packs in the drawers. For each battery drawer, after having followed
the instructions in the Keor MOD installation manual to install the battery
packs, mount a metal bar with two relative screws as shown in the picture:
The following picture shows the UPS with the seismic basement mounted
LEGRAND
Pro and Consumer Service BP 30076 – 87002
- LIMOGES CEDEX FRANCE www.legrand.com
Legrand reserves at any time the right to modify the contents of this booklet and to communicate in any torm and modality, the changes brought to the same
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>