EMU P20A000LO 3-phase power meter with LoRa interface User Manual
- June 4, 2024
- EMU
Table of Contents
P20A000LO 3-phase power meter with LoRa interface
User Manual EMU Professional II
Document Reference: 1451 Version: 3.5 Date: 11.05.2022
User Manual EMU Professional II
Inhaltsverzeichnis
1 General
6
Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Disclaimer / Liability Exclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Duties of the Customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Data Backup & Security Backup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Monitoring Obligation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Access Authorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Responsibility for the ITEnvironment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Declaration of Conformity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Comments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2 Scope of Delivery and Reception Inspection
8
3 Product Description
9
Versions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Firmware Versions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Protection against unauthorized alteration of settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Measurement Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Operation Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Overview Front EMU Professional II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Overview Laserprint Right . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Overview Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Compatible Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4 Technical Data
18
5 Commissioning / Checkup
20
Settings ex Factory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Connection Diagram Direct Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Connection Diagram Converter Counter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Tightening Torque . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
SpringCage Clamps Wire Diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Cable Requirements for Direct Connections >65A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6 Operation
24
Main Menu Pages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Sub Menu Pages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Power and Current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Voltage, Power Factor and Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Load Profile and Logbook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
7 Configuration Settings
30
Tariff Change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Set Number of Tariffs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Real Time Clock (RTC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Configuration on the Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Configuration over External Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Automatic Synchronization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Configuration of Transformer Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
S0 Pulse Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
S0 Impulse Duration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
2
User Manual EMU Professional II
Configuration of the Energy Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Energy per Tariff: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Energy per Phase: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
8 Configuration Interfaces
34
Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
MBus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Settings ex Factory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Connection Diagram MBus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Configuration of the Primary Address on the Device . . . . . . . . . . . . . . . . . . . . . . . . . 35
Configuration of the Secondary Address on the Device . . . . . . . . . . . . . . . . . . . . . . . . 35
Configuration of the Baud Rate on the Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Configuration via MBConnect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
S0 Pulse Output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Settings ex Factory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Connection Diagram S0 Pulse Output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Configuration Type of ReadOut . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Configuration of the Pulse Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Configuration of the Pulse Duration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Data Available for ReadOut . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
TPC/IP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Settings ExFactory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Connection Diagram TCP/IP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Configuration and Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
ModBus RTU, ModBus TPC/IP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
LoRa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Ex Factory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Configuration and Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
9 In Case of Errors
39
Possible Errors after Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Wrong Meter Readings on the Converter Counter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Behavior with Export and Import . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
The EMU Professional II Sends Wrong Information on the S0 Interface . . . . . . . . . . . . . . . . . 39
Tariff Change Does Not Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
The “L123” Display Constantly Blinks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Error Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
10 Extended Information for Load Profile According to PTBA 50.7
41
Measurement Correctness Note . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Auflagen für den Verwender im Sinne des § 23 der Mess und Eichverordnung . . . . . . . . . . 41
Transparenz der Verwendung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Tarifierung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Fehlermeldungen/Uhrzeitverstellungen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Verwendung der Kommunikationsschnittstellen . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Zeitsynchronisierung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Messergebnisse, die nicht für Verrechnungszwecke verwendet werden dürfen . . . . . . . . . . 42
Logbuchfunktion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
EMU Professional II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
CT Ratio and VT Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Real Time Clock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
S0 Impulse Output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Use for Billing Purposes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Interval of Recording . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Time Synchronization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Tariff Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
External Readout over Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Memory Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
3
User Manual EMU Professional II
Power Failure and Reboot . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . 46 Display Load Profile . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 Display
Logbook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . 47
In Case of a Time Adjustment . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . 48 In Case of a Ratio Adjustment . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 In Case of a
Impulse Duration Adjustment . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . 49 In Case of a Impulse Rate Adjustment . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . 49
4
User Manual EMU Professional II
Doc. Ref 1452 1452 1452 1452 1452 1452 1452
Version Revision Date V1.0 25.01.2021 V2.0 02.02.2021 V2.1 18.02.2021 V2.2 23.03.2021 V2.4 24.03.2021 V2.5 12.04.2021 V2.6 24.06.2021
1452 1452
V2.7 25.06.2021 V2.8 01.07.2021
1452
V2.9 22.07.2021
1452 1452 1452 1452
1452
1451
V3.0 V3.1 V3.2 V3.3
21.09.2021 30.09.2021 10.12.2021 06.04.2022
V3.4 13.04.2022
V3.5 11.05.2022
Token met met met met met met met
Company
EMU Electronic AG EMU Electronic AG EMU Electronic AG EMU Electronic AG EMU
Electronic AG EMU Electronic AG EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
met EMU Electronic AG
fbo
EMU Electronic
AG
met EMU Electronic AG
Changes
Creation of document
Structuring, completion
Improvements of Translation, Clean up Supplemental information for load
profile PTBA 50.7 “Messrichtigkeitshinweise” added Customer responsibilities
added Added: TCP/IP Interface, Update: Number of available Logbook and load
profile entries Addition NTP error, fixed error TNP > NTP, updated notes for
S0, converter ratios and RTC restructuring of interfaces. Interfaces have
their own document now. Added annotation to new document Aligning with german
version. Picture renewal. Tariff note for 4 tariffs. Adjustment of S0 Output
Added further warnings regarding converter counter Improved safety
instructions. Revamp of NTP, TNV & TNS PTB: Rebootcase added
Information on springcage clamps specified. Updated LoRa interface added
further information about energy direction (display) Rework of Doc.Ref
numbers. Same document in different language no longer has a different Doc.Ref
number
5
User Manual EMU Professional II
General
Safety Instructions
Please read this user manual as well as all other supplementary documents for
the EMU Professional II carefully.
Please pay special attention to the safety instructions and warnings when
using the EMU Professional II and this user manual. Nonobservance can lead to
massive damage to persons and property.
Please respect the given electrical, mechanical and other boundaries of the
EMU Professional II. Nonobser vance of these boundaries can lead to massive
damage to persons and property.
Unauthorized changes to the EMU Professional II voids all warranties and
precludes any and all rights for compensation on the part of EMU Electronic AG
in case of damage.
The usual local security and work rules must be observed. The installation of
the meter must be carried out by qualified and trained personnel. Please read
the installation instructions carefully.
The following symbols indicate areas where special attention is necessary:
,
This symbol combined with the word “Note:” is used to describe important information, an important
procedure or handling.
,
This symbol indicates a potentially very dangerous situation where damage to persons and property
could occur if these warnings are not heeded.
Maintenance
The EMU Professional II is maintenance free. In case of damages (for example
shipping, incorrect connection or storage) repairs may only be done by EMU
Electronic AG.
Disclaimer / Liability Exclusion
The choice of the EMU energy meter and determination of the suitability of the
meter type for a particular purpose are solely the responsibility of the
buyer. EMU Electronic takes no responsibility for this.
Data / information in catalogs and data sheets do not promise special
properties, but are determined by expe rience and measurements.
Liability for damages caused by improper operation / projecting or malfunction
of the energy meter is excluded. The operator/ project engineer has to take
care that improper operation/ planning and malfunctions can not cause further
damage. For defects or damage caused by improper use of the EMU energy meter
or by not following the manual, no warranty is given.
Duties of the Customer
Data Backup & Security Backup
The customer is responsible for a suitable data backup regardless of the type
of installation of the EMU Profes sional II energy meter. The risks and costs
of operation rest with the customer. EMU can help with developing possible
concepts for operation within the scope of further services. The
responsibility for establishing the required readout and securitybackups for
safe operations rests with the customer. The securitybackups must be stored
securely by the customer.
Monitoring Obligation
The customer is obligated to monitor the energy meters to identify outages of
measuring points immediately, 24h later at the latest.
6
User Manual EMU Professional II
Access Authorization
The customer is responsible for the technical and organizational security
against thirdparty involvement of the EMU Professional II.
Responsibility for the ITEnvironment
The customer is responsible for their ITenvironment as well as the
safeguarding of it’s access. It is brought to the customers attention that the
EMU Professional II energy meter as well as it’s FWUpdates (Firmware) have
certain system requirements. It is the responsibility of the customer to
conform to these re quirements. It is the exclusive responsibility of the
customer to provide the necessary hardware and personnel required for the
EMUFirmware. The customer is advised to take precautions in case of partial or
full failure of the EMU Professional II energy meter (e.g. daily backups,
interference diagnosis, regular examination of measurements, contingency
plans). It is their sole responsibility to provide necessary infrastructure
and ensure functionality of the work environment and it’s technical
capability. The initial system requirements can change during operation or due
to an update. The customer is responsible for keeping themselves up to date on
these requirements and to ensure system compatibility before installing
updates. A daily readout and archiving of loadprofiles for the EMU
Professional II LP is required.
Declaration of Conformity
For our full declaration of conformity for the EMU Professional II please
refer to the document “Declaration of conformity d f e 2020.pdf”
Comments
Your comments are welcome. If you have any questions after consulting this
manual, please contact us via email at helpdesk@emuag.ch
7
User Manual EMU Professional II
Scope of Delivery and Reception Inspection
Scope of delivery: , A quickstart guide which explains the most important
elements of the meter. Please read that guide thoroughly. , Your EMU
Professional II: Item nr. P2xA0x0xx
If your delivery exhibits obvious damages, please contact us immediately via
email at helpdesk@emuag.ch
8
User Manual EMU Professional II
Product Description
The EMU Professional II is:
, to be used as a 3phase energy meter only. , intended for static 3phase
measurements of imported and exported active energy according to EN50470
3:2006 in the residential, business and industrial sector.
These measurements can be used for billing purposes.
, intended for static 3phase measurements of imported and exported reactive
energy according to EN62053 in the residential, business and industrial
sector.
These measurements can be used for billing purposes.
, suitable for installation in static, weatherproof control enclosures in
buildings. , deployable in fourwire systems and TNgrids. , applicable for
direct metering for up to 100A in its 3/100 model. , only applicable for
measurements in medium and high voltage grids if used in conjunction with
current
and voltage transformers. , designed to be used in conjunction with external
../1A or ../5A current transformers in its 3/5 model. , suitable for use in
the residential, business and industrial sector. , certified for load profile
according to PTBA 20.1 and PTBA 50.7 in the LP version.
You are able to display the measurement data on the display or read them out
over diverse interfaces of the EMU Professional II.
Note: The LP version of the EMU Professional II is only certified for active energy measurement billing purposes!
Note: A special chapter at the end of this user manual describes the LP
version in detail. Information in the chapter “Extended Information for Load
Profile According to PTBA 50.7” supercedes the corresponding information in
the following user manual.
Attention: Improper use of the EMU Professional II can lead to severe personal
or property damage.
Versions
All meters are certified according to MID B+D. The LP versions are further
certified for load profile measure ments according to PTBA 20.1 and PTBA 50.7.
Article Number P20A0000 P20A000M P20A000T P20A000MO P20A000LO P20A030M
P20A030T
P21A0000
Description
EMU Professional II 3/100 EMU Professional II 3/100 MBus EMU Professional II
3/100 TCP/IP EMU Professional II 3/100 Modbus EMU Professional II 3/100 LoRa
EMU Professional II 3/100 MBus LP
EMU Professional II 3/100 TCP/IP LP
EMU Professional II 3/5
Supplementary Information
MID B+D Certified MID B+D Certified
MID B+D Certified
MID B+D Certified
MID B+D Certified MID B+D, PTBA 20.1 and PTBA 50.7 certified MID B+D, PTBA
20.1 and PTBA 50.7 certified MID B+D Certified
EAN/GTIN Number 7649991279014 7649991279021 7649991279038 7649991279045
7649991279052 7649991279069
7649991279076
7649991279090
9
User Manual EMU Professional II
Article Number P21A000M P21A000T P21A000MO P21A000LO P21A030M
P21A030T
Description
EMU Professional II 3/5 MBus EMU Professional II 3/5 TCP/IP EMU Professional
II 3/5 Modbus EMU Professional II 3/5 LoRa EMU Professional II 3/5 MBus LP
EMU Professional II 3/5 TCP/IP LP
Supplementary Information
MID B+D Certified MID B+D Certified MID B+D Certified MID B+D Certified MID
B+D, PTBA 20.1 and PTBA 50.7 certified MID B+D, PTBA 20.1 and PTBA 50.7
certified
EAN/GTIN Number 7649991279106 7649991279113 7649991279120 7649991279137
7649991279144
7649991279151
Firmware Versions
The EMU Professional II has two firmware versions.
, The device FWVersion: Device firmware version and checksum can be found in
the settings menu “SW Version”.
, The certified MID FWVersion: MID firmware version and checksum can be found
in the settings menu “SW Version” by pressing the “Arrow down” Button for more
than 2 seconds.
Protection against unauthorized alteration of settings
A lead seal can be affixed to the EMU Professional II to ensure the integrity
of the settings. Furthermore an adhesive seal label makes any opening of the
meter obvious.
Note: The LP version of the EMU Professional II is secured by an adhesive seal
label on both sides of the meter.
10
User Manual EMU Professional II
Similar to picture.
Measurement Process
The EMU Professional II measures current and voltage as follows:
The EMU Professional II measures current and voltage each for 1 second after
which the next measurement starts. During this second the following procedure
happens: The EMU Professional II records 2520 measu rement points for current
I and voltage U each. These measurement points have a resolution of 32bit. All
measurement values for both the current I and voltage U are squared, added up
and divided by the number of measurement points (2520) at the end of the
second. After this second the EMU Professional II calculates the square root
of this value to get the RMS value for both current and voltage:
c U12
+ U22 + ¨ ¨ ¨ + U7268 2520
=
Uef f
c I12
+ I22 + ¨ ¨ ¨ + I7268 2520
=
Ief f
At the same time the following integral is calculated:
U ¨ I dt
Multiplying Urms and Irms results in the apparent power S:
S = Ueff ¨ Ieff
The power factor (cos) is calculated with:
U ¨ I dt = S
And the active power :
P =F ¨S
The calculated integral of current and voltage, as well as power ensures the coverage of nonsine currents up to the 7th harmonic.
11
User Manual EMU Professional II
Operation Concept
Note: If you use the EMU Professional II in conjunction with an EMU MBus
Center you can set the addresses and baud rates of the EMU Professional via
the EMU MBus Center. The following explains the control elements of the EMU
Professional II.
Buttons
Picture similar The manipulation of the meter is done via two touch buttons
and the service button (SRVC):
, “Arrow right” (Button 1) , Switch to the next main menu page with a short
press (<2s) of the button. , Switch to the previous main menu page with a long
press (>2s) of the button (Device FW 1.3.0 and newer). , “Arrow down” (Button
2) , A short press (<2s) lets you switch between sub menu pages of a main menu
item. , A longer press (>2s) lets you use the special functions for that sub
menu item. , “Service Button” (3)
A short press (<2s) activates the edit mode of the settings. A longer press
(>2s) lets you save adjustments to the settings. Lead Seal (4): The service
button (SRVC) is covered by a cover cap after installation. A lead sealing of
this cover secures your device against manipulation from third parties. This
secures all settings from unauthorized manipulation. The current and voltage
supply connectors can be similarly secured. 12
User Manual EMU Professional II Overview Front EMU Professional II
Similar to picture. The following primary elements are on the front panel of
the EMU Professional II.
1. Type Description 2. Active Energy Certification 3. D0 Interface 4.
Operating Key “Arrow right” 5. Operating Key “Arrow down” 6. QR Code with Item
Number and Identification number for measuring devices applying for all
manufactu
rers 7. Number of Phases, Number of Conductors 8. Serial number 9. Class
identification 10. Reference Voltage, Reference Frequency 11. Operating
temperature 12. Current range The front panel also shows the following
secondary element: , The company logo.
13
Overview Laserprint Right
User Manual EMU Professional II
Similar to picture.
The following information is printed on the right side:
1. Meter Constant 2. Connection Diagram 3. Identification number for
measuring devices applying for all manufacturers 4. Firmware and
SoftwareVersion 5. Type Test Certificate 6. PTBA Certificate (only on the LP
version) 7. Mark or Manufacturer Identification with Name and Address 8.
Connection Diagram, Insulation according to protection rating and Meter class
9. Reactive Energy Certificate 10. Load Profile Certificate according to PTBA
50.7 14
Overview Display
User Manual EMU Professional II
Similar to picture. 1. Current Tariff 2. Active Communication Interface 3.
Phase Sequence 4. 4 Quadrant display with 5. , “<<P” : Export Active Energy ,
“P>>” : Import Active Energy 5. 4 Quadrant display with 4. , “<<Q” : Export
Reactive Energy (Inductive) , “Q>>” : Import Reactive Energy (Capacitive) 6.
Measurement / Menu item 7. Sub Menu Item 8. Current Measurement Value 9. Unit
of Current Measurement Value
15
User Manual EMU Professional II
The following table shows and describes all possible symbols that can show on the display.
Symbol
Description
The currently set tariff. The number indicates which tariff. The interface of
the meter is Modbus.
The interface of the meter is TCP/IP. The interface of the meter is MBus. The
interface of the meter is LoRa.
All phases are connected. If one ore more of the numbers are replaced by a “”
then the corresponding phase is not or incorrectly connected.
The meter is currently measuring active energy consumption.
The meter is currently measuring active energy production.
The meter is currently measuring reactive energy consumption (Capacitive).
The meter is currently measuring reactive energy production (Inductive). Only
applies to the LP version of the EMU Professional II. The meter is in a
invalid calibration state. All further measurements by the meter must not be
used for billing purposes.
One or more energy registers have detected a overflow.
Only applies to the LP version of the EMU Professional II. The date and time
of the meter are invalid. Please synchronize the date and time with the
current date and time.
Only applies to the LP version of the EMU Professional II. Date and time on
the meter is not synchronized correctly.
Only applies to the LP version of the EMU Professional II with the ETH
interface. The meter couldn’t synchronize its date and time for at least one
hour.
The internal memory of the meter has a defect. Please create a ticket at
https://www.emuag.ch/en/support2/supportform/.
Compatible Devices
Interfaces:
, MBus , TCP/IP , ModBus RTU, ModBus TCP , LoRa
The EMU Professional II is compatible with the EMU MBus Center and our energy
management software “JoulioWeb” (ISO 50001). You profit from templates for the
meter register configuration of the EMU Professional II as well as an easy
incorporation of your EMU MBus Center and meters into JoulioWeb.
16
User Manual EMU Professional II
Installation
The EMU Professional II is not dependent on location or position. The meter is
designed to fit on 35mm DIN rails (EN 50022) or to be installed with a front
installation frame. To remove the meter from a DINrail just pull the spring
loaded bolt on the underside. The meter weighs about 400g. To ensure most
efficient installation and service of the EMU Professional II meters we
recommend using indirect metering such as EMU Professional II 3/5 meters for
installations where a quick and inexpensive shut down of the installation is
not possible.
Attention: The installation of the meter must be carried out by qualified and
trained personnel. Current transformers must not operate open loop as high
voltages can occur. These voltages can lead to personal and property damage.
DANGER: Make sure that all connected wires are voltage free before you install
/ change or check the meter. Touching any live elements is dangerous to life!
DANGER: The EMU Professional II 3/5 has voltage on the current path! Make sure
that the voltage connections are voltage free before you install the current
transformer. Touching any live elements is dangerous to life!
Attention: According to DIN VDE 0100557, Punkt 5.3.1, the secondary winding of
current transformers must not be grounded in lowvoltageinstallations!
Attention: Only use the intended screw and spring clamps to connect your
meter. It is recommended to use end sleeves.
Attention: Nonobservance of mounting and installation instructions may lead to
damage or destruction of this meter. Please keep to the instructions.
17
User Manual EMU Professional II
Technical Data
Property Active Energy Reactive Energy Supply Voltage Max Current Initial
Current Frequency Internal Consumption Current and Voltage connectors Tariff
Change Repeated adjustments of current transformer Voltage Transformer
Display
S0 Pulse Output
MBus
Modbus RTU Optional Data Interfaces Optical (IR) D0Interface Security of Data
Clock Installation
Housing
18
Value
Class B (1%) according to EN504703 Direct connection meter Class B (1%)
according to EN504703 Converter counter Class 2 (2%) according to EN62053 LL:
400VAC +/ 20% LN: 230VAC +/ 20% Direct connection meter: 100A Converter
counter: 5A Direct connection meter <9mA at cosphi 1 Converter counter <1mA at
cosphi 1 Nominal frequency: 50Hz, 60Hz on demand Critical frequency: 40 65Hz
Voltage route 0.8VA / 0.8W per phase Current route of Converter counter 0.03VA
per phase Direct connection meter: 1.525mm2, Torque: 2Nm, max. 3Nm Converter
counter: 116mm2, Torque: 1Nm, max. 3Nm 230VAC Current transformer /5 A 5/5 A
up to 20’000/5 A in 5 Asteps Current transformer /1 A 1/1 A up to 4’000/1 A in
1 Asteps On the transformerconnected meter EMU Professional II 3/5 the voltage
transformation can be configured. LCDisplay 8digit with one decimal place
1234567,8 kWh Graphical LCD with backlighting (LxW) 38x28mm Norm EN6205331
Output is potential free Pulse rate per kWh 1, 10, 100, 1000 und 10000 imp/kWh
Pulse length 2ms, 10ms, 30ms, 40ms und 120ms Pulse rate and length adjustable
on the meter Norm EN137572, 3 Current consumption 1.5mA, one standard load
Connector diameter 0.52.5mm2 Secondary address 8digit 0000000099999999
Primary address 0 to 250 Baud rate: 300, 600, 1’200, 2’400, 4’800 and 9’600
Baud Configuration via buttons or the EMU MBConnect Software Readout data
configurable via EMU MBConnect Software RS485 Connector diameter 0.52.5mm2,
Configuration via buttons MBus Modbus RTU/ Modbus TCP TCP/IP: Webserver,
httpget API LoRa EN 6205621 Deadvoltage on the Up Flash or Eeprom, Minimum 10
years Optional: IOTA Tangle (Blockchain technology) Integrated clock with
options to synchronize via NTP, Modbus, MBus, LoRa (according to the
interface) Not dependent on location and position On 35mm DINrails or with
front installation frame Weight ca. 400g Housing material Polycarbonate,
halogen free, recyclable Connectors safety class IP20, Housing safety class IP
51 Protection class II Physical dimensions (LxWxD) 90x91x72mm
User Manual EMU Professional II
Continuation of technical data
Property
Value
Certificates
Environmental Conditions
Final inspection certificate Frequency independent measurement at 2 kHz up to
150 kHz
CE and MID B + D PTBA 20.1 and PTBA 50.7 Suitable for energy management
according to ISO 50001
Mechanical: M2 Electromechanical: E2 Temperature operation: 25 °C to + 55 °C
Temperature storage: 30 °C to + 70 °C Relative humidity: yearly avg. 75%,
short term 90%, noncondensing
CHMI00313022 CHMI00313025 DE MTP 21 B 002 M
According to CLC/FprTR 50579:2012
19
User Manual EMU Professional II
Commissioning / Checkup
Note: To check before operation: , Phase rotation , Current per phase,
Negative energy direction , Sequence of phase (L1 L2 L3) , Current Transformer
ratio , Terminal tightening torque , Readout interface: Correct address The
EMU Professional II is to be used exclusively to measure electrical energies
and must not be operated outside the specified technical limits.
Settings ex Factory
S0 Output : Active Energy Import (Pin 6 + 7) Highly robust Opto Power MOSFET:
560VAC oder VDC Current transformer meter: 10 Impulse / kWh Direct meter:
1000 Impulse / kWh
Measurements
20
User Manual EMU Professional II Connection Diagram Direct Meter
The direct meter taps the voltage of the phases internally. Connect the
neutral conductor to the “N” clamp.
Pay special heed to the arrows on the connection clamps of the meter. “Lx” is
always on the grid side, “Lx” always on the installation side.
Note: Connect the meter according to the instructions even if the meter only
ever measures exported energy! The EMU Professional II measures import as well
as export correctly.
The following table shows the most important characteristics of the direct
connections:
Ist
Imin Itr
Iref Imax
0.02A 0.15A 0.5A 5A 100A
DANGER: Make sure that all connected wires are voltage free before you check or change any connec tions. Touching any live elements is dangerous to life!
21
User Manual EMU Professional II Connection Diagram Converter Counter
The EMU Professional II converter counter needs an external voltage tap.
Connect this voltage tap to the corresponding “Lx”. Connect the neutral
conductor to the “N” clamp.
Pay special heed to the arrows on the connection clamps of the meter. “S1” is
always on the grid side, “S2” always on the installation side.
Note: Connect the meter according to the instructions even if the meter only ever measures exported energy! The EMU Professional II measures import as well as export correctly.
Attention: Due to the voltage on the current path on the EMU Professional II 3/5 any connected current transformers must not be grounded!
Attention: The two connector clamps between “S2” of phase 3 and the neutral conductor are for future functions. Do not connect anything to these clamps. Incorrect connection of these two clamps can lead to severe damage to the meter.
DANGER: The EMU Professional II 3/5 has voltage on the current path! Make sure
that the voltage connections are voltage free before you install the current
transformer. Touching any live elements is dangerous to life!
The following table shows the most important characteristics of the converter
connections:
Ist Imin Itr Iref Imax
Current /5A
0.005A 0.05A 0.25A 5A 5A
Current /1A
0.001A 0.01A 0.05A 1A 1A
DANGER: Make sure that all connected wires are voltage free before you check
or change any connec tions. Touching any live elements is dangerous to life!
22
User Manual EMU Professional II
Tightening Torque
Net Supply L1/L2/L3 Supply N
Direct connections up to 35mm2 strand
23Nm 23Nm
Converter connections up to 6mm2 strand
1.3 1.6Nm 1.3 1.6Nm
Note: It is recommended to use end sleeves. Note: The signal outputs have springcage clamps.
SpringCage Clamps Wire Diameter
Connection
S0 pulse output Tariff control MBus/Modbus
Diameter 1.5mm2 strand 1.5mm2 strand 1.5mm2 strand
Stripping
10 mm 10 mm 10 mm
Cable Requirements for Direct Connections >65A
, Type: Wire (Cu) , Crosssection: 35mm² , Diameter (with insulation): 9,55 mm
, Example: ENumber 105502800, available from Swiss electrical wholesale
23
User Manual EMU Professional II
Operation
This chapter explains the navigation through the different menu and sub menu
pages.
Main Menu Pages
When you connect the EMU Professional II to a supply voltage for the first
time, a “TEST DISPLAY TEST” is shown. After ca. 2 seconds the main menu page
“Active Energy Import” is displayed.
Every press of the “Arrow Right” button switches to the next main menu page in
a closed loop as follows: Test Display > Active Energy Import > Reactive
Energy Import > Active Energy Export > Reactive Energy Export > Active Power >
Reactive Power > Apparent Power > Current > Voltage LN > Voltage LL > Power
Factor > Frequency > Load Profile > Logbook > Settings > Test Display > … A
longer press (>2s) of the “Arrow right” button lets you go back to the
previous page. (FW version 1.3.0 and newer)
Note: Depending on your meter configuration one or more of these main menu
pages do not show up. Please consult the picture above for more information.
24
User Manual EMU Professional II
Sub Menu Pages
A list of all sub menu pages follows.
Energy
The main menu pages “Active Energy Import / Export” and “Reactive Energy
Import / Export” display by default the total Import / Export of the
corresponding energy. By default the following diagram applies for their sub
menu pages:
Note: It is possible to adjust these displays. Please consult the chapter
Settings for the Display.
The EMU Professional II features an autorange function to guarantee a energy
value display as precice as possible. Once the display overflows, a “OF” flag
is set on the display. If this flag is set, the display reading that
overflowed starts again from zero. Keep in mind that the registers in the
background overflow much later (ca. 18 Bn. GWh) than the display (99 Mio.
MWh). You can still readout the correct measurements over the interfaces. The
display shows the energy readings as follows:
Meter count [Wh] Range
1 10 100 11000 101000 1001000 1 ° 106 10 ° 106 100 ° 106 1 ° 109 10 ° 109
100 ° 109
1 ° 1012
Divider (prescaler)
100 100 100 100 100 100 100 100 100 100 1’000
10’000
100’000
Divider (decimal digit)
10 10 10 10 10 10 10 10 10 10 1’000
100
10
Display Range Start
0.0 0.0 0.1 1.0 10.0 100.0 1000.0 10000.0 100000.0 1000000.0 10000.000
Display Range End
0.0 0.0 0.9 9.9 99.9 999.9 9999.9 99999.9 999999.9 9999999.9 99999.999
100000.00 999999.99
1000000.0 9999999.9
Unit
kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh MWh
MWh
MWh
Change
3 decimal places Unit 2 decimal places 1 decimal place
25
User Manual EMU Professional II
Meter count [Wh] Range 10 ° 1012
100 ° 1012
Divider (prescaler)
1’000’000
Divider (decimal digit)
1
1 ° 1015 10 ° 1015 100 ° 1015 1 ° 1018 10 ° 1018
Display Range Start
10000000
Display Range End
99999999
Overflow display
Overflow display
Overflow display Overflow display Overflow display Overflow display Overflow counter
Overflow display Overflow display Overflow display Overflow display Overflow counter
Unit MWh MWh
MWh MWh MWh MWh MWh
Change no decimal places Overflow display, REstart at 0
Overflow counter
Maximal Value: 18’446’744’073’709’600’000 Wh = 18’446,7 PWh
Power and Current
The main menu pages of “Active / Reactive / Apparent power” display the total
current power consumption. Pressing the “Arrow Down” button lets you change
the display to the power consumption on individual phases. The main menu pages
“Current” displays the total current for all 3 phases. Pressing the “Arrow
Down” button lets you change the display to the current of individual phases.
26
User Manual EMU Professional II
Voltage, Power Factor and Frequency
If your EMU Professional II energy meter is configured with momentary values a
short press (<1s) of the “Arrow down” button lets you browse the maximal and
minimal values of the corresponding measurements. The time and date when those
values were recorded are stored as well.
Load Profile and Logbook
A short press (<1s) on the “Arrow Down” button lets you browse the saved load
profiles and logbook entries. The entries always start with the latest entry.
A longer press (>1s) of the “Arrow Down” button lets you change between import
and export for the load profiles and between the adjustment and the meter
readings at the time of the adjustment for the logbook page.
27
Settings
User Manual EMU Professional II
Every press of the “Arrow Down” button changes the sub menu item according to
the arrows in the chart above and where no arrows are, from top to bottom.
A short press on the “SRVC” button (<2s) unlocks the current parameter for
editing purposes. The parameter or the currently focused cursor position
starts to blink.
A short press on the “Arrow Right” button moves the cursor one digit to the
right. If you reach the end of the line, the cursor jumps back to the first
digit.
Increment the chosen digit or parameter with a press of the “Arrow Down”
button.
Another short press on the “SRVC” button (<2s) lets you leave the edit mode of
this parameter, discarding any changes made.
A long press on the “SRVC” button (>2s) saves the edited parameter and exits
the editing mode automatically. The successful save is acknowledged with a
short blinking of the LED backlighting.
Color coding of the flow chart:
28
User Manual EMU Professional II
, Turquoise: These settings are only available on the converter counter. ,
Blue: These settings are available on all versions of the EMU Professional II
energy meter. , Yellow: Energy meters with the MBus Interface have these
interfacespecific settings. , Green: Energy meters with the TCP/IP Interface
have these interfacespecific settings. , Orange: Energy meters with the LoRa
Interface have these interfacespecific settings. , Dark Grey: These settings
are not available on any LP versions of the EMU Professional II. , Light
Green: These settings are only available on meters with optional momentary
values.
Note: MID firmware version and checksum are stored in the settings under “SW
Version” and accessible by pressing the “Arrow Down” button for more than 2
seconds while on that menu page.
29
User Manual EMU Professional II
Configuration Settings
Tariff Change
A newly set tariff activates immediately.
The tariffsignal is a AC voltage of 230VAC between NE (Clamp 11) and E2 (Clamp
9)/E1(Clamp 10). Tariffs can be set according to the following truth table.
“0” means 0VAC and “1” means 230VAC.
E2 (Clamp 9)
0 0 1 1
E1 (Clamp 10)
0 1 0 1
NE (Clamp 11)
0 0 0 0
Tariff
1 2 3 4
Tariff 1 is set ex factory. The tariff inputs are internally electrically
isolated through optocouplers.
Note: A change of tariff on the LP version of the EMU Professional II is not
set until the start of the next load profile interval. A tariff set at the
beginning of an interval is set for at least the duration of this interval.
Set Number of Tariffs
Set the number of tariffs in the settings. Choose between a tworate tariff (2)
and a four tariff system (4). , “Arrow right” to settings , “Arrow down” to
Number of Tariffs , Press “SRVC” button (<2 seconds) , “Arrow down” changes
between 2 and 4 tariff operation , Save: Press “SRVC” button (>2 seconds)
until the LCD flashes Note: All pictures in this documentation show only 2
tariffs. The display navigation functions the same with
4 tariffs as with 2 tariffs.
30
User Manual EMU Professional II
Real Time Clock (RTC)
The real time clock of the EMU Professional II can be set directly on the
energy meter or over optional interfaces. The TCP/IP interface allows for a
connection to a time server which allows the meter to synchronize itself. The
EMU Professional II has an internal clock with a daily deviation of 0.4
seconds. The LP Version of the EMU Professional II has special notifications
based on the RTC that can pop up on the display. For more information on the
LP version of the EMU Professional II please consult the PTBA 50.7 specific
chapter at the end of this user manual.
Configuration on the Device
The realtime clock can be set directly on the EMU Professional II via the
control buttons. The internal RTC is buffered with a supercap for at least 12
hours while the power is out leading to fewer RTC settings because of
brownouts / blackouts. The meter must be powered on for at least 2 hours
beforehand to charge the supercap.
Note: Make sure to start from the right and edit to the left if you set the
time via the buttons. , “Arrow right” to settings , “Arrow down” to Realtime
Clock , Press “SRVC” button (<2 seconds) , “Arrow right” chooses the digit,
“Arrow down” increments the digit , Save: Press “SRVC” button (>2 seconds)
until the LCD flashes
Configuration over External Interfaces
You can set the time while configuring the MBus via the EMU MBConnect
software.
Automatic Synchronization
Time synchronization on MBus meters happens through a defined command. The
answer entails information about time and date. The meter synchronizes
immediately and sends an “ACK” message back as acknowled gement. The time can
only be set once per record interval. Meters with the TCP/IP Interface can
synchronize themselves if an NTP time server is specified. For the first
synchronization the meter sends timerequests every 12 minutes. After the first
successful synchronization the request interval goes to once every hour.
Note: Projects with the obligatory load profile certification PTBA 50.7: Only
2048 entries for a RTC synchro nization (or transformer ratio adjustment, S0
ratio adjustment or S0 impulse duration adjustment) are possible before the
meter falls into nonvalid state. Transformer ratio adjustments can only be
done once every load profile interval (15 min).
31
User Manual EMU Professional II
Configuration of Transformer Ratio
The transformer ratio can be set directly on the EMU Professional II via the
control buttons. , “Arrow right” to settings , “Arrow down” to CT/VT Ratio ,
Press “SRVC” button (<2 seconds) , “Arrow right” chooses the digit, “Arrow
down” increments the digit , Save: Press “SRVC” button (>2 seconds) until the
LCD flashes
Change the current transformer ratio from 5 / 5A up to 20’000 / 5A in 5 Asteps
and 1 / 1A up to 4’000 / 1A in 1 Asteps. Change the voltage transformer ratio
from 100 / 100V up to 36’000 / 100V in 100Vsteps. A set ratio of 100:1 means
that a primary current of 100A results in a secondary current of 1A on the
meter.
Note: Ensure that this ratio matches your current / voltage transformer.
Note: Projects with the obligatory load profile certification PTBA 50.7: Only
2048 entries for a transformer ratio adjustment (or RTC adjustment, S0 ratio
adjustment or S0 impulse duration adjustment) are possible before the meter
falls into nonvalid state. Transformer ratio adjustments can only be done once
every load profile interval (15 min).
S0 Pulse Ratio
The pulse ratio can be set directly on the EMU Professional II via the control
buttons. , “Arrow right” to settings , “Arrow down” to Pulse Ratio , Press
“SRVC” button (<2 seconds) , “Arrow right” choose between 1, 10, 100, 1000 and
10000 imp/kWh , Save: Press “SRVC” button (>2 seconds) until the LCD flashes
Note: Projects with the obligatory load profile certification PTBA 50.7: Only
2048 entries for a S0 ratio adjustment (or RTC adjustment, transformer ratio
adjustment or S0 impulse duration adjustment) are possible before the meter
falls into nonvalid state. S0 ratio adjustments can only be done once every
load profile interval (15 min).
S0 Impulse Duration
In den Einstellungen kann die Impulsbreite festgelegt werden. Wählen Sie
zwischen 2ms, 10ms, 30ms, 40ms und 120ms.
, “Arrow right” to settings , “Arrow down” to impulse duration , Press “SRVC”
button (<2 seconds) , “Arrow right” choose between 2ms, 10ms, 30ms, 40ms and
120ms , Save: Press “SRVC” button (>2 seconds) until the LCD flashes
Note: Projects with the obligatory load profile certification PTBA 50.7: Only
2048 entries for a S0 impulse duration adjustment (or RTC adjustment,
transformer ratio adjustment or S0 ratio adjustment) are possible before the
meter falls into nonvalid state. S0 impulse duration adjustments can only be
done once every load profile interval (15 min).
32
User Manual EMU Professional II Configuration of the Energy Display
Configure what is shown on the display. You may choose from the following
settings.
Energy per Tariff:
, On: The EMU Professional II displays the imported / exported energy for each
tariff on the main menu pages “Active Energy Import / Export” and “Reactive
Energy Import / Export”.
, Off: The display only shows the total for all tariffs and the chosen setting
for “Energy per Phase”.
Energy per Phase:
, On: The EMU Professional II displays the imported / exported energy for each
phase on the main menu pages “Active Energy Import / Export” and “Reactive
Energy Import / Export”.
, Off: The display only shows the total for all tariffs and the chosen setting
for “Energy per Tariff”.
Overview
Depending on which settings for the energy import / export display are on the
sub menu pages of the energy displays are as follows:
Legend: , Green: Only the option “Energy per Phase” is on , Orange: Only the
option “Energy per Tariff” is on. , Red: Both options are on.
33
User Manual EMU Professional II
Configuration Interfaces
The EMU Professional II can be fit with several interfaces. There is only one interface possible per meter.
Interfaces
The EMU Professional II possesses one of the following optional interfaces:
, MBus , ModBus RTU , TCP/IP mit Modbus TCP/IP , LoRa
Note: A EMU Professional II only ever possesses one of these interfaces.
You can configure your EMU Professional II via different means. One such means
is directly on the meter via the touchsensitive buttons. If you use your EMU
Professional II in conjunction with a EMU MBus Center you can configure the
EMU Professional II via the webuserinterface of the EMU MBus Center.
Note: The meter must be connected via MBus to the EMU MBus Center for this.
MBus
The MBus interface is implemented according to EN 137572,3 (formerly EN14343).
Therefore the EMU Professional II MBus can communicate with all MBus capable
devices. The MBus interface is integrated into the meter and protected from
contamination and manipulation. The interface is located at the back of the
meter on pin 1[3] (+) and pin 2[4] (). Please consult the document “Manual EMU
Professional II MBus”, DocRef 1480 for further information on the MBus
interface of the EMU Professional II.
Settings ex Factory
Setting
Secondary Address Primary Address Baud rate
Value
Serial number of the device 0 2400
Connection Diagram MBus
The EMU Professional II MBus possesses two internally connected MBus clamps.
This facilitates an easier serial connection of multiple MBus devices while
installing.
Note: The MBus interface is the same for the EMU Professional II 3/100 MBus
and the EMU Professional 3/5 MBus. 34
User Manual EMU Professional II
Configuration of the Primary Address on the Device
, “Arrow right” to settings , “Arrow down” to MBus Pri. Address , Press “SRVC”
button (<2 seconds) , “Arrow right” chooses the digit, “Arrow down” increments
the digit , Save: Press “SRVC” button (>2 seconds) until the LCD flashes
Configuration of the Secondary Address on the Device
, “Arrow right” to settings , “Arrow down” to MBus Sec. Address , Press “SRVC”
button (<2 seconds) , “Arrow right” chooses the digit, “Arrow down” increments
the digit , Save: Press “SRVC” button (>2 seconds) until the LCD flashes
Configuration of the Baud Rate on the Device
, “Arrow right” to settings , “Arrow down” to MBus Baud Rate , Press “SRVC”
button (<2 seconds) , “Arrow right” chooses between 300, 600, 1’200, 2’400
(default), 4’800 and 9’600 Baud , Save: Press “SRVC” button (>2 seconds) until
the LCD flashes
Configuration via MBConnect
The EMU Professional II MBus can also be configured over MBus with our own
software MBConnect. For further information on the MBus Interface, as well as
the software MBConnect, please refer to the docu ment “Manual Professional II
MBus” Doc.Ref: 1480.
35
User Manual EMU Professional II
S0 Pulse Output
The S0 Pulse Output follows the Norm EN 6205331 (DIN 83864). Every EMU
Professional II possesses a S0 Pulse Output and is therefore capable to
communicate with any devices that can receive and interpret such pulses. The
Interface is on the backside on pin 6 and pin 7. The internal switch is a
highly robust Opto Power MOSFET 560VAC or VDC.
The S0 Pulse Output is potential free.
Note: Polarity is no issue.
Settings ex Factory
S0 Output
Active Energy Import (Pin 6 + 7)
Converter Counter 10 Pulses per kWh/Kvarh @ 120ms Pulse Duration
Direct Meter
1000 Pulses per kWh/Kvarh @ 40ms Pulse Duration
Connection Diagram S0 Pulse Output
Configuration Type of ReadOut
, “Arrow right” to settings , “Arrow down” to S0 Impulse Type , Press “SRVC”
button (<2 seconds) , “Arrow right” chooses between:
Active Energy Diff All active Energy, either import or export, is output
without differentiating. Reactive Energy Diff All reactive Energy, either
import or export, is output without differentiating. Active Energy Import Only
active energy import is output. All other energies are ignored. Reactive
Energy Import Only reactive energy import is output. All other energies are
ignored. Active Energy Export Only active energy export is output. All other
energies are ignored. Reactive Energy Export Only reactive energy export is
output. All other energies are ignored.
36
User Manual EMU Professional II
, Save: Press “SRVC” button (>2 seconds) until the LCD flashes
Configuration of the Pulse Rate
, “Arrow right” to settings , “Arrow down” to S0 Impulse Ratio , Press “SRVC”
button (<2 seconds) , “Arrow right” chooses between 0.001, 0.01, 0.1, 1, 10,
100, 1000 and 10`000 pulses per kWh/ kvarh , Save: Press “SRVC” button (>2
seconds) until the LCD flashes
Configuration of the Pulse Duration
, “Arrow right” to settings , “Arrow down” to S0 Impulse Duration , Press
“SRVC” button (<2 seconds) , “Arrow right” increases the duration by 2ms
starting from 4ms up to 250ms , Save: Press “SRVC” button (>2 seconds) until
the LCD flashes
Data Available for ReadOut
The S0 Impulse output can be set to the following: , Active Energy Diff All
active Energy, either import or export, is output without differentiating. ,
Reactive Energy Diff All reactive Energy, either import or export, is output
without differentiating. , Active Energy Import Only active energy import is
output. All other energies are ignored. , Reactive Energy Import Only reactive
energy import is output. All other energies are ignored. , Active Energy
Export Only active energy export is output. All other energies are ignored. ,
Reactive Energy Export Only reactive energy export is output. All other
energies are ignored.
TPC/IP
The EMU Professional II TCP/IP is equipped with a 10/100 MBit
EthernetInterface and a RJ45 connector. The energy meter automatically
arranges the best speed with its remote station.
Settings ExFactory
ExFactory the EMU Professional II obtains its IPaddress via a DHCPrequest. The
assigned IPaddress can be read out on the display of the meter under
“Settings” > “IPAddress”. Navigate to “Settings” by pressing the “Arrow right”
button and then use the “Arrow down” button to reach “IPAddress”.
37
Connection Diagram TCP/IP
User Manual EMU Professional II
Configuration and Access
For further details on the EMU Professional II TCP/IP and its configuration
please consult the document “Manual Professional II TCP/IP” Doc.Ref. 1475
ModBus RTU, ModBus TPC/IP
The Professional II Modbus supports communication via Modbus TCP, Modbus RTU
and Modbus ASCII. For further details on the EMU Professional II Modbus and
its configuration please consult the document “Ma nual Professional II Modbus”
Doc.Ref. 1485
LoRa
The EMU Professional II LoRa supports the communication via LoRa.
Ex Factory
The EMU Professional II LoRa sends the following values ex factory: ,
Timestamp , Active Energy Import Tariff 1&2 , Active Energy Export Tariff 1&2
, Error Code
Configuration and Access
For further details on the EMU Professional II Lora and its configuration
please consult the document “Manual Professional II Modbus” Doc.Ref. 1490
38
User Manual EMU Professional II
In Case of Errors
In case you encounter an error on the EMU Professional II please consult the following list of common errors.
Possible Errors after Installation
One or more phase currents show a negative sign: Check if the connections “S1”
and “S2” (“Lx” and “Lx” for the direct meter) of the corresponding phase are
connected correctly. “S1” (“Lx”) is always connected on the grid side,
S2″(“Lx”) always on the user side.
DANGER: Make sure that all connected wires are voltage free before you check or change any connec tions. Touching any live elements is dangerous to life!
Wrong Meter Readings on the Converter Counter
The EMU Professional II displays a way higher consumption than possible:
Please ensure that the current and voltage transformer ratios are set
corresponding to the used transformers. The two ratios can be set on the EMU
Professional II via the two buttons.
5/5 up to 20’000/5 A, in 5 Asteps. 1/1 up to 4’000/1 A, in 1 Asteps.
Behavior with Export and Import
The EMU Professional II records the energy flow in both negative (export) as
well as positive (Import) direction in separate registers. The meter readings
of import or export are never counted down or decreased. All registers are
accumulating.
The register “Active Energy Import” adds up all the imported energy from
external sources. For this energy the customer receives an invoice from the
local utility company. The register “Active Energy Export” adds up all the
exported energy from you own sources (e.g. photovoltaics). For this energy the
customer receives payment from the local utility company.
Practical example:
Current consumption of your complex at 1 pm: Phase L1: 10kw Phase L2: 20kw
Phase L3: 30kw Total ==> 60kw
Current export of your PV installation on this complex at 1 pm: Phase L1: 25kw
Phase L2: 25kw Phase L3: 25kW Total ==> 75kW
In this case you produce more power than your complex needs right now. The
register “Active Energy Import” stays the same while the register “Active
Energy Export” is increasing as you are exporting your surplus energy.
The EMU Professional II Sends Wrong Information on the S0 Interface
Check if the pulse rate and pulse duration of the EMU Professional II
correspond with the ones of your receiver. The pulse rate as well as pulse
duration can be configured via the two buttons. Possible pulse rates /
durations: Pulse rates: 1, 10, 100, 1000 and 10000 Impulse per kWh/kvarh.
Pulse duration: 2ms, 10ms, 30ms, 40ms and 120ms.
The following values are set ex factory:
S0 Output
Active Energy Import (Pin 6 + 7)
Converter Counter 10 Pulses per kWh/Kvarh @ 120ms pulse duration
Direct meter
1000 Pulses per kWh/Kvarh @ 40ms pulse duration
39
User Manual EMU Professional II
Tariff Change Does Not Work
Tariff 1 is set ex factory. Make sure the tariff inputs are connected correctly.
E2 (Pin 9)
0 0 1 1
E1 (Pin 10)
0 1 0 1
Tariff
1 2 3 4
DANGER: Make sure that all connected wires are voltage free before you check or change the tariff connections. Touching any live elements is dangerous to life!
The “L123” Display Constantly Blinks
The “L123” blinks every second, if the phase shift between L1/L2/L3 is not
plus 120 degree. This error happens, when two or more phases are connected
incorrectly. The phase sequence is displayed at the top middle of the LCD.
Ensure that the individual phases are connected correctly.
DANGER: Make sure that all connected wires are voltage free before you check or change the phase connections. Touching any live elements is dangerous to life!
Error Codes
If an internal error occurs an error flag is set on the display. Such an error cannot be removed and the meter can no longer be read out. Should such an error occur please submit a support ticket at https://www.emuag.ch/en/support2/supportform/. Please fill in the exact error code. All possible error codes are shown in the table below.
Error code displayed Description
F.F.0(00000000)
No Error, Meter OK
40
User Manual EMU Professional II
EAxctceonrddeindgIntofoPrmTBatAion50f.o7r Load Profile
Measurement Correctness Note
Auflagen für den Verwender im Sinne des § 23 der Mess und Eichverordnung
Die Mess und Eichverordnung verpflichtet diejenigen, die im Sinne des
Eichrechtes Verwender eines Messge rätes sind, so zu messen und Messgeräte so
zu handhaben, dass die Richtigkeit der Messung gewährleistet ist. Verwender im
Sinne des Eichrechtes unter Berücksichtigung der Regelung von Marktrollen
durch das Mess stellenbetriebsgesetz sind:
, Messgeräteverwender: Messgeräteverwender sind die Messstellenbetreiber im
Sinne des Messstellenbetriebsgesetzes.
, Messwertverwender: Messwertverwender sind die, die im Sinne des
Messstellenbetriebsgesetzes Messung und Mess wertweitergabe an berechtigte
Dritte durchführen, sowie Abrechnung der Netznutzung und Energie lieferung
durchführen.
Die Messgeräteverwender trifft die Aufgabe, den Messwertverwendern die
Möglichkeit zu verschaffen, sich über die nachfolgend erläuterten Auflagen in
Kenntnis zu setzen.
Transparenz der Verwendung
Der Messwertverwender hat für die Stromkunden, bei denen die Geräte verwendet
werden, das Zustande kommen der in Rechnung gestellten Arbeits und ggf.
Leistungswerte transparent zu machen. “Transparent machen” heißt, durch
Information die Voraussetzungen für die Stromkunden schaffen, um unter
Zuhilfenahme eichrechtkonformer Anzeigen der bei ihnen verwendeten Geräte das
Zustandekommen der Rechnungsposten in der Stromrechnung nachvollziehen zu
können. Insbesondere ist dabei auch darüber zu informieren,
, Welche der von den Geräten angezeigten Werte überhaupt für
Verrechnungszwecke herangezogen wer den dürfen,
, Dass nicht angezeigte Werte nicht für Verrechnungszwecke verwendbar sind und
dass angezeigte Wer te, die Ergebnisse von nicht eichrechtlich relevanten
Funktionen sind, rein informativen Charakter haben und ebenfalls nicht für
Verrechnungszwecke verwendet werden können. Die Messgeräte müssen im Üb rigen
so verwendet werden, dass die Ablesbarkeit der verrechnungsrelevanten
Messergebnisse und der Fehlermeldungen auch für die Stromkunden gegeben ist.
Tarifierung
Für die eichrechtskonforme Verwendung der Zählerstandsgänge können nur die
Tarife T1 und T2 verwendet werden. Dabei ist der § 33 MessEG zu beachten:
Diesbezüglich hat der Messwertverwender dafür zu sorgen, dass Rechnungen,
soweit sie auf Messwerten be ruhen, von demjenigen, für den die Rechnungen
bestimmt sind, in einfacher Weise zur Überprüfung angege bener Messwerte
nachvollzogen werden können und für diesen genannten Zweck falls erforderlich
geeignete Hilfsmittel bereitzustellen. Es muss immer sichergestellt werden,
dass alle Register welche zur Abrechnung verwendet werden auch am Display
angezeigt werden.
41
User Manual EMU Professional II
Fehlermeldungen/Uhrzeitverstellungen
Fehlermeldungen: In den Begleitdokumenten werden die GeräteFunktionsfehler
beschrieben, die die hier genannten Zähler selbst diagnostizieren und anzeigen
können. Bei Auftreten eines oder mehrerer der als ,,Eichrechtlich relevante
Feh lermeldungen” bezeichneten Ereignisse ist die eichrechtkonforme Verwendung
nicht mehr gewährleistet und die gespeicherten Messergebnisse sind als dubios
anzusehen. Die Geräte müssen ausgebaut, nötigenfalls repariert und geeicht
werden, wenn sie weiterhin für Verrechnungszwecke verwendet werden sollen.
Uhrzeitverstellung: Bei Zählern mit über Fernsteuerung veränderbarer, interner
Uhr muss durch technische Maßnahmen sicher gestellt werden, dass am Zähler
über eichrechtkonforme Anzeigen nachprüfbar ist, ob die Mess und Abrech
nungsrichtigkeit beeinflussende Verstellung der Uhr während eines
Abrechnungszeitraumes erfolgt sind. Bei den hier genannten Zählern wird das
wie folgt erreicht: Ein Kommando zum Verstellen der Zähleruhr über eine der
vorhandenen Schnittstellen führt immer zu einem Eintrag in das eichtechnische
Logbuch. Die aktuelle Registrierperiode nach dem Zeitpunkt der Uhrverstellung
wird ungültig markiert. Die mit dem Uhrzeitverstellen neu begonnene
Registrierperiode endet beim nächsten ganzzahligen Vielfachen der
Registrierperiodenlänge (bei x Uhr 15, 30, 45 oder 00) basierend auf der neu
eingestellten Zählerzeit.
Verwendung der Kommunikationsschnittstellen
Die Kommunikationsschnittstellen der Zähler sind nicht eichrechtskonform. Über
sie ausgelesene Messwerte der hier zuzulassenden Zähler können nur insoweit
für Verrechnungszwecke verwendet werden, wie es sich gemäß Anlage 2, Abschnitt
8.1 der Mess und Eichverordnung um eine unveränderte Wiederholung der im
Display der hier zuzulassenden Zähler angezeigten Messergebnisse handelt.
Zeitsynchronisierung
Die hier genannten Zähler synchronisieren sich über die vorhandene
Kommunikationsschnittstelle. Für eine eichrechtkonforme Verwendung der
Zählerstandsgänge muss der Verwender sicherstellen, dass die Uhrzeit des
Zählers auf die gesetzliche Zeit synchronisiert wird. Bei den hier
zuzulassenden Zählern müssen folgende Voraussetzungen erfüllt sein, bevor das
Datentelegramm mit Datum und Uhrzeit gesendet wird:
, Der MBus muss zur Kommunikation frei sein , Die Sekunden der aktuellen
Uhrzeit müssen bei 00 sein (das Telegramm darf nur zur vollen Minute über
tragen werden) , Als Zeitquelle muss die gesetzliche Zeit verwendet werden
Können die Voraussetzungen nicht erfüllt werden, dürfen die Zählerstandsgänge
nicht für abrechnungsrele vante Zwecke verwendet werden.
Messergebnisse, die nicht für Verrechnungszwecke verwendet werden dürfen
Messwerte anderer als der in der Baumusterprüfbescheinigung genannten
Messgrößen dürfen nicht für Ver rechnungszwecke verwendet werden.
Logbuchfunktion
Die hier genannten Zähler verfügen immer über ein eichtechnisches Logbuch, das
nur unter Verletzung einer herstellerseitigen Zugriffsicherung gelöscht werden
kann.
EMU Professional II
The following chapter describes the menu items relevant to the load profile in
greater detail. The load profile of the EMU Professional II is certified for
PTBA 50.7.
42
User Manual EMU Professional II
CT Ratio and VT Ratio
These ratios set the applied factor while measuring the energy and must be set
according to the used current and/or voltage transformers. The adjustment of
these ratios is only possible using the SRVC button. The SRVC button can be
sealed with a lead seal.
Real Time Clock
The real time clock (RTC) displays the currently valid time of the device. We
recommend setting the RTC to UTC as the meter does not support timezones and
daylightsaving time.The adjustment of the real time clock is only possible
using the SRVC button. The SRVC button can be sealed with a lead seal.
S0 Impulse Output
The S0 Impulse output can be set to the following:
, Active Energy Diff All active Energy, either import or export, is output
without differentiating. , Reactive Energy Diff All reactive Energy, either
import or export, is output without differentiating. , Active Energy Import
Only active energy import is output. All other energies are ignored. ,
Reactive Energy Import Only reactive energy import is output. All other
energies are ignored. , Active Energy Export Only active energy export is
output. All other energies are ignored. , Reactive Energy Export Only reactive
energy export is output. All other energies are ignored.
The interface outputs an electrical pulse per set energy unit. The interface
can be configured as follows:
, Impulse ratio: Set the amount of pulses per unit of energy measured. ,
Impulse length: Set the length of the pulse.
Use for Billing Purposes
The LP version of the EMU Professional II is only certified for billing
purposes of active energy measurements. These measurements can be accessed at
any time over the display or the meter’s interface All other measurements are
purely of an informative nature and may not be used for billing purposes. All
measurements not shown on the display but retrievable over an interface are of
a purely informative nature as well and may not be used for billing purposes.
Description
The load profile functionality according to PTBA 50.7 consists of 2 separate
functionalities:
, The load profile storage for the recording of measurements.
This storage space is a ring buffer. After reaching the maximum possible
entries, the oldest 27 entries are deleted and overwritten. This overwriting
happens in batches of 27 entries due to technical factors.
, The logbook storage (official calibration certified logbook) for the
recording of changed made to the para meters relevant for the load profile.
The logbook cannot be tampered with without destroying the adhesive seal
labels. The changes that are recorded are the following: Adjustment of time
and date , An adjustment of time and date is defined as follows: The
difference between old and new time is more than 9 seconds. If the difference
is smaller than 9 seconds, the adjustment is interpreted as automatic time
synchronization and will therefore not be recorded. Adjustment of voltage of
current transformation ratio. Adjustment of S0 impulse ratio, S0 impulse
duration
43
User Manual EMU Professional II
Each of the values mentioned above can only be adjusted once in every
measurement interval. The next change can only be made in the next interval.
Internal memory only suffices for 2048 logbook entries. These entries can
neither be deleted nor overwritten. Once this logbook memory is depleted the
meter goes into the “not certified” status if one of the parameters mentioned
above is changed again. Once this status is set, a “PTB NV” message is shown
on the display. All measured load profiles after this setting are marked as
“NV” (Not valid).
Note: This “NV”Status of the meter cannot be reversed in any way due to legal
restrictions.
Interval of Recording
The interval for recording load profiles is fixed at every 15 minutes and
cannot be changed.
Time Synchronization
Synchronizing of the time may be done over a predefined command over the
MBus/TCPIP interface. The data sent includes time and date. The
synchronization is immediate and is acknowledged by the meter with a “ACK”
message. The time can be synchronized or set only once every measurement
interval (15min). The time set must be the legal time. An internal buffer
supplies the RTC for at least 18 days (The meter needs to be powered for at
least 2 hours to charge this buffer). The EMU Professional II LP
differentiates between the following two time adjustments:
, Synchronization: If the difference between old and new time is less than 9
seconds (1% of load profile interval) the meter sets the new time without
generating a logbook entry.
, Time set: If the difference is more than 9 seconds the time change will not
count as a regular synchroniz ation and will generate a logbook entry.
Note: The EMU Professional II operates with internal timestamps therefore it
knows if more than 2 weeks have passed since the last synchronization even if
it is powered down for more than 2 weeks (but less than 18 days). The
notifications TNV, TNS or NTP can appear on the display. The following diagram
explains when and why they appear and the consequences:
44
User Manual EMU Professional II
Note: According to the PTBA 50.7 Certificate the time must be synchronized at
least once every 2 weeks. If no synchronization occurs within these 2 weeks
all load profiles after these 2 weeks are marked as “NV” until the next
synchronization occurs. The message “TNS” is displayed.
Note: Ex Factory the internal buffer for the RTC is not charged. 45
User Manual EMU Professional II
Tariff Changes
A change of tariff on the LP version is set at the beginning of the next
interval. A tariff is therefore always set for at least one interval period.
For the LP version only the tworate tariff is available.
Note: It is possible for a wrong tariff to be displayed after a power failure.
The first load profile is set as “NV” regardless and the correct tariff is set
correctly at the start of the next interval according to the tariff inputs
NE,E1 and E2.
Note: For load profile measurements according to PTBA 50.7 the tworate tariff
is mandatory. Tariff chan ges are set at the start of the next regular
interval.
External Readout over Interfaces
Readout over external interfaces can be used for billing purposes. The
interfaces send the same information as is shown on the display.
Memory Capacity
The internal memory capacity can store:
, Continual entries for the load profile: 105378 With a save interval of 15
minutes this memory capacity can store load profiles reaching back approx. 3
years. Once the last entry is stored the memory handler deletes the first 27
entries and jumps back to the first entry. Once all 27 entries are filled
again, the next 27 entries are deleted. This means only the newest 105351 load
profile entries are available and older ones are deleted.
, Logbook entries: 2048 Each adjustment of the current or voltage ratio, the
real time clock or the S0 interface results in an entry into the logbook. Once
all 2048 entries are used the meter sets all load profiles after the next
change to one of the above factors to “NV” according to PTBA 50.7. A meter in
this status must be replaced.
Power Failure and Reboot
Power Failure All load profiles are saved and stored in a fixed 15minute
interval e.g. XX:00, XX:15, XX:30 and XX:45. After a power failure, the normal
interval continues. An Example:
, Current time: 07:37 => last load profile entry was at 07:30 , Power failure
until 08:12 , Next entry happens on schedule at 08:15 (This entry is marked
“NV” automatically) , The entries for 07:45 and 08:00 are missing.
After every power failure the first load profile is marked as “NV”. In case
the internal buffer for the RTC sustained the meter through the power failure
all further entries are not marked “NV”. Reboot In some instances an internal
meter reboot may ocurr. In these cases the corresponding load profile entry is
marked with “NV”.
46
Display Load Profile
User Manual EMU Professional II
The load profile menu always shows the latest entry on call up. Once all
110’457 entries are full, the EMU Professional II automatically deletes the
oldest entry. The numeration of the load profiles however does not jump back
to 0 but continues as if nothing happened.
Example: Your EMU Professional has already saved 200’000 load profiles. If you
go through the list of load profiles you will start with load profile nr.
200’000. If you go back 105’378 entries you will jump back to load profile nr.
200’000. The data for load profile nr. 194’622 has been overwritten.
The following information is shown on the display:
000006: Index of the shown entry. The first entry has index 1 and the button
“Arrow Down” lets you go through all stored load profiles (chronologically
descending).
01.01.2021 01:30:55: Time stamp of the entry. Current time and date. This is
the time the device had on the internal clock at the time of saving. There is
no internal differentiation of timezones. The time is always in UTC.
NV: Validity flag. The following situations result in a load profile being
marked with “NV”:
, If any of the above mentioned device parameters are adjusted, the load
profile of that time interval is marked with “NV”
, The first entry after the startup of the meter is always marked as “NV”.
This is due to the assumption that the startup happens because of a prior
power fail.
, If a time synchronization does not happen within 2 weeks of the last one,
all entries after these 2 weeks are marked “NV”.
Valid entries do not have any markings.
T1/T2 00000000.0 kWh: Meter reading per tariff. Value of the active energy
register at the time of the entry.
Note: For load profiles according to PTBA 50.7 only a tworate tariff is
available. Tariff changes are set at the start of the next interval.
Imp/Exp: Change between import and export register. A long (>1s) press on the
“Arrow Down” button lets you change between import and export data.
Display Logbook
The logbook always shows the latest entry on call up. The following
information are shown on the display:
47
In Case of a Time Adjustment
User Manual EMU Professional II
001/070: Index of the current entry. The entries start with 1 and can be
browsed by pushing the “Arrow Down” button (chronologically descending).
01.01.2000 00:06:37: Valid time up until now. This also corresponds to the
time of adjustment.
05.01.2021 10:40:00: Newly set time.
A short press (<1s) on the “Arrow Down” button lets you browse the saved
logbook entries. The entries always start with the latest entry.
A longer press (>1s) of the “Arrow Down” button lets you see the meter
readings at the time of adjustment (Import and Export).
In Case of a Ratio Adjustment
003/070: Index of the current entry. The entries start with 1 and can be
browsed by pushing the “Arrow Down” button (chronologically descending).
05.01.2021 11:35:24: Time of the adjustment.
VT 5:5 > 150:5: Old factor and new factor.
A short press (<1s) on the “Arrow Down” button lets you browse the saved
logbook entries. The entries always start with the latest entry.
A longer press (>1s) of the “Arrow Down” button lets you see the meter
readings at the time of adjustment (Import and Export).
48
User Manual EMU Professional II
In Case of a Impulse Duration Adjustment
002/070: Index of the current entry. The entries start with 1 and can be
browsed by pushing the “Arrow Down” button (chronologically descending).
05.01.2021 11:35:24: Time of the adjustment. S0 IDur. 2 > 10: Old factor and
new duration in ms. A short press (<1s) on the “Arrow Down” button lets you
browse the saved logbook entries. The entries always start with the latest
entry. A longer press (>1s) of the “Arrow Down” button lets you see the meter
readings at the time of adjustment (Import and Export).
In Case of a Impulse Rate Adjustment
006/070: Index of the current entry. The entries start with 1 and can be
browsed by pushing the “Arrow Down” button (chronologically descending).
05.01.2021 11:35:24: Time of the adjustment. S0 IRat. 10000 > 10: Old ratio
and new ratio in Imp/kWh A short press (<1s) on the “Arrow Down” button lets
you browse the saved logbook entries. The entries always start with the latest
entry. A longer press (>1s) of the “Arrow Down” button lets you see the meter
readings at the time of adjustment (Import and Export).
49
EMU Electronic AG Jöchlerweg 2 CH6340 Baar Switzerland
Phone: +41 (0)41 545 03 00
helpdesk@emuag.ch www.emuag.ch
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>