GEOTAB EPO10 IOX-WRKS Integration Cable Installation Guide
- June 13, 2024
- Geotab
Table of Contents
Field Services Installer Documentation:
Rasco EPO10 + IOX-WRKS
IOX-WRKS
EPO10 IOX-WRKS Integration Cable
Notice: Always use winter input mapping for telemetries
AUX5- Belly Plow or Manual Spreader, AUX6- Front Plow, AUX7- Wing Plow, AUX8-
Tow Plow or Beacon
Required Controller settings
- Rasco EPO 10 requires protocol EN 15430-1
- Rotate center dial to the right to obtain “Rasco” selection
- Press “check” button, enter passcode ( 727) using the three dials, press checkmark again.
- Select the menu button, then Executive settings, Option settings, then Mobile box.
- Ensure baud rate is set to 115200
- Exit to main operator screen
- Press “test” to enter SIM mode, use up/down arrows to increase / decrease speed.
- Confirm data flow using MyGeotab or calling support.
- Exit SIM mode when complete.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>