TTCOMBAT TTSCW-SFU-162 Wastestation Instruction Manual

June 13, 2024
TTCOMBAT

TTCOMBAT TTSCW-SFU-162 Waste station

TTCOMBAT-TTSCW-SFU-162-Wastestation-product

Product Information

The TTSCW-SFU-162 Waste station is a versatile and durable product designed for waste management purposes. It features a modular assembly system that allows for easy customization and expansion. The product includes various parts and components that can be assembled to create a functional waste station.

Product Usage Instructions

Before starting the assembly process, please ensure that you have read and understood the user manual completely.

  1. Begin by carefully unpacking all the components of the TTSCW-SFU-162 Waste station.
  2. Refer to the provided icons throughout the instructions for assistance during the assembly process.
  3. Do not use glue on any part of the waste station unless specifically instructed to do so.
  4. For parts that need to be folded, carefully score and fold them as indicated.
  5. Note that some parts or their placement may be optional, depending on your specific requirements.
  6. Pay close attention to each step and ensure that the process order and parts used are followed correctly.
  7. If instructed, repeat the process of making a particular part the specified number of times.
  8. Occasionally, the next instruction step may be the same assembly as before but from a different angle.
  9. Once a sub-assembly is complete, it is ready to be added to the main kit.
  10. Continue following the instructions until the entire assembly is complete.
  11. Be aware that there might be additional optional parts that can be added, so check the instructions thoroughly.
  12. Handle any bendy wood parts with care, as they are designed to curve around a specific frame only.
  13. Ensure that all crates are pushed in and down to lock them into place. Gluing is not necessary.
  14. Once the waste station is fully assembled, it is ready to be used for waste management purposes.

Please note that the above instructions are a summary. For detailed step-by- step guidance, refer to the complete user manual provided with the TTSCW- SFU-162 Wastestation.

Instruction

These are a series of icons that may be used throughout the instructions to help your assembly. If in doubt, scroll ahead to confirm.

TTCOMBAT-TTSCW-SFU-162-Wastestation- \(1\)

  • Do not glue this part

  • Carefully score and fold this part

  • This part – or its placement is completely optional
    TTCOMBAT-TTSCW-SFU-162-Wastestation- \(2\)

  • Look closely at this step – The process order or part used, may be specific

  • Repeat making this part the specified number of times

  • The next instruction step will be the same assembly so far, but from a different angle
    TTCOMBAT-TTSCW-SFU-162-Wastestation- \(3\)

  • Sub-assembly complete. This smaller construction is ready to add to the main kit

  • Assembly Complete! There could be more optional parts – check to the very end of instructions

  • FRAGILE: DO NOT BEND. “Bendy wood” is designed to curve around a designed frame only.

Installation instruction

TTCOMBAT-TTSCW-SFU-162-Wastestation- \(4\) TTCOMBAT-
TTSCW-SFU-162-Wastestation- \(5\)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals