SUSSEX CMDSRH Calibre Mixer Diverter System RH Dress Kit Calibre Basin Mixer Installation Guide

June 13, 2024
SUSSEX

SUSSEX CMDSRH Calibre Mixer Diverter System RH Dress Kit Calibre Basin

Mixer

SUSSEX-CMDSRH-Calibre-Mixer-Diverter-System-RH-Dress-Kit-Calibre-Basin-
Mixer-product

Product Information

The Calibre Mixer Diverter System RH Dress Kit (Product code: CMDSRH) is a plumbing accessory designed for use with the Calibre Mixer Diverter System RH. It includes a mixer dress kit and a diverter dress kit.

Mixer Dress Kit:

  • Removes the protective cover from the mixer.
  • Seals the wall surface around the mixer using silicone.
  • Applies a small amount of silicone to the rear of the backplate before mounting it onto the wall.
  • Fits the handle body onto the mixer cartridge lever, ensuring the handle is fully engaged.
  • Secures the handle body by tightening the set screw using the provided Allen Key.

Diverter Dress Kit:

  • Allows the user to rotate the handle to direct the water flow to the chosen outlet.

Product Usage Instructions

Mixer Dress Kit:

  1. Remove the protective cover from the mixer.
  2. Using silicone, seal the wall surface around the mixer.
  3. Apply a small amount of silicone to the rear of the backplate before mounting it onto the wall.
  4. Fit the handle body onto the mixer cartridge lever, ensuring the handle is fully engaged.
  5. Secure the handle body by tightening the set screw using the provided Allen Key. Tighten well.

Diverter Dress Kit:

Note: The diverter is of the dial type, rotate handle to direct the water flow to the chosen outlet.

Rough-in Plumbing:

  1. Prior to installing, calculate the finished wall thickness. The maximum thickness is 30mm. Contact the manufacturer for further options if the wall thickness exceeds 30mm.
  2. If the wall thickness is greater than 30mm, contact the manufacturer for further options.
  3. Prepare a nogging to be fixed parallel between the wall studs.
  4. The nogging must be fitted to enable the base of the Masterfit to be 30-32mm back from the stud face.
  5. The Masterfit will be marked “This side up” to indicate orientation.
  6. Using the provided screws (x4), mount the Masterfit to the nogging. Ensure it is level and square.

Plumber Note:

  • Conduct on-site high pressure line testing with the mixer in the closed position (static test only).
  • Do not open the mixer when exceeding the maximum stated water pressure.
  • After testing, do not relieve any high pressure by opening the mixer.
  • Exposing the internals of the mixer cartridge to higher than specified water pressures will void the manufacturer’s warranty.

For more information and installation, please refer to the product manual or visit sussextaps.com.au.

Mixer diverter system RH Dress Kit

SUSSEX-CMDSRH-Calibre-Mixer-Diverter-System-RH-Dress-Kit-Calibre-Basin-
Mixer-fig.1

  1. Mixer dress kit
    • Remove Mixer protective cover.
    • Using silicone, seal the wall surface around the Mixer.
    • Apply a small amount of silicone to the rear of the backplate prior to mounting onto the wall.
    • Fit the handle body onto the Mixer Cartridge Lever ensuring the Handle is fully engaged.
    • Secure the Handle Body by tightening the Set screw using the Allen Key provided (tighten well).
  2. Diverter dress kit
    • Remove Mixer protective cover.
    • Using silicone, seal the wall surface around the Diverter.
    • Apply a small amount of silicone to the rear of the backplate prior to mounting onto the wall.
    • Fit the handle body onto the Diverter Adaptor, ensuring the Handle is fully engaged.
    • Secure the Handle Body by tightening the Set screw using the Allen Key provided (tighten well).
      To complete the installation, operate the Mixer(s) checking the flow of both hot and cold water from Outlet.
      Check all fittings and fixtures for water leaks.

Mixer diverter system RH Rough-in

SUSSEX-CMDSRH-Calibre-Mixer-Diverter-System-RH-Dress-Kit-Calibre-Basin-
Mixer-fig.2

Rough in plumbing

  • Prior to installing, calculate the finished wall thickness, maximum is 30mm thick, contact manufacturer for further options.
  • If Wall thickness is greater than 30mm, contact manufacturer for further options.
  • Prepare a Nogging to be fixed parallel between the Wall Studs.
  • The Nogging must be fitted to enable the base of the Masterfit to be 30-32mm back from the Stud Face.
  • The Masterfit will be marked “This side Up” to indicate orientation.
  • Using the screws (x4) provided, mount the Masterfit to the Nogging. Ensure the Masterfit is level and square.

Pipe connections

  • The Hot and Cold ports are marked on the Masterfit. (Mixers have individual Hot/Cold inlet ports).
  • Flush all water feed lines. All lines must be free from any dirt and debris before connecting to the Masterfit.
  • Connect Hot and Cold lines to the corresponding 1/2” BSP ports of the Masterfit. (see Drawing)
  • Do not remove any factory fitted pressure plugs or Fixings.
  • Once all water connections are made, check Hot/Cold water flow by operating the Mixer Cartridge.
  • Check all fittings and fixtures for leaks.
  • Leave the Mixer(s) in the closed position and replace the Mixer protective cover

Plumber note

  • On-site high pressure line testing must be conducted with the Mixer in the closed position. (STATIC TEST ONLY)
  • Under no circumstances is the Mixer to be opened when exceeding the maximum stated water pressure.
  • At the completion of the testing, do not relieve any high pressure by opening the Mixer.
  • Exposing the internals of the Mixer Cartridge to higher than specified water pressures, will void the manufacturer’s warranty.

Tapware is to be installed by a Licensed Plumber in accordance with AS/NZS 3500:2003
Recommended working water pressure 300-500 kpa. Maximum water temperature is 65 deg.c
sussextaps.com.au

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals