NetPoint NPX11 Parabolic Antenna Instruction Manual

June 13, 2024
NetPoint

NetPoint NPX11 Parabolic Antenna

ASSEMBLY INSTRUCTION

Components

NetPoint-NPX11-Parabolic-Antenna-fig-1

  • Elevation adjustment plate assembly consisting of:
  • 4 3/8″ NP11 clamps
  • 8 flat washers 3/8″ NP11
  • 8 3/8″ pressure washers
  • 8 3/8″ nuts
  • 1 adjustment plate

When assembling this part, it is inserted in the millimetric adjustment tensioner so that it allows a better stability of the antenna to the tower.

Pre-assembled antenna for easy installation.

Insert the 3/8″ U clamps to the graduated plate with their respective hardware which are: 2 nuts of 3/8″, 2 flat washers and 2 pressure washers.

Finally, the millimetric adjustment tensioner must be assembled to the antenna, to fix this piece to the antenna it can be positioned in any of the sill holes and fixed with the support of a 5/16 bolt, a flat washer, a pressure washer and a nut. These must be sufficiently tight to allow the tensioner to move.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals