Pre-installation Instructions

Description of the softener
The softener system includes a mineral tank (with gravel, distributor and softener resin), brine tank (with salt shelf, brine well, brine tank lid and safety brine valve), and a meter initiated electronic backwashing control valve with bypass and brine line.

Successful Application
Softeners are designed to remove hardness minerals (calcium and magnesium) from water by the process of ion exchange. They may also remove small amounts of “clear water” iron (2 ppm or less). Softeners are not designed to remove “red water” iron or bacterial iron. If greater levels of iron, “red water” or iron bacteria are present, an iron filter (OXY3) must precede the softener. Softeners are not designed to remove particulates. If there is any sediment or turbidity present in the water, a backwashing filter (FBW) with appropriate media must precede the softener. Only specialty tannin softeners are designed to remove tannins and the yellow to tea color from water. Softeners will not reduce hydrogen sulfide (“rotten egg” odor).

Time of Regeneration
Periodically the control valve will go through regeneration. Regeneration is factory preset to 2:00 A.M. The time of regeneration may be changed if needed (see programming procedures on page 8)

Location Considerations
The proper location to install the softener will ensure optimum performance and satisfactory water quality. The following factors should be considered in selecting the location of this system.

  1. The softener must be installed after the pressure tank (private well system only).
  2. The softener should be installed after any iron filter and/or other backwashing filter.
  3. If chlorine is present in the supply water a whole house carbon filter should be installed before the softener.
  4. The system must not be subject to freezing temperatures
  5. Ensure that any in-line filter installed prior to the softener does not restrict the flow or pressure required to backwash the softener.
  6. The system should be installed as close as possible (preferably within 15’) to an adequate floor or laundry drain capable of handling the backwash cycle volume and flow rate (refer to unit specifications on pages 13-14). An air gap should be provided between the drain line and plumbing drain.
  7. All water conditioning equipment should be installed at least 10’ prior to the water heater. Water temperatures exceeding 100°F can damage the internal components of the control valve and mineral tank. An expansion tank may need to be installed in the line to the water heater in order to allow for thermal expansion and comply with local plumbing codes.
  8. Appliances requiring extended periods of continuous or high flow water use (i.e. geothermal heat pumps, swimming pools, lawn irrigation, outside hose bibs, etc.) should bypass all water conditioning equipment unless the equipment has been specifically designed for that purpose.

General Installation Instructions

GENERAL INSTALLATION & SERVICE WARNINGS

The softener is not designed to support the weight of plumbing.

Do not use Vaseline, oils, other hydrocarbon lubricants or spray silicone anywhere. A silicone lubricant may be used on black “O” Rings, but is not necessary. Avoid any type of lubricants, including silicone, on red or clear lip seals.

Do not use pipe dope or other sealants on threads. Teflon® tape must be used on the threads of the 1″ NPT
inlet and outlet and on the threads for the drain line connection. Teflon® tape is not used on the nut connectionsor caps because “O” Ring seals are used.

The nuts and caps are designed to be unscrewed or tightened by hand or with the special plastic Service Wrench, (CV3193, not included). If necessary, pliers can be used to unscrew the nut or cap. Do not use a pipe wrench to tighten nuts or caps. Do not place screwdriver in slots on caps and/or tap with a hammer.

NOTE: If the plumbing system is used as the ground leg of the electric supply, continuity should be maintained by installing ground straps around any non-conductive plastic piping or bypass used in the installation. Make sure the softener is not installed backwards. The softener will not function properly if installed backwards and softener resin may be forced into the water lines. Arrows molded into the valve body indicate the direction of flow.

Site Requirements

  • water pressure — 25-100 psi (1.7 – 6.9 bar)
  • water temperature — 33-100°F (0.5-37.7°C)
  • electrical — 115/120 V, 60 Hz uninterrupted outlet dry locations only
  • the tank should be on a firm level surface
Typical Installation

FIGURE 1: Typical Installation

Bypass Valve

The bypass valve is used to isolate the control valve from the plumbing system’s water pressure in order to perform control valve repairs or maintenance. The 1″ full flow bypass valve incorporates four positions including a diagnostic position that allows a service technician to have pressure to test a system while providing untreated bypass water to the building. Be sure to install bypass valve onto main control valve, before beginning plumbing or make provisions in the plumbing system for a bypass. The bypass body and rotors are glass filled Noryl® and the nuts and caps are glass filled polypropylene. All seals are self-lubricating EPDM to help prevent valve seizing after long periods of non-use. Internal “O” Rings can easily be replaced if service is required. The bypass consists of two interchangeable plug valves that are operated independently by red arrow shaped handles. The handles identify the direction of flow. The plug valves enable the bypass valve to operate in four positions

  1. Normal Operation Position: The inlet and outlet handles point in the direction of flow indicated by the engraved arrows on the control valve. Water flows through the control valve for normal operation of a water softener or filter. During the regeneration cycle this position provides regeneration water to the unit, while also providing untreated water to the distribution system (Fig. 2 ).

  2. Bypass Position: The inlet and outlet handles point to the center of the bypass. The system is isolated from the water pressure in the plumbing system. Untreated water is supplied to the building (Fig. 3 ).

  3. Diagnostic Position: The inlet handle points toward the control valve and the outlet handle points to the center of bypass valve. Untreated supply water is allowed to flow to the system and to the building, while not allowing water to exit from the system to the building (Fig. 4 ) . This allows the service technician to draw brine and perform other tests without the test water going to the building.
    NOTE: The system must be run through a rinse cycle before returning the bypass valve to the normal position.

  4. Shut Off Position: The inlet handle points to the center of the bypass valve and the outlet handle points away from the control valve. The water is shut off to the building. The water treatment system will depressurize upon opening a tap in the building. A negative pressure in the building combined with the softener being in regeneration could cause a siphoning of brine into the building. If water is available on the outlet side of the softener it is an indication of water bypassing the system (Fig. 5 )

Installation Instructions

STEP 1:
Unpack softener, making sure to remove entire contents of the shipping container prior to disposal.

STEP 2:
Fill the resin tank. Cover the top of the distributor tube with the included red cap and, using the included blue media funnel, pour the included softener resin into the mineral tank.

STEP 3:
Install the control valve. Clean resin tank threads to remove any resin beads. Remove red cap from distributor tube and install control valve by threading it securely onto the mineral tank. (O-ring seal; HAND TIGHTEN ONLY!).

STEP 4:
Install bypass valve onto main control valve, before beginning plumbing. Make provisions to bypass outside hydrant and cold hard water lines at this time

STEP 5:
Shut off all water at main supply. On private well system, turn off power to pump and drain pressure tank. Make certain pressure is relieved from complete system by opening nearest faucet to drain system. SHUT OFF FUEL / ELECTRICAL SUPPLY TO WATER HEATER.

STEP 6:
Plumb the water supply line to the unit’s bypass valve inlet located at the right rear as you  face the unit. There are a variety of installation fittings available. They are listed under Installation Fitting Assemblies, pages 21-23. When assembling the installation fitting package (inlet and outlet), connect the fitting to the plumbing system first and then attach the nut, split ring, and “O” Ring. Heat from soldering or solvent cements may damage the nut, split ring, or “O” Ring. Solder joints should be cool and solvent cements should be set before installing the nut, split ring, and “O” Ring. Avoid getting solder flux, primer, and solvent cement on any part of the “O” Rings, split rings, bypass valve, or control valve. If the building’s electrical system isgrounded to the plumbing, install a copper grounding strap from the inlet to the outlet pipe. Plumbing must be done in accordance with all applicable local codes. MAKE CERTAIN WATER ENTERS THROUGH INLET AND DISCHARGES THROUGH OUTLET
FIGURE 6: Top View of Control Valve with Bypass Installed

STEP 7:
Apply thread tape to DLFC Assembly. Remove drain line flow control (DLFC) retainer clip (Figure 6, Page 5) and remove the DLFC assembly from the valve body, (Figure 6, Page 5). Apply thread tape to threads. Slide drain fitting compression nut onto provided drain tubing and place the tube insert inside the end of the tubing. Insert tubing end with insert into drain elbow and tighten the compression nut onto the thread taped elbow. Reinsert DLFC assembly into the valve body, making certain it is FULLY inserted before replacing the retaining clip.

STEP 8:
Install softener drain line. Use ½” I.D. polyethylene tubing (DO NOT USE FLEXIBLE VINYL TUBING!) to run drain line from control valve DLFC fitting (Figure 6, Page 5, not shown) to floor drain or sump pit capable of handling the backwash rate of the filter (refer to specificationsand flow rate on pages 15-16) or discard the compression fitting and use 3/4″ NPT fitting to connect a rigid pipe drain line (recommended). If backwash flow rate is greater than 7 gpm, use ¾” NPT connector with rigid drain line. There must be an air gap at the end of the drain line to prevent siphoning of waste water. Length of drain line should be 15’ or less. AVOID OVERHEAD DRAINS.

STEP 9:
Connect brine line between the softener and safety brine valve. Install the 3/8″ O.D. polyethylene tube from the brine refill elbow (Figure 6, Page 5) to the safety brine valve (Figure 7) inside the brine tank. DO NOT INSERT THE BRINE REFILL LINE INTO THE BRINE TANK OVERFLOW ELBOW FITTING. Do not put salt in the tank until STEP 25.
FIGURE 7: Brine Tank Components

STEP 10:
Install brine tank overflow drain line (not included). An overflow drain line is recommended. The softener includes a safety brine valve (Figure 7) which reduces the chance of a brine overflow. In the event of a malfunction, an overflow drain line will direct the “overflow” to the drain instead of onto the floor where it could cause considerable damage. This fitting is an elbow on the side of the brine tank (Figure 7). Attach a length of 1/2″ I.D. tubing to fitting and run to a drain. Do not elevate overflow line higher than 3″ below bottom of overflow fitting. DO NOT “TIE” THIS TUBE INTO THE DRAIN LINE OF THE CONTROL VALVE AS IT WILL RESULT IN OVERFILLING THE BRINE TANK AND FLOODING. The overflow line must be a direct, separate line from the brine tank overflow elbow to a floor drain or sump pit.

STEP 11:
With the bypass valve handles in the bypass position (Figure 3, Page 4), turn on water supply. Turn the inlet bypass valve handle to the diagnostic position (Figure 4, Page 4) and allow the softener to pressurize. NOTE: the INLET and OUTLET knobs turn clockwise to close the port to the softener and counter- clockwise to open the port to the softener. Check for leaks and correct as needed. Return the inlet bypass valve handle to the bypass position.

STEP 12:
Program control valve. Plug the transformer of the control valve into an uninterrupted electrical outlet (not wired to a switch) and use the buttons on the front of the control valve to adjust the initial settings:

A) SET THE TIME OF DAY
  1. Press the “SET CLOCK” button
    a. The upper left of the display will show “SET TIME”
    b. The hour will flash

  2. Press the UP or DOWN buttons (triangle pointing up or down) until the correct combination of hour and “AM” or “P M” (NOTE: letter spacing as shown on the display) is reached to match the current time.

  3. Press the “NEXT” button
    a. The upper left of the display will show “SET TIME”
    b. The minutes will flash

  4. Press the UP or DOWN buttons until the minutes match the current time.

  5. Press the “NEXT” button
    a. The upper left of the display will show “TIME”
    b. The current time of day will be shown on the right side of the display
    c. Only the colon between the hour and minutes will be flashing

B) Enter Programming: The manufacturer has preset the unit so gallons between regenerations are automatically calculated after hardness is entered.

  1. Hardness: Press “NEXT” and UP (triangle pointing up) buttons simultaneously for 3 seconds.
    a. The upper left of the display will show “SET HARDNESS”
    b. A number will flash (default 20)

  2. Based on water analysis results (obtained either from a lab or in-field testing). Set the amount of hardness in grains per gallon using the UP or DOWN (triangle pointing up or down) buttons. The allowable range is from 1 to 150 in 1 grain increments. Note: Increase the grains per gallon if soluble (“clear water”) iron and/or manganese is present (1 ppm iron = 3 gpg hardness and 1 ppm manganese = 5 gpg hardness).

  3. Regeneration Days Override: Press the “NEXT” button
    a. The upper left of the display will show “SET”
    b. The lower left of the display will show “REGEN” above and “DAY” below.
    c. A number will flash (default 14)

  4. Using the UP or DOWN (triangle pointing up or down) buttons, set the maximum number of days (default 14, recommended) the softener will go without initiating regeneration even if the unit still has capacity remaining based on water usage, hardness setting and capacity setting. The allowable range is 1 to 28 and OFF. If set to OFF, the unit will only regenerate based on water usage, hardness and capacity.

  5. Regeneration Time: Press the “NEXT” button
    a. The upper left of the display will show “SET TIME”
    b. The middle left of the display will show “REGEN”
    c. The hour will flash

  6. Regeneration Hour: Using the UP or DOWN buttons, set the combination of hour of day and “AM” or “P M” (NOTE: letter spacing as shown on the display) that the BACKWASH cycle of regeneration should occur. Please note that regeneration will actually begin with the Brine Fill cycle 2 hours prior to the time set here followed by 120 minutes of inactivity to allow water in the brine tank to become saturated with salt.
    7. Press the “NEXT” button
    a. The upper left of the display will show “SET TIME”
    b. The middle left of the display will show “REGEN”
    c. The minutes will flash

  7. Regeneration Minutes: Using the UP or DOWN buttons, set the minutes portion of the time when regeneration should occur.

  8. Exit Programming: Press the “NEXT” button
    a. The upper left of the display will show “TIME”
    b. The current time of day will be shown on the right side of the display
    c. Only the colon between the hour and minutes will be flashing

STEP 13:
Initiate Manual Regeneration (Fill Cycle): (NOTE:, the bypass should be in the bypass position) Press and hold the “REGEN” button 3 seconds or until the word “Fill” appears in the lower right of the display and “REGEN” appears at the middle left of the display. The drive motor will run briefly and count-down timer will appear in the time-of-day position on the display. Press the “REGEN” button briefly. The control valve will advance to the next cycle.

STEP 14:
Softening Cycle: “SOFTENING” will appear in the upper left of the display and “REGEN” in the middle left. Another count-down timer will appear in the time- of-day position of the display. Make sure the bypass handles are in the bypass position (Figure 3, Page 4)! Press the “REGEN” button to advance the control valve to the “BACKWASH” cycle.

STEP 15:
Backwash Cycle: There will be an audible release of pressure to the drain. “BACKWASH” will be shown in the lower middle of the display and “REGEN” appears in the middle left of the display. Another count-down timer will appear in the time-of-day position. Unplug the transformer from the electrical outlet. Slowly turn the INLET knob of the bypass, counterclockwise, to a point approximately 1/3 of the way between “Bypass” and “Service” positions (Figure 2, Page 4) or until the remaining air is released from the tank. When only water flows to the drain; gradually turn the INLET knob of the bypass valve counter-clockwise until it is fully in “Service” position (Figure 2, Page 4). Then turn the OUTLET knob of the bypass valve counter-clockwise until it is fully in the “Service” position (Figure 2, Page 4). When the water flowing to drain runs clear, plug the transformer back into the electrical outlet. Press the “REGEN” button to advance to the “Brine Draw” cycle.

STEP 16:
Brine Cycle: “BRINE” will appear in the lower right of the display, “REGEN” will show in themiddle left of the display and a new count-down timer will flash alternating with the letters “dn”. Press “REGEN” to advance to the second “Backwash” cycle.

STEP 17:
Backwash Cycle 2: “BACKWASH” will be shown in the lower middle of the display and“REGEN” appears in the middle left of the display. Another count-down timer will appear in the time-of-day position. Press “REGEN” to advance to the “Rinse” cycle.

STEP 18:
Rinse Cycle: Another count-down timer will appear in the time-of-day position, “RINSE” will be shown in the lower middle of the display and “REGEN” appears in the middle left of the display. Press the “REGEN” button to exit manual regeneration.

STEP 19:
Exit Manual Regeneration: The right side of the display will be blank and “SOFTENING” will flash in the upper left of the display, “REGEN” will appear in the middle left of the display and the drive motor will run for a few seconds until the current time-of-day is shown on the right side of the display and “TIME” is shown in the upper left of the display.

STEP 20:
Initiate Manual Regeneration (Fill Cycle): (NOTE: bypass should be in service position) Press and hold the “REGEN” button 3 seconds or until the word “Fill” appears in the lower right of the display and “REGEN” appears at the middle left of the display. The drive motor will run briefly and count-down timer will appear in the time-of-day position on the display. Allow the cycle to complete and advance to the next step automatically. If water does not fill to a point above the salt grid (if applicable), add some water manually to have at least 1 or 2 inches of water above the grid or a total of approximately 6 inches if no grid is present.

STEP 21:
Backwash Cycle: “BACKWASH” will be shown in the lower middle of the display and “REGEN” appears in the middle left of the display. Another count-down timer will appear in the time-of-day position. Press the “REGEN” button to advance to the “Brine Draw” cycle.

STEP 22:
Brine Cycle: “BRINE” will appear in the lower right of the display, “REGEN” will show in the middle left of the display and a new count-down timer will flash alternating with the letters “dn”. Allow this cycle to run until the water in the brine tank is drawn below the salt grid and then press “REGEN” briefly to advance to the second “Backwash” cycle.

IMPORTANT: If water is NOT drawn below the grid (or down to the air check) within 15 – 30 minutes (depending on softener size); complete step 24 of the installation and refer to the “Brine Tank Overfill” section of Troubleshooting (page 12) to resolve this problem. Failure to do so will prevent the softener from functioning properly. Test the solution by returning to STEP 20 and proceeding from there.

STEP 23 Backwash Cycle 2:
“BACKWASH” will be shown in the lower middle of the display and “REGEN” appears in the middle left of the display. Another count-down timer will appear in the time-of-day position. Press “REGEN” to advance to the “Rinse” cycle.

STEP 24:
Rinse Cycle: Another count-down timer will appear in the time-of-day position, “RINSE” will be shown in the lower middle of the display and “REGEN” appears in the middle left of the display. Press the “REGEN” button to exit manual regeneration.

STEP 25:
Add salt to brine tank. Fill the brine tank with salt. Any type of softening salt may be used. Solar salt is recommended to minimize frequency of brine tank cleanout.

STEP 26:
TURN ON FUEL / ELECTRICAL SUPPLY TO WATER HEATER

Control Valve Operating Displays

General Operation:

When the system is operating, one of two displays may be shown. Pressing next will alternate between displays. One of the displays is always the current time of day. The other display shows the current volume remaining in Gallons. Capacity remaining is the gallons that will be treated before the system goes through a regeneration cycle. The user can switch between the displays as desired.

If the system has called for a regeneration that will occur at the preset time of regeneration, the words REGEN TODAY will appear on the display.

The softener has an installed water meter, the word “Softening” flashes on the display when water is being treated (i.e. water is flowing though the system).

Regeneration Mode:
Typically a system is set to regenerate at a time of no water use. If there is a demand for water when the system is regenerating, untreated water will be delivered. When the system begins to regenerate, the display will change to include information about the step of the regeneration process and the time remaining for that step to be completed. The system runs through the steps automatically and will reset itself to provide treated water when the regeneration has been completed.

Manual Regeneration:
Sometimes there is a need to regenerate before the control valve calls for it. This may be needed if a period of heavy water use is anticipated or when the system has been operated without salt.

  • To initiate a manual regeneration at the preset delayed regeneration time, press and release regen. The words “REGEN TODAY” will flash on the display to indicate that the system will regenerate at the preset delayed regeneration time.
  • If you pressed the regen button in error, pressing the button again will cancel the command.
  • To initiate an immediate manual regeneration, press and hold the regen button for three seconds. The system will begin to regenerate immediately. This command cannot be cancelled.

Power Loss:
If the power goes out for less than two hours, the systemwill automatically reset itself. If an extended power outage occurs, the time of day will flash on and off which indicated the time of day should be reset. The system will remember all other settings.

Error Message: If the word “ERROR” and a number are alternately flashing on the display, record the number and contract the dealer for help. This indicates that the control valve was not able to function properly.

Quick Reference Guide

GENERAL OPERATION

When the system is operating either the Time of Day or Gallons of Treated Water Available will be displayed. Pressing NEXT will toggle between the two screens.

TO SET TIME OF DAY

In the event of a prolonged power outage, time of day flashes, indicating that this needs to be reset. All other information will be stored in memory, no matter how long the power outage. Complete the steps as shown to the right

  1. Accessed by pressing SET CLOCK
  2. Adjust hours with  and  Voumons AM/PM toggles at 12
  3. Press NEXT
  4. Adjust minutes with and buttons
  5. Press NEXT to complete and return to normal operation

ADJUST HARDNESS, DAYS BETWEEN REGENERATION, OR TIME OF REGENERATION

For initial set-up or adjustments, please complete to make to the right.  the steps as shown

NOTE:
Hardness display shows “-nA-“if used as a displays do not filter. Ifother instructions. appear, refer tofull programming.

  1. Accessed by pressing SET CLOCK
  2. Adjust hours with and buttons AM/PM toggles at 12
  3. Press NEXT
  4. Adjust minutes with and buttons
  5. Press NEXT to complete and return to normal operation.

Specifications

Description Model Numbers
IMX24-1 IMX30-1
MEDIA VOLUME ft 3 0.75

2.5
CAPACITY, grains| | | | |
@Factory Salt @ 9lb/ft3 (146 g/L)| 18,000| 24,000| 36,000| 48,000| 60,000
@Max. Salt @ 15lb/ft3 (243 g/L)| 22,500| 30,000| 45,000| 60,000| 75,000
Operating Flow Rate, gpm| | | | |
Continuous (3 gpm/ft3)| 2| 3| 5| 6| 8
Service (8 gpm/ft3, <= 15 psi drop)| 6| 8| 12| 14| 18
Peak (Max. 20 psi drop)| 17| 18| 18| 22| 22
Pressure Loss psi| | | | |
@ Continuous Flow Rate| 2| 2| 4| 3| 5
@ Service Flow Rate| 5| 7| 12| 10| 15
@ Peak Flow Rate| 20| 20| 20| 20| 20
Regen. Flow Rates, gpm| | | | |
Backwash & Rapid Rinse| 1.7| 2.7| 3.2| 4.2| 4.2
Brine Draw / Rinse| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5
Service Pipe Size, in.| 1”| 1”| 1”| 1”| 1”
Factory Regeneration Settings| | | | |
Brine Tank Fill (lbs of salt)| 6| 9| 13.5| 18| 22.5
Softening (minutes dissolving salt)| 120| 120| 120| 120| 120
Backwash (minutes)| 8| 8| 8| 8| 8
Brine Draw & Rinse (minutes)| 60| 60| 60| 60| 60
Backwash (minutes)| 8| 8| 8| 8| 8
Rapid Rinse (minutes)| 4| 4| 4| 4| 4
Total Water Used, gallons| 64| 81| 94| 114| 114
Dimensions in.| | | | |
Mineral Tank, diameter x height| 8 x 44| 9 x 48| 10 x 54| 12 x 48| 13 x 54
Brine Tank, diameter x height| 18 x 33| 18 x 33| 18 x 33| 18 x 33| 18 x 33
Overall, length x width x height| 18 x 26 x 52| 18 x 27 x 56| 18 x 28 x 62| 18 x 30 x 56| 18 x 31 x 62
Approximate Ship Wt., lbs.| 88| 104| 137| 162| 213
**Description| Model Numbers
IMCX24-1| IMCX30-1| INTX34-1| IMIX34-1| IMIX68-1
Resin Volume, cu. ft.| 0.75| 1.0| 1.0| 1.0| 2.0
Capacity, grains| | | | |
@Factory Salt @ 9lb/ft3 (146 g/L)|
18,000| 24,000| 24,000| 24,000| 48,000
@Max. Salt @ 15lb/ft3 (243 g/L)|
22,500| 30,000| 30,000| 30,000| 60,000
Gravel Underbed, lbs.| 20| 20| 20| 20| 25
Operating Flow Rate, gpm| | | | |
Continuous (3 gpm/ft3)|
2| 2| 2| 3| 5
Service (8 gpm/ft3, <= 15 psi drop)* (5 gpm/ft2, <= 15 psi drop)| 6| 6| 6| *5
| **10*
Peak (Max. 20 psi drop)|
23| 22| 22| 18| 22
Pressure Loss psi (kPa)| | | | |
@ Continuous Flow Rate|
1| 1| 1| 2| 3
@ Service Flow Rate|
3| 3| 3| 4| 6
@ Peak Flow Rate|
20| 19| 19| 20| 19
Regen. Flow Rates, gpm| | | | |
Backwash & Rapid Rinse|
2.7| 3.2| 3.2| 2.7| 4.2
Brine Draw and Rinse|
0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5
Service Pipe Size, in.| 1”| 1”| 1”| 1”| 1”
Factory Regeneration Settings| | | | |
Brine Tank Fill (lbs of salt)|
6| 9| 9| 9| 18
Softening (minutes dissolving salt)|
120| 120| 120| 120| 120
Backwash (minutes)|
8| 8| 8| 8| 8
Brine Draw & Rinse (minutes)|
60| 60| 60| 60| 60
Backwash (minutes)|
8| 8| 8| 8| 8
Rapid Rinse (minutes)|
4| 4| 4| 4| 4
Total Water Used,gallons| 81| 94| 94| 81| 114
Dimensions in.| | | | |
Mineral Tank, diameter x height|
10 x 35| 10 x 35| 10 x 35| 9 x 48| 12 x 48
Brine Tank, w x d x h|
13 x 13 x 35| 13 x 13 x 35| 13 x 13 x 35| 18 x 33| 18 x 33
Overall, length x width x height|
16 x 23 x 43| 16 x 23 x 43| 13 x 22 x 43| 18 x 27 x 56| 18 x 30 x 56
Approximate Ship Wt., lbs.| 83| 94| 102| 104| 162
****
Description| Model Numbers
---|---
HECX26-1| HECX34-1| HEX26-1| HEX34-1| HEX51-1| HEX68-1| HEX85-1
Media Volume, ft 3| 0.75| 1.0| 0.75| 1.0| 1.5| 2.0| 2.5
Capacity, grains| | | | | | |
@ Factory Salt – 6lb/ft3|
16,500| 22,000| 16,500| 22,000| 33,000| 44,000| 55,000
@ Max. Salt – 15lb/ft3|
23,250| 31,000| 23,250| 31,000| 46,500| 62,000| 93,000
Operating Flow Rate, gpm| | | | | | |
Continuous (3 gpm / ft3)|
2| 2| 2| 3| 5| 6| 8
Service (8 gpm / ft3, <=15 psi drop)|
6| 6| 6| 8| 12| 14| 18
Peak (Max. 20 psi drop)|
23| 22| 17| 18| 18| 22| 22
Pressure Loss psi| | | | | | |
@ Continuous Flow Rate|
1| 1| 2| 2| 4| 3| 5
@ Service Flow Rate|
3| 3| 5| 7| 12| 10| 15
@ Peak Flow Rate|
20| 19| 20| 20| 20| 20| 20
Regen. Flow Rates, gpm| | | | | | |
Backwash & Rapid Rinse|
2.7| 3.2| 1.7| 2.7| 3.2| 4.2| 4.2
Brine Draw and Rinse|
0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5| 0.38 / 0.5
Service Pipe Size, in.| 1”| 1”| 1”| 1”| 1”| 1”| 1”
Factory Regeneration Settings| | | | | | |
Brine Tank Fill (lbs of salt)|
4.7| 6| 4.7| 6| 9| 12| 15
Softening (minutes dissolving salt)|
120| 120| 120| 120| 120| 120| 120
Backwash (minutes)|
6| 6| 6| 6| 6| 6| 6
Brine Draw & Rinse (minutes)|
45| 45| 45| 45| 45| 45| 45
Backwash (minutes)|
3| 3| 3| 3| 3| 3| 3
Rapid Rinse (minutes)|
3| 3| 3| 3| 3| 3| 3
Total Water Used, gallons| 55| 61| 43| 55| 61| 73| 73
Dimensions in.| | | | | | |
Mineral Tank, diameter x height|
10 x 35| 10 x 35| 8 x 44| 9 x 48| 10 x 54| 12 x 48| 13 x 54
Brine Tank, diameter x height|
13 x 13 x 35| 13 x 13 x 35| 18 x 33| 18 x 33| 18 x 33| 18 x 33| 18 x 33
Overall, length x width x height|
16 x 23 x 43| 16 x 23 x 43| 18 x 26 x 52| 18 x 27 x 56| 18 x 28 x 62| 18 x 30 x 56| 18 x 31 x 62
Approximate Ship Wt., lbs.| 82| 94| 93| 104| 137| 162| 213**

Component Parts Breakdown

Component Parts List

REF DESCRIPTION MODEL NUMBER
IMX24-1 IMX30-1 IMX45-1
**A*** Control Valve IMX24 Vlv Assy L/BP
Assy L/BP IMX60 Vlv Assy L/BP IMX75 Vlv Assy L/BP
B Mineral Tank MTP0844GR
C Distributor D100S-48
D Resin 1 ½ – H05P
E 1/4/ x 1/8 gravel QC20
F Brine Tank Assy. BTSQ1833ASSY
BTSQ1833ASSY BTSQ1833ASSY
G Overflow Elbow BT-OVERFLO

OVERFLO
H| Safety Brine Valve| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY
I| Salt Platform| BTSG18SQ| BTSG18SQ| BTSG18SQ| BTSG18SQ| BTSG18SQ
J**| Bypass Valve Less Fittings| CV3006| CV3006| CV3006| CV3006| CV3006
K| Elbow LockingClip| FC103| FC103| FC103| FC103| FC103
REF| DESCRIPTION| MODEL NUMBER
---|---|---
IMCX24-1| IMCX30-1| INTX34-1| IMXI34-1| IMIX68-1
A*| Control Valve| IMCX24 Vlv Assy L/BP| IMCX30 Vlv Assy L/BP| INTX34 Vlv Assy L/BP| IMIX34 Vlv Assy L/BP| IMIX68 Vlv Assy L/BP
B| Mineral Tank| MTP0935GR| MTP1035GR| MTP1035GR| MTP0948GR| MTP1248GR
C| Distributor| D100S-48| D100S-48| D100S-48| D100S-48| D100S-48
D| Resin| 1 ½ – H05P| 2 – H05P| 2 – H05P| 2 – H05P| 4 – H05P
E| 1/4/ x 1/8 gravel| QC20| QC20| QC20| QC20| QC25
F| Brine Tank Assy.| BT1234ASSY| BT1234ASSY| BT1234ASSY| BTSQ1833ASSY| BTSQ1833ASSY
G| Overflow Elbow| BT-OVERFLO| BT-OVERFLO| BT-OVERFLO| BT-OVERFLO| BT- OVERFLO
H| Safety Brine Valve| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY
I| Salt Platform| BTSG12| BTSG12| BTSG12| BTSG18SQ| BTSG18SQ
J**| Bypass Valve Less Fittings| CV3006| CV3006| CV3006| CV3006| CV3006
K| Elbow Locking Clip| FC103| FC103| FC103| FC103| FC103
REF| DESCRIPTION| MODEL NUMBER
---|---|---
HECX26-1| HECX34-1| HEX26-1| HEX34-1| HEX51-1| HEX68-1| HEX85-1
A*
| Control Valve| HECX26 VlvAssy L/BP| HECX34 VlvAssy L/BP| HEX26 VlvAssy L/BP| HEX34 VlvAssy L/BP| HEX51 VlvAssy L/BP| HEX68 VlvAssy L/BP| HEX75 VlvAssy L/BP
B| Mineral Tank| MTP0935GR| MTP1035GR| MTP0844GR| MTP0948GR| MTP1054GR| MTP1248GR| MTP1354N
C| Distributor| D100S-48| D100S-48| D100S-48| D100S-48| D100S-54| D100S-48| D100S-54
D| Resin| 1.5 – UHE05P| 2 – UHE05P| 1.5 – UHE05P| 2 – UHE05P| 3 – UHE05P| 4 – UHE05P| 5 – UHE05P
E| 1/4/ x 1/8 gravel| QC20| QC20| QC20| QC20| QC20| QC25| 2 – QC20
F| Brine Tank Assy.| BT1234ASSY| BT1234ASSY| BTSQ1833ASSY| BTSQ1833ASSY| BTSQ1833ASSY| BTSQ1833ASSY| BTSQ1833ASSY
G| Overflow Elbow| BT-OVERFLO| BT-OVERFLO| BT-OVERFLO| BT-OVERFLO| BT- OVERFLO| BT-OVERFLO| BT-OVERFLO
H| Safety Brine Valve| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY| SBV14ASSY
I| Salt Platform| BTSG12| BTSG12| BTSG18| BTSG18| BTSG18| BTSG18| BTSG18
J**| Bypass Valve Less Fittings| CV3006| CV3006| CV3006| CV3006| CV3006| CV3006| CV3006
K| Elbow Locking Clip| FC103| FC103| FC103| FC103| FC103| FC103| FC103

Control Valve Breakdown

Control Valve Parts List

**REF #** **Part Number** **Description**
A CV3002 Drive Assembly, IMX Series
B CV3186 Power Cord with Transformer
C CV3003 Meter and Cable Assembly
D CV3006 Bypass Valve, Less Fittings
1 CV3175-01R Front Cover, Gray, IMX Series
2 CV3107-01 Drive Motor
3 CV3108- 11BOARD Circuit Board, IMX Series
4 CV3004 Drive Cap Assembly
5 CV3135 O-ring, -228
6 CV3011 Piston Assembly
7 CV3174 Brine Valve
8 CV3005 Seal Cartridge Assembly
9 CV3178 Back Plate
10 CV3180 Base O-ring, -337
11 CV3105 O-ring, -215
12 CV3177-01 Injector Screen
13 CV3010-1Z Plug, Injector Assembly
14 CV3010-1F Injector, Blue
15 CV3150 Retainer, Split Ring
16 CV3151 Nut, 1” Quick Connect
17 CH4615 Clip, Elbow Locking
18 CV3163 O-ring, -019
19 CV3165-01 Retainer, Brine Refill Flow Control
20 CV4144 3/8” Elbow, Parker fitting
21 CV3192 PKP10TS8BULK Compression nut, ¾” FNPT, for drain elbow Insert, for

5/8” OD poly tube
22| CV3158-02| Elbow, Drain, ¾” Male
23| CV3159-01| Retainer, Drain Line Flow Control
**** 24| CV3162-017 CV3162-027 CV3162-032 ** CV3162-042 CV3162-053| Drain Line Flow Control Button:** Flow Control Washer, 1.7 GPM (for IMX24-1, HEX26-1)Flow Control Washer, 2.7 GPM (for IMCX24-1, IMX30-1, IMIX34-1, HECX26-1 and HEX34-1)Flow Control Washer, 3.2 GPM (for INTX34-1, IMCX30-1, IMX45-1, HECX34-1, HEX51-1)Flow Control Washer, 4.2 GPM (for IMX60-1, IMIX68-1, HEX68-1) Flow Control Washer, 5.3 GPM (for IMX75-1, and HEX85-1 )

Installation Fitting Assemblies

1″ PVC MALE NPT ELBOW 3/4″ & 1″ PVC SOLVENT ELBOW
Ref Part # Description
Description Qty
**** CV3007 1″ PVC male NPT elbow assy **** 2
PVC solvent elbow assy 2
1 CV3151 Nut, 1″ quick connect
2 CV3150 Split ring
3 CV3105 O-ring 215
4 CV3149 Fitting
1″ BRASS SWEAT 3/4″ BRASS SWEAT
Ref Part # Description
Description Qty
CV3007-02 1″ brass sweat assembly 2
assembly **** 2
1 CV3151 Nut, 1″ quick connect
connect 2
2 CV3150 Split ring
3 CV3105 O-ring 215
4 CV3188 Fitting
3/4″ BRASS SHARK BITE 1″ BRASS SHARK BITE
Ref Part # Description
Description Qty
**** CV3007-12 3/4″ brass shark bite assembly **** 2
brass shark bite assembly 2
1 CV3151 Nut, 1″ quick connect
2 CV3150 Split ring
3 CV3105 O-ring 215
4 CV3628 Fitting

1-1/4″ PLASTIC MALE NPT

Ref| Part #| Description| Qty
| CV3007-05| 1-1/4″ plastic male NPT assembly| 2
1| CV3151| Nut, 1″ quick connect| 2
2| CV3150| Split ring| 2
3| CV3105| O-ring 215| 2
4| CV3317| Fitting| 2

3/4″ QUICK CONNECT

Ref| Part #| Description| Qty
K| QFNCR4| 3/4″ QUICK CONNECT| 1*

SERVICE WRENCH – CV3193
Although no tools are necessary to assemble or disassemble the valve, the Service Wrench, (shown in various positions on the valve) is available to aid in assembly or disassembly.

Troubleshooting

PROBLEM CAUSES SOLUTIONS
Brine tank overfills or does not draw brine A)       Loose nut at either end

of the brine lineB)       Brine line inserted into the brine tank overflow fitting rather than connected to the safety brine valveC)       Softener drain line connected to brine overflow fitting or overflow drain lineD) Obstruction in the control valveE)       Problems with drain line: plugged, frozen, kinked, flexible tubing, overhead installation, diameter too small, longer than 15’F)       Missing BLFCG)      Missing brine stemH)       Dirty brine tank| 1)        Tighten nuts at either end of brine line2)        Verify brine line is installed correctly3)        Verify softener drain line is not connected to brine overflow elbow or brine overflow drain line4)        Check for debris in DLFC Assembly, BLFC Assembly, injector, injector screen5) Manually put softener into Backwash Cycle (page 9, beginning with step 11) and unplug the transformer for 30 minutes to dislodge debris from inside the control valve or disassemble and clean control valve internal components6) Resolve issues with the drain line7)        Verify brine line flow control button is not missing8)        Verify piston brine stem is not missing9) Clean out brine tank
Hard water or softener not using salt| A)       Softener is plugged into an electrical outlet without power or one that is tied to a switchB)       No salt in the brine tankC)       Salt in the brine tank has “bridged”D) Bypass Valve is not in “Service” position or is leakingE)       Obstruction in control valveI)    Problems with drain line: : ( See letter “E” in prior section )F)       Control valve programmed incorrectlyG) Softener sized improperly for actual service flow ratesH)       Faulty or unplugged drive motorI)         Meter cable disconnected| 1)        Verify softener has uninterrupted power2)        Fill brine tank with salt3) Hit the side of the brine tank with rubber mallet to break any bridging that has formed in the brine tank4)        Verify bypass is in “Service” position (Figure 2, Page 4)5)        Check for debris in DLFC Assembly, BLFC Assembly, injector, injector screen6)        Manually put softener into Backwash Cycle (page 9, beginning with step 11) and unplug transformer for 20-30 minutes to dislodge debris7)        Resolve issues with drain line8)        Review control valve programming9)        Verify actual service flow rates required and compare to system specifications (pages 13-14)10)     Verify drive motor is connected to control valve circuit board connector J1 (labeled “MOTOR”)11) Verify meter cable (grey cable, 3 pins) is connected to control valve circuit board connector J2 (labeled “METER”)
PROBLEM| CAUSES| SOLUTIONS
Softener regenerates at wrong time of day| A)       Clock is not setB) Power outageC)       Incorrect control valve programming|

  1. Reset softener clock (page 7)
  2. Verify control valve programming (page 8)

Resin in water lines, plugged aerators| A)       Unit is installed backwardsB) Distributor basket is damaged|

  1. Re-plumb unit with water supply entering bypass inlet (page 5)
  2. Replace damaged distributor basket

Salty Water

| A)       Brine tank overfilledB)       Problems with drain line: ( See Letter “E” in Brine Tank Overfill section )C)       Rinse cycle is shortD)      Salt setting too highE)       Distributor tube improperly seated in control valve or is too shortF)       Low water pressure|

  1. See “Brine tank overfills” section (Page 22)
  2. Resolve drain line issues
  3. Contact technical support for assistance in verifying \ adjusting Rinse Cycle length and Salt Setting
  4. Verify proper installation of distributor tube
  5. Verify at least 25 psi of line pressure

Softener leaks to drain in “Service” position

| A)       Problem in piston cartridge assemblyB)       Control valve is jammed or halted during regenerationC)       Drive cap assemblyis not tightened properly|

  1. Replace seals and/or piston if needed
  2. Verify control valve is in “SOFTENING” mode
  3. Tighten drive cap assembly

Low water pressure| A)       Iron or sediment build up in softenerB) Insufficient pump capacity|

  1. Increase backwash frequency by increasing hardness setting (page 8)
  2. Verify at least 25 psi of line pressure

Display is blank| A)       Control valve circuit board needs resetB) Transformer is unpowered, unplugged or defectiveC)       Defective circuit board|

  1. Hold “NEXT” and “REGEN” buttons for 3 seconds
  2. Remove battery, unplug power for 5 seconds, plug back in, replace dead battery
  3. Verify transformer is plugged into an electrical outlet that has power and transformer cable (black, 4 pins) is plugged into control valve connector J4 (labeled “POWER”)
  4. With transformer plugged into electrical outlet, use a volt meter to test the 2 outer pins (furthest left and furthest right) of connector J4 on the control valve circuit board. Should be approximately 15 volts DC. Replace transformer if defective.
  5. Replace circuit board if needed

“SOFTENING” doesnot display when water is flowing| A)       Bypass valve not in “Service” positionB)       Meter cable disconnectedC) Restricted/stalled meter turbineD)      Defective meter|

  1. Verify bypass is in “Service” position (Figure 2, Page 4)
  2. Verify meter cable (grey cable, 3 pins) is connected to control valve circuit board connector J2 (labeled “METER”)
  3. Remove meter and check for restriction
  4. Replace meter if needed

PROBLEM| CAUSES| SOLUTIONS
Display shows incorrect time-of-day or time-of-day flashes| A)       Outlet is on a switchB)       Power outageC)       Control valve was resetD) Defective circuit board|

  1. Use an un-switched outlet
  2. Reset time-of-day
  3. Replace circuit board if needed

ERROR CODE:| |
1001 – unable to sense motor movement| A) Drive motor not inserted fully to engage pinion or is defectiveB)       Circuit board not properly snapped into drive bracketC)       Center reduction gear reflector dirty|

  1. Re-insert motor, check for broken wires, verify motor plugged into connector J1 (labeled “MOTOR”) on control valve circuit board and reset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)
  2. Re-seat circuit board into drive bracket and reset control valve
  3. Clean reduction gear reflectors (page 17)

1002 – unexpected motor stall| A)  Obstruction in control valveB)       Main drive gear too tightC)       Improper voltage delivered to circuit board|

  1. Remove piston and seal assemblies for inspection and repair or replacement and reset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)2)        Loosen main drive gear and reset control vlalve
  2. Verify proper voltage is being supplied to circuit board (see Solution 4 under “Display is Blank” section, page 23)

1003 – motor ran too long, cannot find next cycle position| A)  Motor failure during regenerationB)       Obstruction in control valveC)       Drive bracket not snapped in place properly|

  1. Re-insert motor, check for broken wires, verify motor plugged into connector J1 (labeled “MOTOR”) on control valve circuit board and reset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)
  2. Remove piston and seal assemblies for inspection and repair or replacement and reset control valve
  3. Re-seat drive bracket assembly and reset control valve

1004 – motor ran too long, timed out trying to reach home position| A) Drive bracket not snapped in place properlyB)       Center reduction gear reflector dirty|

  1. Re-seat drive bracket assembly and reset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)
  2. Clean reduction gear reflectors (page 17)

1006 – MAV/SEPS/ NHBP/AUX MAVmotor ran too long, looking for park position| A) Control valve not programmed for ALT OFFB)       Obstruction in control valve|

  1. Enter cycle programming level and verify second parameter is set to ALT oFF
  2. Remove piston and seal assemblies for inspection and repair or replacement andreset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)

1007 – MAV/SEPS/ NHBP/AUX MAVmotor ran too short looking for park position| A) Control valve not programmed for ALT OFFB)       Obstruction in control valve|

  1. Enter cycle programming level and verify second parameter is set to ALT oFF
  2. Remove piston and seal assemblies for inspection and repair or replacement and reset control valve (hold “NEXT” and “REGEN” buttons for 3 seconds)

TEN YEAR LIMITED WARRANTY

WARRANTY
Franklin Water Treatment, LLC, warrants this water conditioner against any defects that are due to faulty material or workmanship during the warranty period. This warranty does not include damage to the product resulting from accident, neglect, misuse, misapplication, alteration, installation or operation contrary to printed instructions, or damage caused by freezing, fire, flood, or Acts of God. From the original date of consumer purchase, we will repair or replace, at our discretion, any part found to be defective within the warranty period described below. Purchaser is responsible for any shipping cost to our facility and any local labor charges.

  • One year on the entire water conditioner
  • Five years on the control valve(except the seal & spacer kit which is a wear & tear component)
  • Five years on the brine tank
  • Ten years on the mineral tank

GENERAL CONDITIONS
Should a defect or malfunction occur, contact the dealer that you purchased the product from. If you are unable to contact the dealer, contact Franklin Electric Co., Inc., Water Treatment Division @ (260)693-1972. We will require a full description of the problem, model number, date of purchase, and selling dealer’s business name and address.

We assume no warranty liability in connection with this water conditioner other than specified herein. This warranty is in lieu of all other warranties, expressed or implied, including warranties of fitness for a particular purpose. We do not authorize any person or representative to assume for us any other obligations on the sale of this water conditioner.

FILL IN AND KEEP FOR YOUR RECORDS

Franklin Water Treatment, LLC
12630 U.S. 33 North, Churubusco, IN 46723
Phone: (260)693-1972 Fax: (260)693-0602

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals