GPS Air PS-2 Dedicated Power Supply Transformer Instruction Manual
- June 12, 2024
- GPS Air
Table of Contents
GPS Air PS-2 Dedicated Power Supply Transformer
Product Information
The PS-2TM air ionization system from GPS Air is a power unit designed for
installation, operation, and maintenance. It is important to read the entire
manual before using the product. This product should only be used as directed
and should not be used unless properly installed.
When using electrical products, it is essential to follow basic safety
precautions. This includes reading and following all safety instructions
provided in the manual and on the product itself. The installation of wiring
and clearances from power and lighting conductors should be done in accordance
with the National Electrical Code, NFPA 70. Qualified person(s) should handle
the installation work and electrical wiring, ensuring compliance with
applicable codes and standards.
The PS-2TM air ionization system comes with a PS-2 Power Supply (1), Cable
Gland (1), and Self-drilling sheet metal screws (4). However, please note that
conduit fitting for incoming AC power, wiring for incoming AC power, and
grommets/glands for any wiring penetrations are not included.
Prior to installation, it is important to review the installation video on the
manufacturer’s website or by scanning the provided QR code. Disconnecting
power to the HVAC equipment is crucial before starting the installation
process, as high voltage is involved.
The wiring of the PS-2TM air ionization system should be done according to the
instructions provided. Metallic conduit used for wiring should be properly
bonded in accordance with the national electric code article 250. For
installations in plenum spaces, only metallic clad conduit should be used for
incoming AC power. Wire colors may vary depending on the incoming AC power and
GPS product.
Product registration is recommended to extend the standard limited warranty on
eligible products from your purchase to 3 years at no additional cost.
Registration can be done on the manufacturer’s website or by scanning the
provided QR code.
For the most up-to-date information and the latest version of the manual, please visit the manufacturer’s website or utilize the provided QR code.
Product Usage Instructions
- Read and fully understand the entire manual before using the PS-2TM air ionization system.
- Ensure that the product is properly installed before use.
- Follow all safety instructions provided in the manual and on the product.
- Refer to the National Electrical Code, NFPA 70, for guidelines on wiring installation and clearances from power and lighting conductors.
- Have a qualified electrician perform the installation work and electrical wiring, adhering to all applicable codes and standards.
- Disconnect power to the HVAC equipment before starting the installation process.
- Use metallic conduit for wiring and ensure proper bonding according to the national electric code article 250.
- In plenum spaces, only use metallic clad conduit for incoming AC power.
- Wire the PS-2TM air ionization system according to the instructions provided, considering wire color variations based on incoming AC power and GPS product.
- Consider registering the product to extend the warranty to 3 years at no additional cost. Registration can be done on the manufacturer’s website or by scanning the provided QR code.
IMPORTANT SAFETY INSTRUCTIONS
When using electrical products, basic precautions should always be practiced including the following
- READ AND FOLLOW ALL SAFETY INSTRUCTIONS.
- Read and follow all instructions that are on the product or provided with the product.
- Reference the National Electrical Code, NFPA 70, specifically for the installation of wiring and clearances from power and lighting conductors.
- Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards, including fire-rated construction.
- WARNING: Risk of Fire. Installation involves special wiring methods to run wiring through a building structure. Consult a qualified electrician.
SAVE THESE INSTRUCTIONS
This manual contains important safety and operating instructions for power units.
- PS-2 Power Supply (1)
- Cable Gland (1)
- Self drilling sheet metal screws (4)
Supplies Not Included
- Conduit fitting for incoming AC power
- Wiring for incoming AC power
- Grommets/glands for any wiring penetrations
Location
Install PS-2 within 100 feet of ionization system to avoid excessive power losses. Take care to not damage wiring when installing away from ionizer.
N OTE : Use temperature – Maximum ambient temperature in which unit shall be used: 160°F/ 70°C.
Review the installation video at our website or scan the QR code opposite.
Installation
WARNING: Make sure power is disconnected to the HVAC equipment before installation. CAUTION! High Voltage.
Step 1.
Remove Screws
Remove two screws from the top cover as shown.
Step 2.
Remove Top Cover
Lift top cover straight up to remove as shown.
Step 3.
Wiring
NOTE: Metallic conduit shall be properly bonded in accordance with the
national electric code article 250. Connect the appropriate conduit and fitting
as necessary for the application.
Route the wires as shown and make connections according to the marking located
on the product. Tighten the fittings to adequately secure the cable and
conduit.
For installations in plenum spaces use only metallic clad conduit on incoming AC power. Wire colors will vary by incoming AC power and GPS product.
Step 4.
Mounting
Using the supplied fasteners mount the PS-2 to an appropriate vertical or
horizontal surface.
Product Registration
By registering your order, the standard limited warranty on eligible products
from your purchase is automatically extended to 3 years, at no additional
cost.
Register your products at www.gpsair.com/product-
registration or scan the QR code.
The information provided in this manual is up to date at the time of printing. Any revisions to this document will supersede the content included. For the latest applicable version of this manual, visit our website or utilize the QR code.
3101 York mont Road · Suite 400 Charlotte, NC 28208 980-279-5622
To access a list of applicable patents, please visit www.gpspatents.com
© 2022 GPS Air
GPS Air is the owner of certain trademarks that appear in our materials.
Please visit www.gpsair.com/trademarks for
a list of our marks.
References
- GPS Air | Optimize Your Indoor Air Quality | GPS Air IAQ Solutions
- GPS Air | Optimize Your Indoor Air Quality | GPS Air IAQ Solutions
- GPS Air | Product Registration
- GPS Air | trademarks