Zip WATER HydroTap G5 Celsius Plus All-In-One BCS Pull Out Tap Instruction Manual
- June 12, 2024
- Zip WATER
Table of Contents
Zip WATER HydroTap G5 Celsius Plus All-In-One BCS Pull-Out Tap
Product Information
The BKL2 HydroTap G5 v1.06 07.23 BCS BCS20 is a versatile and efficient water dispenser that provides hot, cold, chilled sparkling, and boiling water instantly. It features a Command Centre for easy control and a Celsius Plus All-in-One Pull-Out Tap for convenient water dispensing. The HydroTap G5 BCS Home model is shown with the Celsius Plus All-in-One Pull-Out Tap.
Ventilation Requirements
It is important to ensure suitable ventilation for the HydroTap G5. If the
existing ventilation is not adequate, please contact your local service
provider for assistance.
Clearance Envelope
To optimize the installation, position the Tap and the Command Centre as
close together as possible. If an air outlet louvre is required, create a cut-
out in the door or wall towards the top of the cabinet. The clearance envelope
dimensions are as follows:
- Tap Options:
- Celsius Plus All-in-One Pull-Out Tap: 236mm
- Chilled/Sparkling Outlet: 211mm
- Hot & Cold Outlet: 187mm
- Tap Positioning:
- Allow clearance for spout rotation and a cup or teapot.
- Ensure a 4mm buffer pad air space.
- The spray nozzle extends up to 900mm.
- Hose Management System:
- Locate water and electricity outlets away from the wall area directly under the tap.
- Rotate the Hose Management System to align the pull-out hose within the allowable offset (10mm, 30mm, or 50mm from tap center-line).
**Installation Diagrams
**
The installation diagrams provided are for illustrative purposes only. All dimensions are in millimeters unless otherwise specified. The hoses are not shown to scale and cannot be lengthened.
Power Requirements
- Power Outlet: 230-240V, 50Hz
- IEC Flex & Plug
- Air Inlet Grille
Additional Components
- Hot water & mains water isolation valves (not supplied)
- CO2 gas cylinder (for chilled sparkling water)
Important Notes
- Ensure proper ventilation and clearance for optimal performance.
- Follow the provided instructions for hose management and tap positioning.
- Refer to the user manual for detailed installation guidelines.
Product Usage Instructions
-
Ensure suitable ventilation for the HydroTap G5. If the existing ventilation is not adequate, contact your local service provider.
-
Position the Tap and the Command Centre as close together as possible.
-
If required, create a cut-out for the air outlet louver towards the top of the cabinet door or wall.
-
Select the desired Tap option:
-
Celsius Plus All-in-One Pull-Out Tap: Pull out the tap to
dispense water into the sink, allowing clearance for a cup or teapot. -
Chilled/Sparkling Outlet: Dispenses chilled sparkling water.
-
Hot & Cold Outlet: Dispenses hot and cold water.
-
-
Ensure there is sufficient clearance for spout rotation and a cup or teapot.
-
Leave a 4mm buffer pad air space around the Tap.
-
The spray nozzle can extend up to 900mm.
-
Locate water and electricity outlets away from the wall area directly under the Tap for ease of installation.
-
Rotate the Hose Management System to align the pull-out hose within the allowable offset (10mm, 30mm, or 50mm from tap center-line). Refer to the instructions supplied for detailed guidance.
-
Ensure proper power supply with a 230-240V, 50Hz power outlet and an IEC Flex & Plug.
-
If using chilled sparkling water, connect a CO2 gas cylinder (not supplied).
-
If necessary, install hot water & mains water isolation valves (not supplied).
Ventilation requirements
Contact your local service provider if ventilation is not suitable
Clearance envelope
Position the Tap and the Command Centre as close together as possible.
Tap Positioning
- Position the Tap to dispense into the sink, allowing clearance for a cup or teapot.
- Allow clearance for spout rotation
SCALE 1:5
ALL DIMENSIONS IN MM UNLESS OTHERWISE SPECIFIED. INSTALLATION DIAGRAMS ARE FOR
ILLUSTRATIVE PURPOSES ONLY. HOSES ARE NOT SHOWN TO SCALE AND CANNOT BE
LENGTHENED.
HydroTap Tap options
Celsius Plus All-in-One Pull-Out Tap
Hose Management System
- For ease of installation, the wall area directly under the tap and to either the right or left side, as shown, should be clear of obstructions. Locate water and electricity outlets elsewhere.
- Rotate the Hose Management System to align the pull-out hose within the allowable offset. Refer to the instructions supplied.
HydroTap G5 BCS Home
Shown with Celsius Plus All-in-One Pull-Out Tap
BKL2 HydroTap G5 v1.06 07.23 BCS BCS20
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>