THE HOME DEPOT MC610 Aluminum Medicine Cabinet Instruction Manual
- June 4, 2024
- THE HOME DEPOT
Table of Contents
**THE HOME**
DEPOT MC610 Aluminum Medicine Cabinet
Instruction Manual
MC610 Aluminum Medicine Cabinet
Assemble Instruction
Aluminum Medicine Cabinet MC610
List of Parts
1 | Cabinet | x1 |
---|---|---|
2 | Top Bracket Soporte | |
3 | Bottom Bracket | ![THE HOME DEPOT MC610 Aluminum Medicine Cabinet - fig |
11](https://manuals.plus/wp-content/uploads/2022/09/THE-HOME-DEPOT-MC610
-Aluminum-Medicine-Cabinet-fig-11.png)
4| Side Mirror|
A| Side Mirror Screw|
B| Wall Anchor|
C| Mounting Screw|
Tools Needed
Rough Wall Opening
Overall Size | Rough Wall Opening |
---|---|
24 in.(W) X 30 in(H) X 5 in.(D) | 23-1/4 in(W) X 29-1/4 in. (H) X 3-7/8 in. (D) |
Use a 1/4 in. (6 mm) drill bit for drywall anchor installation. Use a 1/8 in.
(3mm)drill bit for direct stud installation.
NOTE: If installing into material other than drywall or into a stud,
consult a professional for proper installation.
Step 1
Measure and mark two bottom mounting holes on the wall corresponding to the
pre-drilled hole locations in the bottom mounting bar.
Draw a horizontal line connecting the two bottoms marked location.
the line should be level. adjust to level if necessary.
Use a 1/4 in. (6 mm) drill bit for drywall anchor installation. Use a 1/8 in.
(3mm) drill bit for direct stud installation.
NOTE: If installing into material other than drywall or into a stud,
consult a professional for proper install-lation.
Step 2
Attach the bottom mounting bar hanger to the wall with two mounting
screws from the hardware pock.
Step 3
Install the top bar hanger in the same way as the bottom bar hanger.
Follow the mounting instruction
Put the cabinet on the bottom bar hanger and hold the cabinet, please make sure that the hanger must match the track from the bottom board of the cabinet
RECESS MOUNT INSTRUCTIONS
NOTE: Rough opening is not an exact measurement. The extra space allows
the cabinet to be inserted into the opening. Add shims to level and tighten
space if necessary. Additional framing might be required.
STEP 1
NOTE Before cutting the rough opening, check for pipes, electrical
cables, or heating ducts. If It is required to remove part of the stud, make
sure that the wall is not a load-bearing wall. Prepare the opening In the wall
for the cabinet body. Make sure that there Is support on both sides of the
opening to attach the cabinet body, as shown.
NOTE: The cabinet height should be a minimum of 2 in. above the faucet.
STEP 2
Position the cabinet body in the rough wall opening. Make sure that
the cabinet body flange covers the wall opening uniformly. Secure both sides
of the cabinet body to the wall supports using mounting screws.
NOTE: The cabinet body must be level for the door to work properly.
SHELF ADJUSTMENT
For your convenience, adjustable shelves have been preinstalled. In order to adjust shelf location:
- Carefully slide the shelf out from the shelf clips. See fig.1.
- Loosen each shelf clip screw (two for each shelf) and slide to the desired Iocation. See fig 2.
- Carefully slide the shelf into the shelf clips making sure the shelf is level and retighten shelf clip screws.
HINGE ADJUSTMENT
SIDE-TO-SIDE: The door is adjustable side to side by turning screw A
clockwise or counterclockwise.
UP-DOWN : Loosen screw B on both top and bottom of the hinge plate. Raise
or lower the door to the desired position and re-tighten both screws.
IN-OUT: Loosen screws C on both top and bottom hinges. Move the door in
or out to desired position and re-tighten.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>