V-TAC VT-543 LED Lighting Installation Guide
- June 4, 2024
- V TAC
Table of Contents
V-TAC VT-543 LED Lighting
INTRODUCTION & WARRANTY
Thank you for selecting and buying the V-TAC product. V-TAC will serve you the best. Please read these instructions carefully before starting the installation and keep this manual handy for future reference. If you have any other queries, please contact our dealer or local vendor from whom you have purchased the product. They are trained and ready to serve you at their best. The warranty is valid for 2 years from the date of purchase. The warranty does not apply to damage caused by incorrect installation or abnormal wear and tear. The company gives no warranty against damage to any surface due to incorrect removal and installation of the product. The products are suitable for 10-12 Hours of Daily operation. Usage of the product for 24 Hours a day would void the warranty. This product is warranted for manufacturing defects only. Our products are designed to comply with the recommendations of BS EN 60598-1:2008 code of practice for emergency lighting and should be installed by a competent person in accordance with the relevant regulations. Before installation of any type of emergency lighting always seek the advice of the local fire prevention officer (or equivalent authority).
WEEE Number: 80133970
WARNING!
- Please make sure to turn off the power before starting the installation.
- The light source of this luminaire is not replaceable, when the light source reaches its end of life the whole luminaire should be replaced.
- Installation should only be done by a certified electrician.
MULTI-LANGUAGE MANUAL QR CODE
Please scan the QR code to access the manual in multiple languages.
Caution , risk of electric shock.
DISPOSAL
This marking indicates that this product should not be disposed of with other household wastes.
LUMINAIRE INFORMATION
- Watts : 3W
- Lamp Type : 16 SMD LEDs, Wall-Bulkhead
- Lumens: 140 LM
- Input Power : AC: 220-240V, 50/60Hz
- Protection Rating : IP65
- Operation Time: >3 Hours (Maintained)
- Charging Current: 70~150mA
- Discharging Current: 100~450mA
- Battery type : Ni-Cd 3.6V 1200mAh
- Recharge time : 12 hours (Initial charge: 36 hrs)
- Indicator: Green Light Indicator
- Material: PC Cover
- Product size : 346x107x60 mm(LxWxH)
- 4 Legends included
OPERATION DIAGRAM
For Maintained Operation – Maintained operation, link L (Switched Live) to
terminal Ls (perma-nent Live). If ‘Ls’ is not connected, the fitting works as
non-maintained
All self-contained emergency lighting luminaires require a continuous (un-
switched) 220V-240V single phase 50hz (L) supply to keep the inbuilt batteries
charged.
Note : the LEDs contained in this fitting are not designed to be replaced.
INSTALLATION OF THE FITTING
Installation should only be carried out in accordance with the current edition
of the “Regulations for Electrical Installations” EN61547 and with the
requirements of BS
Don’t do a high voltage insulation test on the luminaire as this may damage
the control gear.
Before starting the installation ensure that the electricity supply is
isolated and that it cannot be reenergized accidentally.
- Remove the front diffuser from the body by removing the 2 fixing screws.
- Release the gear tray by easing the plastic clips away from the tray and by lifting the tray away from the base.
- There are four cable entry holes on this fitting. One on the rear and one on each side of the plastic body. Drill out the intended cable entry hole suitable for your installation.
- Drill out the two fixing holes located on the back of the luminaire, hold the luminaire in the required location and use these holes as a template mark on the location of the fixing holes on the wall/ceiling (Please note when drilling fixing holes in the wall/ceiling be careful not to damage concealed wires or pipes.)
- Fix the luminaire to the wall/ceiling using suitable screws and fixings (not supplied).
- Connect the mains supply wiring as follows.
- For component protection in transit and user safety the luminaire battery fuse is supplied in the fitting.
- When all connections have been made reassemble the fitting completely.
- Restore the supply and check that the Green LED indicator illuminates to confirm the batteries are charging. There are three possible reasons when the green LED indicator does not light up:
- there is no power supply AC220-240V,
- the batteries are not properly connected to the PCB,
- the batteries are not being charged.
- Allow a short period for partly charging the batteries and then isolate the mains supply to the fitting in order to check the correct operation of the fitting in emergency mode. After 36 hours on a continuous charge (and only at a safe time) a mains failure should be simulated to ensure that the fitting illuminates for its rated emergency duration.
- The luminaire will have a 1-hour backup after 14 hours of charging and will be fully charged after 24 hours (first charge 36 hours)
MAINTENANCE
Once the luminaire no longer meets the rated emergency operation the batteries
must be replaced after a maximum of 4 years in service.
Repairs should only be carried out by a qualified person. Please recycle
disposal of replaced components where facilities exist. Special care should be
taken if it’s required to open the fitting as the fitting may still be “live”
even though the mains supply has been isolated. In these circumstances
immediately disconnect the battery supply.
Servicing and cleaning should only be carried out after the fitting has been
made electrically safe. Cleaning of luminaires should be carried out at
regular intervals not only to ensure good optical performance but also to
ensure that dirt does not accumulate to such an extent as to impair the
electrical or thermal safety of the fitting.
In case of any query/issue with the product please reach out to us at support@v-tac.eu V-TAC EUROPE LTD, Bulgaria, Plovdiv 4000, bul.L.Karavelow 9B
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>