Supplies4Heat Cornel Lacquer 4 Column Steel Multi Column Radiator Instructions
- June 4, 2024
- Supplies4Heat
Table of Contents
Supplies4Heat Cornel Lacquer 4 Column Steel Multi Column Radiator
LACQUER MULTI COLUMN Fitting Instructions
Steel Multi Column Radiator, Horizontal and Vertical
Please read these instructions and terms and conditions carefully prior to
installation.
Failure to do so may invalidate the warranty.
Drawings
The correct number of Universal Wall Brackets (which act as wall ties too) are supplied with each order; extra can be ordered if required.
Fig 1 – Bracket Positions
Universal Wall Brackets should be logically positioned to prevent Steel Multi
Column radiators from falling away from the wall. If more than 4 brackets have
been supplied these should be spaced evenly.
x = typical positions for Universal Wall Brackets (which also act as Wall
Ties)
Fig 2 – Multi Column Orientation
The correct number of Universal Wall Brackets (fig 3) which also act as wall ties with Slip on Feet (fig 4) are supplied with each order; extra can be ordered if required.
Fig 3 – Universal Wall Brackets
Fig 4 – Slip on Feet
Fit onto sections, we recommend one on either end and the remainder evenly
spaced.
Pipe Centres
Pipe centres left to right = width of radiator plus valves
Pipe centres from wall =
Mounting Option| 2 Columm| 3 Columm| 4 Columm| 5
Columm| 6 Columm
---|---|---|---|---|---
Universal Wall Brackets| 56mm| 74mm| 93mm| 112mm| 131mm
Slip on Feet| 56mm| 74mm| 93mm| 112mm| 131mm
Unpack & Inspect
This product should have reached you in perfect condition. Please carefully unpack and inspect this radiator and all fittings. Your point of purchase must be notified of any shortages or damage within 28 days of delivery.
Contents
You should have:
- 1 Radiator
- Universal Wall Brackets (which act as wall ties)
- 1 Diverter
- 4 Bushes
- 1 Manual Airvent
- 1 Blank Plug
Plus your chosen mounting option:
- Universal Wall Brackets
- Slip on Feet
PLEASE NOTE:
We will supply the correct number of brackets and wall ties with each order; prices for extra brackets / feet & wall ties are available on request.
You will need:
- Tape measure
- Electric drill and bits
- Spirit level
- Suitable screws and plugs
Orientation & Fitting Bushes
Steel Multi Column radiators have specific left & right hand threaded bushes &
these can be easily damaged if forced or incorrectly fitted (this will
inevitably cause leaks).
Your radiator has 4 open water ways, protected by plastic bungs, 3 black and
one red, the top of the radiator is indicated by the red plastic bung. The
bungs must be removed to allow the bushes to be fitted. Bushes require a dry
fit connection only; you must not use any Compound materials (e.g. Jet Blue)
or Plumbers Hemp.
Please be aware that the bushes are left and right-handed so you will need to
look closely at the threads to identify which side to fit the bushes.
Fit Diverter
The spring diverter is recommended for all radiator sizes, however, please be
aware it is essential for all radiators over 1000mm high.
The diverter is inserted into the lower water way, the metal cap goes in first
followed by the spring and
is located pushed tight up against the first internal barrel nipple and held
in place by a bush. The flow must enter this end first (please see diagram
right).
Mark Bracket Positions
Universal Wall brackets are typically positioned two or three sections in from
either end (please see fig 1 on other page). The universal wall bracket is a
clamp style with a separate mounting plate that is fixed to the wall. When
securing the brackets to the radiator wrap masking tape around your
screwdriver to reduce the risk of damaging the paint finish. Fit the wall
brackets on to the back of the radiator two sections in from each end.
PLEASE NOTE: It is essential that all brackets are level to ensure a vertical
alignment for connecting the pipework.
Fix Feet
For slip on feet fix the wall ties in place on the top of the radiator and
place the radiator in situ, mark the wall ties position, fix the wall plates,
then position the radiator and secure the wall ties to the wall plates.
PLEASE NOTE: It is essential that all brackets are level to ensure a vertical
alignment for connecting the pipework.
Hang & Commission
With all bracket positions marked and/or fixed, the radiator is placed in its
final position for valve and pipework connections. Please ensure the flow is
connected to the correct end nearest the diverter (please see Drawing 2 on
another page). When commissioning your radiator on an indirect/closed system
we recommend using a suitable quality & quantity of mixed metal inhibitor to
protect against scale & corrosion.
Damage caused to systems not protected by a suitable inhibitor will not be
covered by the manufacturer’s guarantee.
Technical Specifications
- Materials Mild Steel.
- Connections ½” flow and return.
- Test pressure 13 Bar
- Testing authority EN442
- Maximum operating pressure 8 Bar
- Maximum working temperature 95ºC
- Packaging Wrapped in polyethylene with cardboard protectors.
PLEASE NOTE: Systems using micro bore pipework must have adequate pressure and flow rates for the number and style of radiators on the system.
Guarantees & Liabilities
This product is guaranteed for 10 years. The guarantees in all cases are subject to the products being installed in accordance with British and or European standards as well as these fitting instructions. The guarantees in all cases are restricted to the free-of-charge replacement or repair of the failed product only. Our liability will under no circumstances extend beyond the repair or replacement of the product supplied by us. Claims for either labor in replacement or damage to property are not admissible. Any goods that are returned, in the event of a problem, will belong to us.
Terms & Conditions
- All products must be inspected once removed from the packaging and your point of purchase notified within 28 days of delivery of any scratches, blemishes or other damage. Your point of purchase will then agree on appropriate action.
- Imperfect radiators should therefore not be fitted and your point of purchase will not accept responsibility for the replacement of scratched or damaged radiators once they have been fitted. This includes any consequential loss or cost of fitting.
- If your point of purchase is not notified within 28 days of the date on the signed delivery note then it will be deemed that they have fully complied with their obligations and claims will not be considered.
- Failure to comply with any of the above may invalidate any claims. Your point of purchase recommends that after you check the product on delivery that it is stored in its packaging to prevent damage prior to installation, they cannot accept responsibility for items damaged after delivery.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>