GTI GEVCT101 EV Charging Tester User Manual

June 12, 2024
Gti

GTI GEVCT101 EV Charging Tester User Manual **

**

EV Charging Tester

The EV charging tester is an equipment that determines the status of rapid/standard charges, high-voltage relay, and the presence of any abnormality in rapid and high-voltage charging path of the electric vehicle

Components

Precautions

Precautions when handling high-voltage parts

  • Before inspecting or repairing high-voltage system, make sure to separate the safety plug to cut off the high voltage.
  • Make sure to remove metal substances (watch, ring, and other metal products, etc.) from your body as they may cause high-voltage short circuit, which causes human and vehicle damages.
  • Before starting any operation related to high voltage, please wear personal protective equipment for safety accident prevention.
  • Please make sure that persons other than the operator wearing the protective equipment are prohibited from touching any part related to high-voltage parts.

Precautions when utilizing the product

  • Remove foreign substances from the component and keep its cleanliness before and after using the equipment.
  • Make sure you familiarize yourself with contents of the manual before use, in order to follow the procedures and instructions.
  • Before using the equipment, please familiarize yourself with safety instructions for vehicle management, which were issued by the manufacturer of the vehicle.
  • Use the equipment only in a well-ventilated space, and make sure to weak protective equipment (protective glasses and gloves, etc.).
  • If the equipment is damaged by external shock, immediately stop using the equipment. If the equipment needs to be repaired, make sure to request the equipment manufacturer to perform the repair work. (Abnormal repair may become the cause of equipment damage)
  • The equipment must not be exposed to rain or snow.
  • The equipment must not be used for purposes other than the purpose of its manufacture.
  • Do not leave the equipment being installed in the vehicle.
  • If you do not use the equipment within its operating temperature range (0 – 40 ℃), it may become the cause of its breakdown

| These connectors are used for CP/PD voltage check and only trained professionals should use (or access).Precaution
---|---

Components

Name Component Major function
EV charging tester ![Components](https://manuals.plus/wp-
content/uploads/2023/07/Screenshot_3-1092.jpg)
  1. Controls the conditions for the charging test.
  2. Measures high voltage/current.

GDS-Mobile| |

  1. Performs the test sequence.
  2. Indicates the test measured values.

VCI II| |

  1. Performs the vehicle diagnostic communication. (Connects the OBD terminal of the vehicle.)

Detailed description of the EV Charging Tester LED

Name

|

Major function

|

LED status

---|---|---
DC LINE| Indicates the test results on rapid charging line.| ****

OK

|

Charging Tester LED

NG

AC LINE| Indicates the test results on standard charging line.|

Charging Tester LED

OK

|

Charging Tester LED

NG

ERROR| Indicates the occurrence of system error.|

Charging Tester LED

OK

|

Charging Tester LED

NG

BT/Power| –  Indicates the power.

–    Indicates the connection status between the diagnostic apparatus and the test equipment.

| Charging Tester LED

Connected

|

Charging Tester LED

Not connected (the light flickers once a second)

Advance Preparation

Entering into the function screen

Phase 1

Select [S/W Management].

Reference

Before performing the function, VCI II must be connected to OBD connector on the vehicle.


P hase 2

Select the type of vehicle to be measured.

Phase 3

Select [Vehicle Charging Controller] -> [Charging Line Test] menu.

Connection of the equipment

Phase 1

After checking the purpose and condition of the EV charging test, press button at the bottom of the screen.

P hase 2

Press Button button to connect the charging test equipment.

Connection

Connection

Phase 3

Select the equipment in the research result.

Connection

Phase 4

After the selected equipment is registered in “equipment currently being connected”, press button at the bottom of the screen.

Connection

Phase 5

Once the BT signal of the equipment is connected normally, “BT/Power” LED of the equipment main body will be turned on with blue light.

Connection

Major Functions

Main screen

It shows major functions of the EV charging line test, and the users can run a desired function by touching it.

Connection

S elf-test on the test equipment

Menu Description of function
**** This is a function for checking whether there is abnormality in the

charging gun when an error occurs while the main test function is being operated, or if thereis no change in voltage in connection test.

Description

Once you enter into the function screen, the self-test will be run right away, and the results will be shown on the screen after  pproximately 20 seconds.

Functions

Connection

Reference

Please run the corresponding function only after removing the charging test gun from the inlet

Notification

The message below will appear when NG occurs.

Description

Charging gun connection test

Menu Description of function
**** The following 3 different functions will be performed as the main test

functions:1.     Rapid charge relay test2.     Rapid charging line test3. Standard charging line test

The table at the top of the screen shows voltage value per operation and test results. The graph in the middle of the screen shows change in CP/PD voltage values of the controller, which are measured in real time through the diagnostic communication

Description

Determination condition

Korea / North America (CCSI) Measured Value Determination
CP 9V±0.3 OK
PD 1.5V±0.3 NG
Europe (CCS2 ) Measure Value Determination
--- --- ---
CP 9V ± 0.3 OK
PD  3V ±0.3 NG

Charging line test

Menu Description of function
**** The following 3 different functions will be performed as the main test

functions:1.     Rapid charge relay test2.     Rapid charging line test3. Standard charging line test

Rapid charge relay test

This is a test that checks if there isabnormality in the rapid charge relay operation through a high-voltage rapid charge port.

Description

c Determination condition

Rapid charging line test

This is a test that checks whether there is abnormality in the rapid charging line that goes through [high-voltage battery -> inverter -> charge port] through the path of the high-voltage rapid charge port

Description

Determination condition

Comparison between the charging equipment measured values and diagnostic communication values

Reference

If the test result is NG, it will receive the breakdown status from the vehicle to indicate the problematic part as red light on the screen, and display the AS response method. (Only the vehicle models after IONIC 6 can operate this function)

S tandard charging line test

This is a test that checks whether there is abnormality in the standard charging line, which goes through [high-voltage battery -> *ICCU -> charge port] through the path of standard charge port.

※ ICCU : Integrated Charging Control Unit

When you enter into the function screen, the test will be run with a fixed default value of 8A. Then, theuser can change the current value to be measured by touching a desired current value (6, 8, 10, or 12 A) to proceed the measurement.

Determination condition

The standard charging will be initiated and the running current value (A) will be measured. (Error range 15%)

Notification

In the case of 12 A, using a power strip may lead to causing a safety accident. Thus, the following notification will be shown, and the test will be conducted only when the user approves it.

Determination condition

Notification

Battery charging current is adjusted to 90% – 60% depending on the user’s charging environment and battery life. (The current values between 3 and 5 A can also be charged)

Once the measurement is completed, click button to close the test

Test results

After the test is closed, you can check the entire test results that were measured.

Test results

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures

  • Reorient or relocate the receiving antenna.
  • Increase the separation between the equipment and receiver.
  • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
  • Consult the dealer or an experienced radio/TV technician for help.

Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals