Introduction
Thank you for choosing the $3150-8T2F L2+ Switch. This guide is designed to
familiarize you with the
layout of the switch and describes how to deploy it in your network
Accessories
-
Power Cord x 1
-
Console Cable x1
-
Mounting Bracket x2
-
Rubber Pad x4
-
M3 Screw x8
-
Grounding Cable x1
Hardware Overview
Front Panel Ports
Ports | Description |
---|---|
RJ45 | 10/100/1000BASE-T ports for Ethernet connection |
SFP | SFP pons for IG connection |
CONSOLE | An RJ45 console port for serial management |
Front Panel LEDs
LEDs | State | Description |
---|---|---|
SYS | Solid Green | The system is being started up. |
Blinking Green | The system works well. | |
Off | The system is not working. | |
PWR | Solid Green | The switch is powered on. |
The switch is powered off. | ||
RJ45 | Solid Green | The port is running at J 000Mbps. |
Solid Orange | The port is running at J 0/J 00Mbps. | |
Off | The port is not linked. | |
SFP | Solid Green | The port is running at J 000Mbps. |
Off | The port is not linked. |
Front Panel Button
Button | Description |
---|---|
Reset | Press the button for 6s to restore the factory default settings. |
Back Panel
Installation Requirements
Before the installation, make sure that you have the following condi ready:
- Phillips screwdriver, related bolts and ESD tools.
- Standard-sized, 19″ wide rack with a minimum of 1U height available.
- Category 5e or higher RJ45 Ethernet cables for connecting network devices.
Site Environment
- Make sure that the temperature of the installation site is maintained at 0°C~50°C.
- Make sure that the relative humidity of the installation site is maintained at 10%~90%.
- Theinstallation site must be free from leaking, dripping water, heavy dew, or humidity.
- Keep the installation site dust-free.
- Theinstallation site must be well-ventilated. Make sure that there is adequate airflow around the switch.
- Make sure that the s level and stable to avoid any hazardous conditions.
- Make sure that the rack and working platforms are well-earthed.
Mounting the Switch
Rack Mounting
-
Secure the mounting brackets to the two sides of the switch with eight M3 screws.
-
Install the switch on the rack with four M6 screws and cage nuts.
Desk Mounting
-
Attach four rubber pads to the bottom.
-
Place the switch on the desk.
NOTE: Do not place heavy objects on the switch.
Grounding the Switch
-
Connect one end of the grounding cable to a proper earth ground, such as the rack in which the switch is mounted.
-
Secure the grounding lug to the grounding point on the back panel of the switch with the screw and washers
CAUTION: The earth connection must not be removed unless all supply connections have been disconnected.
Connecting the RJ45 Ports
-
Connect an Ethernet cable to the RJ45 port of a computer, printer, network storage or other network devices.
-
Connect the other end of the Ethemet cable to the RJ45 port of the switch.
Connecting the SFP Ports
-
Plug the compatible SFP transceiver into the SFP port.
-
Connect a fiber optic cable to the fiber transceiver, Then connect the other end of the cable to the other fiber device.
Connecting the Console Port
-
Insert the RJ45 connector into the R4S console port on the front panel of the switch.
-
Connect the DB female connector of the console cable to the serial port on the PC.
Connecting the Power
-
Plug the AC power cord into the power port on the back of the switch.
-
Connect the other end of the power cord to an AC power source.
WARNING: Do not install the power cord while the power is on.
Configuring the Switch
Configuring the Switch Using the Console Port
Step 1: Connect a computer to the console port of the switch with the
console cable.
Step 2 Start the terminal simulation software, such as HyperTerminal on
the computer.
Step 3: Set the parameters of the HyperTerminal: Baud rate to 115200,
Data bits to 8, Parity to None, and Stopbits to 1
Step 4: After setting the parameters, click Connect to enter.
Troubleshooting
The Power System Is Not Working
- Checkif the power cord is connected correctly.
- Checkif the power supply of the switch matches the required power supply.
The Port Is Not Linked
- heckif the cable is correctly connected.
- Checkif the peer connection is normal.
- Checkif the power cord is connected correctly.
- Checkif the power supply of the switch matches the required power supply.
The Console Port Is Not Working
Check if the console port s set to a baud rate of 9600 bps, eight data bits,
no sum check bit, one stop bit and no traffic control.
Online Resources
- Download https://www.fs.com/products_supporthtmi
- HelpCenter https://www.fs.com/servicelfs_supporthtmi
- ContactUs https://www.fs.com/contact-us.htmi
Product Warranty
FS ensures our customers that for any damage or faulty items due to our
workmanship, we willoffer a
free return within 30 days from the day you receive your goods. This excludes
any custom-made items
or tailored solutions.
Warranty: The switch enjoys a 4-year limited warranty against defects in
materials or
‘workmanship. For more details about the warranty, please check at
https://www.fs.com/policies/warranty.html
Return You want to return the item(s), information on how to return can
be found at
https://www.fs.com/policies/day_return_policy.html
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>