QCELLS Q.PEAK DUO ML-G10.X Solar Module User Manual

June 12, 2024
QCELLS

QCELLS Q.PEAK DUO ML-G10.X Solar Module

QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-product

Product Information

Q.PEAK DUO ML-G10.X Solar Module Series

The Q.PEAK DUO ML-G10.X solar module series is a high-performance solar module manufactured by Hanwha Q CELLS GmbH (referred to as Qcells). These solar modules allow you to directlyconvert the sun’s energy into environmentally- friendly solar electricity. With careful installation and operation, you can maximize the performance of these crystalline solar modules.

This installation and operation manual provides detailed instructions for the safe installation and operation of the Q.PEAK DUO ML-G10.X solar module series. It is important to read andfollow these instructions carefully to avoid property damage and physical injury.

Please retain this manual for the life of the solar modules and make it available to the operator at all times. It should also begiven to all subsequent owners or users of the solar modules. Any supplements received from the manufacturer should be included.

For additional information, you can visit the Qcells website at www.qcells.com.

Product Usage Instructions

1. Planning

  • Review the technical specifications of the Q.PEAK DUO ML-G10.X solar module series.
  • Ensure that all requirements for installation are met.
  • Consider the available mounting options for proper installation.
  • Create an electrical layout plan for connecting the modules.

2. Installation

  • Prioritize safety during transportation and handling of the solar modules.
  • Prepare the installation site according to the provided instructions.
  • Follow the recommended steps for module installation.

3. Electrical Connection

  • Ensure safety measures are in place during the electrical installation.
  • Follow the electrical installation safety guidelines provided.
  • Properly connect the modules according to the instructions.
  • Perform necessary checks and tests after completing theinstallation.

4. Grounding

Follow the grounding instructions provided to ensure proper electrical grounding of the solar modules.

5. Faults and Defects

Refer to the manual for information on identifying and addressing faults and defects that may occur during the operationof the solar modules.

6. Disposal

Follow the recommended guidelines for the proper disposal of the solar modules when they reach the end of their life cycle.

7. Maintenance and Cleaning

Refer to the maintenance and cleaning instructions provided toensure the optimal performance and longevity of the solar modules.

For any further questions or concerns, please contact your system supplier or refer to the Qcells website for additionalinformation.

Introduction

With solar modules from Hanwha Q CELLS GmbH (hereafter referred to as “Qcells”) you can directly transform the sun’s limitless energy into environmentally-friendly solar electricity. In order to ensure the maximum performance of your Qcells solar modules, please read the following instructions carefully and observe all guidelines. Non-compliance may result in damage and / or physical injury.
This installation and operation manual (hereafter also referred to as the “Manual”) provides instructions for the safe installation and operation of crystalline solar modules.

  • Please read these instructions carefully before proceeding with your installation.
  • Please retain these instructions for the life of the solar modules. Please ensure that this Manual is available to the operator at all times.
  • This Manual should be given to all subsequent owners or users of the solar modules.
  • All supplements received from the manufacturer should be included.
  • Please observe all other applicable documents.
  • If your questions are not satisfactorily answered in the manual, please contact your system supplier.

Additional information can be found on our website at www.qcells.com.

Intended use
This manual is valid for Africa, Asia, Europe, Latin America, South America. These instructions contain information regarding the safe handling and use of quality crystalline solar modules from Qcells and their installation, mounting, wiring, maintenance and disposal.

Symbols and Labels
The following symbols and labels are used throughout the Manual for ease of use.QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig 1

Safety Regulations
In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations.

Unless otherwise specified by any laws or regulations, the following stipulations must be upheld at all times during the installation, operation, and maintenance of the solar modules:

  • This manual.
  • Other applicable stipulations (such as country-specific regulations for pressure equipment, operational safety, hazardous goods, and environmental protection).
  • Regulations and requirements specific to the system.
  • Any applicable laws and requirements, in particular international, country specific, regional laws and stipulations governing the planning, installation, and operation of solar power systems and work on roofs.
  • Any valid international, national and regional regulations governing work with direct current, especially those applicable to the installation of electrical devices and systems, and regulations issued by the respective energy provider governing the parallel operation of solar power systems.
  • Any international, country specific and regional accident-prevention regulations.
  • Other applicable stipulations provided by the relevant national institutions regarding safety in the installation and operation of electrical items.

Qualified and Skilled Personnel
Both, the installer and operator are responsible for ensuring that the installation (including connection to the grid), maintenance and dismantling are carried out by trained and qualified specialists with approved training certificates (issued by a state or federal organization) for the respective specialist trade. Electrical work may only be performed by an officially certified tradesperson in accordance with the stipulations applicable in the relevant country with regard to standard and regulations (in Germany e. g. DIN standards, VDE regulations) and the stipulations of the local grid operator and / or energy provider.

Validity
These instructions are only valid for crystalline solar modules from the company Qcells as specified at chapter “2.1 Technical specifications”. Qcells assumes no liability for damage resulting from failure to observe these instructions.

  • Please observe the wiring and dimensioning of the system.

  • The installer of the system is responsible for compliance with all necessary safety regulations during set-up and installation.
    Qcells assumes no liability on the basis of these instructions. Qcells is only liable in the context of contractual agreements or in the context of accepted guarantees. Qcells accepts no other responsibility for the functionality and safety of the modules.

  • Please observe the instructions for any other system components that may be part of the complete solar power system. It may be necessary to carry out a structural analysis for the entire project.

Additional information for the Operator

  • Please keep this manual for the entire life of the solar power system.
  • Please contact your system supplier for information concerning the formal requirements for solar power systems.
  • Please be sure to contact the relevant local authorities and energy providers regarding regulations and permit requirements prior to installation of the solar power system. Your financial success depends on the fulfillment of these requirements.

Other applicable documents
In addition to this Manual following technical information are relevant:

Document type

  • Product data sheet
  • Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED MODIFICATION.

Attention!

This marking indicates that this product should not be disposed of with other household waste within the EU. Recycle this product properly to prevent possible damage to the environment or a risk to human health via uncontrolled waste disposal and in order to promote the sustainable reuse of material resources. Please return your used product to an appropriate collection point or contact the retailer where you purchased this product. Your retailer will accept used products and return them to an environmentally-sound recycling facility.

Planning

Technical specifications
For additional information see the relevant datasheet of the module provided at www.qcells.com.

Q.PEAK DUO ML-G10                                      Q.PEAK DUO BLK ML-G10

PRODUCT LINE                                                       Q.PEAK DUO ML-G10+                               Q.PEAK DUO BLK ML-G10+ Q.PEAK DUO ML-G10.a                                   Q.PEAK DUO BLK ML-G10.a

Q.PEAK DUO ML-G10.a+                                 Q.PEAK DUO BLK ML-G10.a+


Type| Q.ANTUM DUO Z| Q.ANTUM DUO Z
Length| 1879 mm| 1879 mm
Width| 1045 mm| 1045 mm
Frame height| 32 mm| 32 mm
Area| 1.96 m²| 1.96 m²
Weight| 22.0 kg| 22.0 kg
Max. system voltage VSYS| 1000 V| 1000 V
Max. reverse current| 20 A| 20 A
Permissible temperature range| –40 °C to +85 °C (–40 °F to +185 °F)
Junction box protection class| IP67 with bypass diode
Connector protection class| IP68
Fire rating based on ANSI / UL 61730| C / Type 2| C / Type 2
Max. test load Push / Pull1| 5,400 Pa / 4,000 Pa| 5,400 Pa / 4,000 Pa
Max. design load Push / Pull1| 3,600 Pa / 2,660 Pa| 3,600 Pa / 2,660 Pa
Certificates| Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module classification: Class II; UL 61730; QCPV
1 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section “2.3 Mounting options“)

QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig 2

Fig. 1: External dimensions and components for
Q.PEAK DUO ML-G10 Q.PEAK DUO BLK ML-G10 Q.PEAK DUO ML-G10.a Q.PEAK DUO BLK ML-G10.a Q.PEAK DUO ML-G10+ Q.PEAK DUO BLK ML-G10+ Q.PEAK DUO ML-G10.a+ Q.PEAK DUO BLK ML-G10.a+
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G10.X

Technical specifications
For additional information see the relevant datasheet of the module provided at www.qcells.com.

PRODUCT LINE                                                      Q.PEAK DUO ML-G10.2                              Q.PEAK DUO ML-G10.4 Q.PEAK DUO BLK ML-G10.4

Type| Q.ANTUM DUO Z| Q.ANTUM DUO Z
Length| 1879 mm| 1879 mm
Width| 1045 mm| 1045 mm
Frame height| 32 mm| 32 mm
Area| 1.96 m²| 1.96 m²
Weight| 22.0 kg| 22.0 kg
Max. system voltage VSYS| 1500 V| 1000 V
Max. reverse current| 20 A| 20 A
Permissible temperature range| –40 °C to +85 °C (–40 °F to +185 °F)
Junction box protection class| IP67 with bypass diode
Connector protection class| IP68
Fire rating based on ANSI / UL 61730| C / Type 1| C / Type 2
Max. test load Push / Pull1| 5,400 Pa / 4,000 Pa| 5,400 Pa / 4,000 Pa
Max. design load Push / Pull1| 3,600 Pa / 2,660 Pa| 3,600 Pa / 2,660 Pa
Certificates| Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module classification: Class II; UL 61730; QCPV
1 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section “2.3 Mounting options“)

QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig 3

Fig. 2: External dimensions and components for Q.PEAK DUO ML-G10.2
Q.PEAK DUO ML-G10.4
Q.PEAK DUO BLK ML-G10.4.

Installation Site
Please note the following guidelines that apply to the installation site:

  • Solar modules are not explosion-proof and are not suitable for use in explosive environments.
  • Do not operate solar modules near highly flammable gas and vapors (e.g. gas tanks, gas stations).
  • Do not install modules in enclosed space.
  • Do not install modules in locations where they may be submerged in water (e.g. floodplains).
  • Do not use modules as a substitute for the normal roofing (e.g. modules are not watertight).
  • Do not install modules in close proximity to air conditioning systems.
  • Do not install modules above 4000 m (13120 ft) altitude above sea level.
  • Contact with saline water (e.g. spray water from the sea) and salt aggregation on the modules must be avoided.
  • Do not bring any chemical substance (e.g. oil, solvent etc.) into contact with any part of the panel. Only substances, which are released by Qcells, are allowed to be used during installation, operation and maintenance.
  • Any installation of modules on surfaces of water is prohibited. This includes installations on floating as well as pile-based platforms. Qcells may extend the coverage of its warranty to such installations, based on a case by case assessment of the system design and location. A prior written consent by the warrantor is required in any case.

The solar modules are designed for the following applications:

  • Operating temperatures from –40 °C to +85 °C (–40 °F to +185 °F).
  • Pull loads up to max. 4,000 Pa and push loads up to max. 5,400 Pa (see chapter “Mounting options”).
  • Installation using a mounting structure for solar modules.

Prevention of Shadowing Effects
Optimal solar irradiation leads to maximum energy output:

  • For this reason, install the modules so that they face the sun.
  • Avoid shadowing (due to objects such as buildings, chimneys or trees).
  • Avoid partial shading (for example through overhead lines, dirt, snow).

Mounting Structure Requirements
The Modules shall be installed and operated on mounting structures that comply with any applicable laws and stipulations as well as with the following:

  • Conform to the necessary structural requirements.
  • Compliant with local snow and wind loads.
  • Properly fastened to the ground, the roof, or the façade.
  • Forces acting on the module are relayed to the mounting substructure.
  • Ensures sufficient rear ventilation of the module.
  • Avoid the usage of different metals to prevent contact corrosion.
  • Allows for stress-free expansion and contraction due to temperature fluctuations.
  • Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads. Additional forces and moments of torque at the mounting positions caused by torsions, displacements or vibrations in the mounting system are not allowed.
  • Ensure that the clamps and the mounting frame are compatible.

Clamp System Recommendations
Use customary clamps that satisfy the following requirements:

Use customary clamps that satisfy the following requirements:

  • Clamp width: ≥ 40 mm.
  • Clamp height compliant with a 32 mm frame height.
  • Clamp depth: 7-12 mm. (applicable for all CL clamping mounting options at section “2.3 Mounting options”)
  • Clamps are not in contact with the front glass.
  • Clamps do not deform the frame.
  • Clamps that satisfy the structural requirements based on the conditions of the installation site according to the applicable regulations and technical standards.
  • Long-term stable clamps that securely affix the module to the mounting frame.

Module Orientation Requirements

  • Vertical or horizontal installation is permitted.
  • Ensure that rain and melting snow can run off freely. No water accumulation.
  • Ensure that the drainage holes in the frame are not covered.
    No sealing.

Mounting options

Fig. 3: Installation options for crystalline Qcells modules. All dimensions are given in mm. Also observe the maximum test loads and clamping range as specified on the following page.
The illustrated installation options apply for both horizontal and vertical module orientation.QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
5 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
6

Specifications

MOUNTING OPTION| POSITION OF CLAMPS* [MM]| TEST LOAD PUSH / PULL [Pa]| DESIGN LOAD PUSH / PULL [Pa]| SAFETY FACTOR
---|---|---|---|---
CL1a| 130 – 350| 5400 / 4000| 3600 / 2660| ****










1.5

20 – 500| 5400 / 3600| 3600 / 2400
20 – 650| 2400 / 2400| 1600 / 1600
CL1b| 300 – 500| 2400 / 2400| 1600 / 1600
CL3| 240 – 350| 4000 / 4000| 2660 / 2660
FB1| 395.5| 5400 / 4000| 3600 / 2660
FB2| 395.5| 4000 / 4000| 2660 / 2660
IP1| –| ****

3600 / 3300

| ****

2400 / 2200

CL5| short side: 20 – 100

long side: 300 – 450

CL6c| outer clamps: 20 – 500

middle clamps: 640 – 1240****

| ****

3600 / 3600

| ****

2400 / 2400

CL6d| short side: 20 – 250 long side:

640 – 1240****

| ****

4000 / 3600

| ****

2660 / 2400

The below mounting options are only possible under certain conditions.

MOUNTING OPTION| POSITION OF CLAMPS* [MM]| TEST LOAD

PUSH / PULL*** [Pa]

| DESIGN LOAD

PUSH / PULL*** [Pa]

| SAFETY FACTOR
---|---|---|---|---
CL2a

(mit Schienen)

| 20 – 100****| 2400 / 2000| 1600 / 1330|

1.5

20 – 300****| 2400 / 1800| 1600 / 1200
CL2b

(ohne Schienen)

| 20 – 200| 2000 / 2000| 1330 / 1330
20 – 300| 1800 / 1800| 1200 / 1200
*      Distance between outer edge of module and middle of the clamp; consider further details below.

**    Loads according to IEC 61215-2:2016 and UL 61730.

***   Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.

****  Rails must not be under the junction box.

MOIUNTING OPTIONS REQUIREMENTS
All The loads in the table are related to the mechanical stability of the

solar modules. The mechanical stability of the mounting system including clamps has to be evaluated by the system supplier. The listed test load values have been determined with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm.

The system installer is responsible for the determination of location-specific load requirements. Ensure that the connection cables of the junction box do not run between laminate and mounting rails.

Modules bend under load. Therefore, sharp objects (e.g. screws, ballast stones, rail ends, rails with burrs or sharp corners) must not be placed near the module backside so as not to touch the laminate under load.

Ensure that the junction boxes do not touch the mounting structure (e.g. shorts rails, ballast, etc.) or the rooftop under load. Clamps or insertion profiles etc. must not touch the glass (even under load).

Unbalanced loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must be removed or avoided by technical measures.

CL1a, CL2a, CL3, FB1, FB2| Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the module and substructure).
CL1a| With push test loads of 5400 Pa: The clamp position is variable in the given range but the distance between the clamps along the long side of the module (span) must not be larger than 1400 mm.
CL1b| Using of short mounting rails are permissible, if they overlap under the module less than 210 mm. Minimum clearance between frame bottom edge and roof top must be ≥ 35 mm.
CL1b, CL2b, CL3, FB2, CL6c, CL6d| A minimum support depth of 15 mm is required on the back side of the module.
CL5| The minimum required support depth on the module backside is 10 mm on long frame side and 15 mm on short frame side.
IP1| Ensure minimum support depth of 15 mm on the backside and 10 mm on the front side of the module.
FB1, FB2| Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for mounting slots (Detail A, Fig.1). Mounting screws and washers should have the same material properties.
CL6c, CL6d| Use of short mounting rails under the modules are permissible, if they do not touch the laminate under load.

Electrical layout

Module Selection
For detailed key electrical data, please refer to the actual data sheet referring to the relevant Module (available at www.qcells.com).
For maximum energy yields, mismatches of specified electric current (IMPP) of more than 5 % should be avoided for all modules connected in series.

Safety Factor
During normal operation, a module may generate a greater current and / or higher voltage than that determined under standardized test conditions. Please use a safety factor of 1.25 for the following:

  • Calculating the voltage measurement values (VOC) of components
  • Calculating the current measurement values (ISC) of conductors
  • Sizing of control systems connected to the outlets of the solar modules
    Please follow the valid national guidelines for the installation of electrical systems.

Series Connection

  • Connection of modules in series is only permitted up to the maximum system voltage as listed in the applicable data sheet of all the relevant modules to be installed.
  • Take into account all possible operating situations and all relevant technical norms and regulations when designing the system. It has to be ensured that the maximum system voltage, including all necessary safety margins, is not exceeded.
  • Take the voltage limit of the inverter into account when determining the maximum number of modules in the string.

Parallel Connection
Modules may be damaged by the occurrence of reverse currents (caused by module defects, ground leaks, or defective insulation).
Ensure that the maximum reverse current load capacityindicated in the data sheet is met.
In order to limit reverse currents that may occur, we recommend using the following safety options:

  1. Layout with a limited number of parallel connected strings :
    Without undertaking further current blocking measures, a maximum of two module strings may be operated in parallel on a single inverter or MPP tracker.

  2. Layout with string fuses :
    Use overcurrent devices (e.g. fuses) according to the relevant standards in each string. Use gPV-fuses according to IEC 60269-6. Observe the maximum permitted number of strings as indicated in the specifications provided by the respective string fuse manufacturer and the technical guidelines.
    NOTE!
    When installing different product versions, the lowest minimum permitted reverse current load capacity applies.

Inverters
Inverters with or without transformers may be used.

Installation

Safety and transport

QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
7 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
8 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
10 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
11 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
12

Preparation of installationQCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
13 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
14 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
15

Module installationQCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
16

Electrical connection

Safety

Danger!

  • Risk of fatal injury due to electric shock!
  • When disconnecting an electric circuit carrying direct current, electric arcs can occur that may result in life-threatening injuries.
  • Do NOT unplug the cable when under load.
  • Do NOT connect any exposed cable ends.
  • Electrical work may only be performed by qualified and skilled personnel (see page 3).
  • A solar module generates electrical current and voltage even at a low intensity of illumination. Sparks and electric arcs may result from the separation of a closed circuit. These can result in life-threatening injuries. The danger increases when several modules are connected in series.
  • Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation.
  • Please follow the valid national regulations and safety guidelines for the installation of electrical devices and systems.
  • Please make sure to take all necessary safety precautions. With module or phase voltages of more than 120 V, the safety extralowvoltage range is exceeded.
  • Carry out work on the inverter and the wiring with extreme caution.
  • Ensure that the modules are disconnected at the inverter prior to separation.
  • Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter.
  • Make sure that the plugs can not be connected unintentionally.
  • Before working on the contacts, check them for safety extralow voltage. QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig 20

Electrical installation safetyQCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
21

Connection of modulesQCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
22 QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
23

After installationQCELLS-Q-PEAK-DUO-ML-G10-X-Solar-Module-fig
24

Grounding

Protective Grounding
The modules must be grounded in accordance with the local statutory regulations.

Faults and defects

Danger!
Risk of fatal injury due to electric shock!
Do not attempt to fix any problems yourself (e.g., glass cracks, damaged cables).
Please contact an installer or Qcells Technical Customer Service Department.

Disposal

  • Do not disconnect modules by yourself.
  • Please contact an installer or Qcells Technical Customer Service Department.
  • Dispose of modules in accordance with the local disposal regulations.

Maintenance and cleaning

Qcells solar modules are known for a long operating life and minimal maintenance effort and expense. Dirt and grime are usually washed away by rain. If the module is fully or partially shaded by dirt or debris (e.g., plants, bird droppings), it needs to be cleaned to prevent a loss of performance.

Maintenance

  • The PV system has to be inspected regularly by certified personnel
  • The time intervals and extent of the inspection can depend on local circumstances (e.g. salt, ammonia content in the air, high humidity etc.).
  • The customer / operator must inform himself about time intervals and extend of necessary inspections. Inspections have to be performed especially after extraordinary events (e.g. storm, hail, high snow loads etc.)
  • During the inspections it has to be checked that the components are secure, undamaged and clean

Cleaning

WARNING!
Risk of injury due to hot and live modules!

  • Only clean modules that have cooled down.
  • Do not carry or wear any electrically conductive parts.

WARNING!
Risk of falling due to unsecured access!

  • Never access the installation area alone or without taking adequate security precautions.
  • Please commission a trade specialist.

NOTE!
Module surface damage may occur!

  • Remove snow and ice carefully without force (e.g. with a very soft broom).
  • Do not scratch off dirt.
  • Module cleaning has to be done by qualified personnel according to the state of the art and taking into account all relevant safety issues and general product properties, e.g., but not restricted to:
    • electrical safety
    • mechanical stability (load limits depending on the actual mounting options)
    • chemical suitability (no effect to any of the module‘s components, e.g. cable, connector, silicone)
    • no abrasive materials.

NOTE!
Dust and dirt are abrasive materials!

  • The situation for each individual project (or type of dirt) must always be professionally evaluated.
    Wrong cleaning may cause damages such as, but not limited to, damages to the glass surface (e.g. scratches) and AR coating, power loss, delamination, loss of frame-to-laminate bond, reduced snow and wind load capability etc.

Apart from the above, each customer is free to choose the method of cleaning. However, possible damages, caused by the cleaning or related to the cleaning tools or agents shall not be covered by the module‘s Product and Performance Warranty. Therefore it is recommended to use only the tools and agents which have already been successfully tested and used with PV modules, to prevent possible damage.
Isopropyl alcohol (IPA) can be used selectively to remove stubborn dirt and stains within one hour after emergence.QCELLS-Q-PEAK-DUO-ML-G10-X-Solar-
Module-fig 26

Subject to change without notice. © Qcells Installation manual solar modules Q.PEAK_DUO_ML-G10.X_2022-10_Rev04_EN

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals