VULCAN Penn Elcom Launches Instructions
- June 12, 2024
- Vulcan
Table of Contents
VULCAN Penn Elcom Launches
INCLUDED IN KIT
ADDITIONAL TOOLS REQUIRED
ASSEMBLY INSTRUCTIONS
- Insert the first vertical rail into the front-to-back rail, ensuring that the fixing holes align.
- Side a second front-to-back rail onto the vertical rail, ensuring that the fixing holes align.
- Simultaneously slot the next vertical rail into both ends of the front-to-back members.
- Tap gently with a rubber mallet against a flat surface, ensuring parts sit square and all fixing holes are aligned.
- Fasten all four parts together with 8 x M5 Rivnuts, using a Bolhoff Rivnut gun.
- Repeat steps 1-5 for the opposite side assembly.
- Slot the first horizontal rail into both side assemblies.
- Slot the opposite horizontal rail into both side assemblies.
- Fasten the first two horizontal rails to the side assemblies with 8 × M5 rivnuts, using a Bolhoff Rivnut gun.
- Slot the next two horizontal rails into the side assemblies.
- Fasten the two horizontal rails to the side assemblies with 8 x M5 revenues.
- Check that all rivets are present and set (8 per face).
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>