UrbanUtilities Network Access Permit Application User Guide
- June 12, 2024
- UrbanUtilities
Table of Contents
- Network Access Permit Application
- KEY NETWORK ACCESS PERMIT (NAP) APPLICATION STEPS
- ADD CONNECTION DETAILS
- ADD METER INFORMATION
- ADD SUPPORTING DOCUMENTS
- REVIEW SUMMARY AND SUBMIT THE NAP APPLICATION
- PAY NAP APPLICATION FEES
- CREATING A DRAFT NETWORK ACCESS PERMIT APPLICATION
- NETWORK ACCESS PERMIT NOTIFICATIONS
- RESPONDING TO INFORMATION REQUESTS
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Developer Services Portal
Network Access Permit (NAP) Application
Quick Reference Guide
Network Access Permit Application
Welcome
We have automated the Network Access Permit (NAP) process and there are 5 key
items to note:
- NAP applications are now made through the Developer Portal.
- NAP fees are required to be paid prior to assessment of the NAP application.
- Shut plan and/or flow control fees (if applicable) will be advised depending on the complexity of the plan/s.
- Meter information (Water only) must be provided with the Network access permit application.
- Network access permit and/or a shut plan will not be issued unless Infrastructure Charges are paid in full.
Note 1: you cannot edit a NAP application once you have submitted it.
Note 2: Email
development.permit@urbanutilities.com.au
if you need to make any changes or have any questions
Note 3: You will be notified via an Information Requests if Urban
Utilities needs further information during assessing your NAP application.
QUICK REFERENCE GUIDE TOPICS
Note: Click on the gear to take you directly to relevant section.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION STEPS
Note: Click on the process steps to take you directly to relevant section.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
HOW TO CREATE A NAP APPLICATION
➢ To submit a NAP application, you must be the Endorsed Consultant or the
Consulting Engineer for the related Water Approval.
➢ The NAP application button will appear in the Construction stage of a Non-
Standard Application.
➢ If a Complex or Trunk Shut Plan is required, then the NAP application button
will also appear from the Design Assessment Stage and will be a requirement of
the overall Design Approval process (Major works).
➢ Make sure you submit your Network Access Permit (NAP) application prior to
completing Construction Stage steps.
➢ Not having the appropriate NAP and or associated Shutplan for construction
works could cause delays to process or penalties.
➢ If you have more than
one NAP application per NonStandard application, they can be found under the
NAP tab of your application.
➢ Log into the
Developer Services Portal and click on the In Progress Applications tile or In
Progress Applications link from the header to find your existing
application.➢ This view will show
the list of applications that are currently in progress.
➢ Click on the dropdown button and then on the View option of the relevant
application you want to prepare the NAP for.➢ Click the Network Access Permit
Application button to start a new NAP application. ➢ Read the guidance text and select your NAP Application and
Permit Type from the drop-down fields.
Note: you can only submit one NAP Application for either Water or
Wastewater. If you need both services, then you will need to submit one NAP
for Water, and another NAP for Wastewater.
➢ Click the Start button.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
ADD CONTRACTOR INFORMATION
➢ NAP Contacts are required for all types of NAP Applications.
➢ NAP Contacts are for the purpose for Urban Utilities to contact the
responsible entities at the site where the live works is taking place.
➢ NAP Contacts will NOT automatically receive any notifications or
correspondence via the portal unless they are added as a contact in the Non-
Standard application.
➢ Adding a Contractor is mandatory for all types of Network Access Permit
Application and only a single Contractor record can be added.
➢ Adding a Principal Contractor is required only if there is a Principal
Contractor on site.
➢ What is the difference between a Contractor and a Principal Contractor?
- Contractor: The person/entity performing the construction works. (Mandatory)
- Principal Contractor: Work Health and Safety Regulation 2011.
Note: if there is a change of Contractor you must notify
development.permit@urbanutilities.com.au Contractor
Information stage
➢ Read the help text for guidance on how to provide Contractor Information for
your NAP Application.
➢ Click the Add button. ➢ Select either the
Contractor or Principal Contractor option from the NAP Contact Type drop-down
field➢ Fill in the required
fields for the Contractor information pop-up screen.
➢ Click the Save button. ➢ Fill in the required fields for the Principal Contractor
information pop-up screen.
➢ Click the Save button.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION Edit a NAP Contact
- Click the Edit button next to the Contact record you want to edit.
- Edit relevant information in the Edit NAP Contact pop-up window and then click the Save button.
Delete a NAP Contact
- Click the Delete button next to the Contact record you want to delete.
- The NAP contact is immediately deleted.
Ready to progress
- Click the Next button to continue with your NAP application.
- Click the Save and Exit button to save your NAP application as a draft and return to it at a later time.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
ADD CONNECTION DETAILS
➢ Connection Details are required for all Type 2 and Type 3 Network Access
Permit Applications (Water and Wastewater).
➢ It is important to get accurate information that matches designs. Wrong
information will cause delays.
➢ We will process and charge one Shut Plan per NAP.
➢ If you have connections in largely different locations requiring different
shut plans, then a separate NAP is required. Connection Details stage
➢ Read the help text for guidance on how to add Connection Details to your NAP
Application.
➢ On the Connection Details screen, click the Add button to
proceed.➢ Fill the required fields
(shown with a red asterisk) in the Add Record pop-up window.
➢ Add any other information to the Final Comments section.
➢ Click the Save button. ➢
You can add multiple connection types. Simply click on the Add button and
repeat the process in step 2.
Note: Refer to the help text on screen for guidance as to when multiple
Connection Details should be submitted. Edit or Delete record
➢ To edit any of the Connection Details you have added, click the Edit button
next to the Connection Details record you want to edit.
➢ To delete any of the Connection Details you have added, click the Delete
button next to Connection Details record to remove. Ready to progress
- Click the Previous button to return to the NAP Contacts screen.
- Click the Next button to continue with your NAP application.
- Click the Save and Exit button to save your NAP application as a draft and return to it at a later time.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
ADD METER INFORMATION
➢ Meter information was normally provided at the Compliance Stage via the
Meter PDF form. Now you will need to provide Meter information at the NAP
stage with the NAP application. It will need to be revalidated at the
Compliance stage to record any changes that has taken place.
➢ Meter Information is only required for Water NAP applications.
➢ All Meter information can be found under the Meter Tab in the Application
tab menu.
➢ Include the current address and future lot number. Meter Information stage
➢ Read the help text for guidance on how to add Metering Information to your
NAP Application.
➢ Click the Add button to add Metering Information for your application.
➢ Fill the required fields
(shown with a red asterisk) in the Add Record pop-up window.
➢ Click the Save button. Add, Clone, Edit or Delete record
-
You can add multiple Meter Details. Simply click on the Add button and repeat the process in step 2
OR -
You can clone a record which allows you to replicate an existing Meter Information record and change items such as the Serial Number. Click the Clone button and update the Clone Record pop-up window, then click the Save button.
Note: The Serial Number on each Meter Information record must be unique. -
To edit any of the Meter Information you have added, click the Edit button next to the Meter Information record you want to edit.
-
To delete any of the Meter Information you have added, click the Delete button next to Meter Information record to remove.
Ready to progress
- Click the Previous button to return to the Connection Details screen.
- Click the Next button to continue with your NAP application.
- Click the Save and Exit button to save your NAP application as a draft and return to it at a later time.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
ADD SUPPORTING DOCUMENTS
➢ Add all supporting documents to the NAP application. Supporting Documents stage
➢ Read the help text for guidance on relevant documents to upload tosupport
your Network Access Permit Application.➢ Select the relevant type of document from the Document
Category drop-down field.
➢ Upload the document.
➢ Click the Submit button. ![UrbanUtilities Network Access Permit Application
-
uploaded documents](https://manuals.plus/wp-content/uploads/2023/07 /UrbanUtilities-Network-Access-Permit-Application-uploaded-documents.jpg)➢ Once documents are uploaded, view the uploaded documents from the Documents list. You can also download documents from this view by clicking on the download icon. Ready to progress
- Click the Previous button to return to the Meter Information screen.
- Click the Next button to continue with your NAP application.
- Click the Save and Exit button to save your NAP application as a draft and return to it at a later time.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
REVIEW SUMMARY AND SUBMIT THE NAP APPLICATION
➢ If you decline the terms and conditions, it will not be possible to submit
the NAP Application.
➢ When you have submitted your NAP, you can apply for another one by clicking
on the Network Access Permit Application button and starting the process
over.
- Review the summary of your NAP Application.
- You can make edits in each section by clicking on the section’s Edit button as required.
- Review and complete the fields in the Trunk Infrastructure details and High Risk Activities and Outage Information sections.
➢ There are a
series of checkboxes to be reviewed and agreed upon prior to submission of the
Network Access Permit.
➢ You can either click on the View terms and conditions link, or click on the
I agree to the terms and conditions checkbox to view the terms and conditions
prior to accepting or declining.
➢ Click on either the Decline or Accept button to proceed. Ready to progress
- Ensure all checkboxes have been ticked.
- Click the Submit button to submit your NAP for internal review by Urban Utilities.
- Click the Previous button to return to the Supporting Documents screen.
KEY NETWORK ACCESS PERMIT (NAP) APPLICATION
PAY NAP APPLICATION FEES
➢ Assessing and Processing NAP applications will only start once application
fees are paid.
➢ Once you submit your NAP application, there will be NAP Fee(s) to pay before
Urban Utilities can assess your Application.
➢ We will process NAP applications and if applicable associated shut plans but
will not issue them if Infrastructure Charges are not paid.
Automatically applied Network Access Permit Fees – Type 1 and Type 2
NAPs
➢ Fees are applied automatically on submission of the Network Access Permit
based on the details of your NAP. These fee’s are for the NAP only as they do
not include Shut Plan fees.
Automatically applied Network Access Permit Fees – Type 3 NAPs
➢ Fees are applied automatically on submission of the Network Access Permit
based on the details of your Network Access Permit. For a Type 3 NAP the fee
will include a NAP Fee and a Simple Shut Plan fee.
➢ If the Shut Plan is assessed as being Complex or if a Flow ControPlan is
required a second fee will be applied for the Complex Shut Plan (less the
original Shut Plan Fee paid).
➢ If multiple Shut Plans are required you may be asked to submit aseparate NAP
or charged accordingly for the additional Shut Plans.
Manually applied Network Access Permit Fees
➢ Complex Water Isolation Plan – Fees are applied manually following
assessment of the NAP.
➢ Wastewater Flow Control Plan – Fees are applied manually following
assessment of the NAP.
➢ You can pay the NAP application fees via the portal, or download the charge
notice from the documents tab of your Non-Standard
application.➢ From your Non-Standard Application, there will be an outstanding
amount of fees to be paid for your Network Access Permit Application.
➢ Click the Pay My Application Fees button to pay the fees via the
portal.➢ Check the payment amount
on the Pay Application Fees pop-up window and click the Make Payment button.
➢ Add relevant credit card information and click the NEXT>
button.➢ To pay via alternative
means, download the Charge Notice via the NonStandard Application.
➢ Click on the Documents tab.
➢ Click on the relevant download icon. ➢ You can now pay via alternative method.
CREATING A DRAFT NETWORK ACCESS PERMIT APPLICATION
HOW TO CREATE AND RETURN TO A DRAFT NAP APPLICATION?
➢ At any time during the Network Access Permit application process, you may
save your application as a draft and return to finish it at a later time.
➢ Saved and drafted NAPs can be found within the associated Non-Standard
Application.
➢ Applications can be found by clicking the Applications in Progress tile or
from the Applications in Progress button in the header on the home screen.
➢ To save the NAP as a
draft, click on the Save and Exit button during any stage of the NAP
application.➢ Go to the Applications in Progress screen and locate the
relevant Non-Standard application linked to your drafted NAP.
➢ Click the drop-down arrow in Actions column and select the View
option.
- Click the NAP tab within the Application tab menu.
- Click the NAP SF-ID of your saved NAP Application.
➢ You will see a summarised view of
your draft NAP Application.
➢ To continue editing your NAP Application, click Edit NAP. ➢ You are now back at the same stage of NAP Application you were
within when you clicked the Save and Exit button.
Note: you cannot edit a NAP application once you have submitted it. Email
development.permit@urbanutilities.com.au
if you need to make any changes.
NETWORK ACCESS PERMIT NOTIFICATIONS
NETWORK ACCESS PERMIT NOTIFICATIONS
➢ There are 3 key email notifications during the NAP application process.
- When your NAP is submitted, the payment of fees is now required➢ This notification is sent when you submit the NAP Application via the portal and is sent to the Application Contacts on the Non-Standard application.
- When NAP fees have been paid➢ This notification is sent when you pay your NAP Application and is sent to the Application Contacts on the Non-Standard application.
- When a NAP is issued➢ This notification is sent when a NAP is issued by a Urban Utilities team member via the portal and is sent to the Application Contacts on the Non-Standard application.
RESPONDING TO INFORMATION REQUESTS
HOW DO I RESPOND TO AN INFORMATION REQUEST?
➢ You will receive an email notification.
➢ Log into the portal and action the information request.➢ You will receive an
email notification.
➢ Log into the portal and click on the Information Requests tab.
➢ Select the Info Request hyperlink. ➢ Review the Information Request and note
the instruction on how to respond is shown on the green help
text.➢ If required, you
can upload documents by clicking on the Supporting Documents tab.
➢ Select relevant Document Category and click on the Upload files button.
➢ Click on the Submit button. Any documents uploaded here will be able to be
viewed via the Documents tab in the application.➢ To resolve the information request, add your comments
to the Customer Response box and tick the Response Complete checkbox.
➢ Click the Save button.➢ You have now responded to the
Information Request.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>