SEELESS SLD-1G-2G-3G-4G with Low Voltage Devices Installation Guide

June 10, 2024
SeeLess

SEELESS SLD-1G-2G-3G-4G with Low Voltage Devices Installation Guide
SEELESS SLD-1G-2G-3G-4G with Low Voltage Devices

  1. ROUGH-IN INSTALLATION:
    Make sure the electrical box is centered.Adjust the SeeLess black perforated aluminum brackets, to either 1/2″. 5/8″. or 3/4″ line. Caddy bars are recommended for easy mounting between studs (`not supplied by SeeLess). Verify studs are level, so that the platform is leveled with the drywall. Flat•headed screws are recommended (Pre-drill SeeLess brackets for rounded screws). ‘Don’t over screw when using a power drill to avoid cracking the gypsum.
    Installation

  2. POST INSTALL DRYWALL INSTALLATION:
    Cut in drywall around the platform in the desired location. Level the drywall with the lower line of the joint on the front of the gypsum platform.
    Installation

  3. Adjust the SeeLess black perforated \ aluminum brackets, to either 1/2″, 5/8″, or 3/4″ line. Insert SeeLess platform at an angle.
    Adjustment

  4. Level the drywall with the lower line of the joint on the front of the gypsum platform. Secure SeeLess platform using flat headed drywall screws.
    Installation

  5. Cover the inside of the platform with ICI paper or tape to protect the center opening. Apply the fiberglass tape on all four joints around the platform. Patch with drywall compound.
    Cover inside install

  6. Sand surface smooth. Apply one coat of primer and wait for it to dry. Apply two coats of paint (it is recommended that you paint inside of the opening).
    Surface Smooth

  7. Install the device.

  8. SeeLess suction cups are availble to remove the faceplate.
    REmoving

ROUGH-IN INSTALLATION

*Telescopic (retractable) caddy brackets and drywall screws are not included.
INSTALLATION

When mounting a SeeLess Platform:

  1. Make sure the electrical box is centered to your gypsum platform before installing drywall. The box can be loosened and moved to center it.
    Mounting

  2. Measure your desired distance between the two studs.

  3. Caddy bars are recommended for easy mounting between studs.
    Mounting

  4. Verify studs are level by using a straightedge across the platform. Furr out each side, if necessary, so that the platform is leveled with the drywall.
    Mounting

  5. Check the thickness of drywall to be installed and adjust the SeeLess black perforated aluminum brackets, to either 1/2“, 5/8”, or 3/4″ line (holes are perforated to the standard market perforation size)
    Mounting

  6. Check the level and height of the plaster platform. Screw caddy brackets to each stud at the appropriate height.

  7. Line up and screw the black perforated brackets on the SeeLess platform to the caddy crossbars. *Don’t over screw when using a power drill to avoid cracking the gypsum. We recommend using two flat-headed screws.
    Mounting

  8. If you are using rounded screws, predrilling the brackets is recommended.

  9. Put straightedge across studs and flush out the outer edge of the plaster box to it, then check the level.

  10. Gypsum has center lines marked on each side of the platform to help with laser marker alignment.
    Mounting

  11. For knockout and wiring, press on the soft pre-punched 1/2” and 3/4″ knockouts on the junction box. Re-check the electrical box to ensure it is centered with the gypsum platform after wiring.
    Mounting

POST INSTALL DRYWALL INSTRUCTIONS

When mounting a SeeLess Platform:

  1. Cut in drywall around the platform.
    Installation Instruction

  2. Level the drywall with the lower line of the joint on the front of the gypsum platform.
    Installation Instruction

  3. Make sure that the laser center markers are evenly centered on all sides along the drywall.

  4. Cover the inside of the platform with paper or tape to protect the center opening.

  5. Apply the fiberglass tape on all four joints around the platform.
    Installation Instruction

  6. We recommend using the Fast Set Lite 20 (or 40 depending on available time).
    Installation Instruction

  7. The recommended joint compound to use is the Green Dot topping by Westpac Materials.

  8. Once the first layer of the mud dries, sand-down with 120 grit sandpaper. When the second layer of mud dries, werecommend using 200-grit sandpaper. Then, when the third layer of mud dries, use 220 grit sandpaper.
    Installation Instruction

  9. Apply one coat of primer and wait for it to dry.

  10. Apply two coats of paint. (it is recommended that you paint inside of the opening)
    Installation Instruction

Tel: 1 866 442 5377
Add: 5222 Venice Boulevard,  Los Angeles, CA 90019
Web: www.SeeLess.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SeeLess User Manuals

Related Manuals