APsystems QT2D Microinverter Instruction Manual

June 10, 2024
APsystems

APsystems Logo APsystems Microinverter
Installation manual
APsystems QT2D 3-Phase Microinverter
(For APAC APsystems QT2D Microinverter

Important Safety Instructions

This manual contains important instructions to follow during installation and maintenance of the APsystems Photovoltaic Grid-connected Microinverter. To reduce the risk of electrical shock and ensure a safe installation and operation of the APsystems Microinverter, the following symbols appear throughout this document to indicate dangerous conditions and important safety instructions.
Specifications are subject to change without notice. Please ensure you are using the most recent update found at https://global.apsystems.com/resources/library/
This indicates a situation where failure to follow instructions may cause a serious hardware failure or personnel danger if not applied appropriately. Use extreme caution when performing this task.
This indicates information that is important for optimized microinverter operation.
Follow these instructions closely.
1.1 Safety Instructions
Only qualified professionals should install and/or replace APsystems Microinverters.
  Perform all electrical installations in accordance with local electrical codes.
  Before installing or using the APsystems Microinverter, please read all instructions and cautionary markings in the technical documents and on the APsystems Microinverter system and the solar array.
Do NOT disconnect the PV module from the APsystems Microinverter without first disconnecting the AC power.
Be aware that the body of the APsystems Microinverter is the heat sink and can reach a temperature of 80°C. To reduce risk of burns, do not touch the body of the Microinverter.
Do NOT attempt to repair the APsystems Microinverter. If the microinverter is suspected to be faulty, please contact your local APsystems Technical Support to start troubleshooting and obtain a RMA (Return Merchandise Authorization) number to start the replacement process if needed. Damaging or opening the APsystems Microinverter will void the warranty.
Caution!
When connecting a microinverter, it is recommended to first connect the AC Bus cable to the ground then connect the AC connector to ensure proper earthing of the microinverter, then do the DC connections. When disconnecting a microinverter disconnect the AC by opening the branch circuit breaker first but maintain the protective earthing conductor in the branch circuit breaker connected to the microinverter, then disconnect the DC inputs.
Please install AC breakers on the AC side of the microinverter.

1.2 Radio Interference Statement
EMC Compliance :The APsystems Microinverter can radiate radio frequency energy. If not installed and used in accordance with the instructions, it may cause harmful interference to radio communication.
APsystems Microinverter complies with EMC regulations, which are designed to provide reasonable protection against harmful interference in a residential installation.
Nonetheless, if the Microinverter does cause harmful interference to radio or television reception, you are encouraged to try to correct the interference by one of more of the following measures:
A) Reorient or relocate the receiving antenna
B) Increase the separation between the Microinverter and the receiver
C) Connect the Microinverter into an outlet on a circuit different from that to which the receiver is connected
If none of the recommendations suggested above bring significant improvement in terms of interference, please contact your local APsystems Technical Support.
1.3 Symbols replace words on the equipment, on a display, or in manuals
Trademark.
Caution, risk of electric shock.
Caution, hot surface.
NOTICE, danger! This device directly connected with electricity generators and public grid.
Qualified personne
Person adequately advised or supervised by an electrically skilled person tenable him or her to perceive risks and to avoid hazards which electricity cacreate. For the purpose of the safety information of this manual, a “qualifieperson” is someone who is familiar with requirements for safety, electrical system and EMC and is authorized to energize, ground, and tag equipment, systems, ancircuits in accordance with established safety procedures. The inverter anphotovoltaic system may only be commissioned and operated by qualifiepersonnel.

APsystems Microinverter System Introduction

The APsystems Microinverter is used in utility-interactive grid-tied applications, comprised of three key elements:

  • APsystems Microinverter
  • APsystems Energy Communication Unit (ECU)
  • APsystems Energy Monitor and Analysis (EMA) web-based monitoring and analysis system

APsystems QT2D Microinverter - Microinverter

This integrated system improves safety; maximizes solar energy harvest; increases system reliability, and simplifies solar system design, installation, maintenance, and management.
Safety with APsystems Microinverters
In a typical string inverter installation, PV modules are connected in series. The voltage adds-up to reach high voltage value (from 600Vdc up to 1000Vdc) at the end of the PV string. This extreme high DC voltage brings a risk of electrical shocks or electrical arcs which could cause fire in a worst case scenario. When using an APsystems microinverter, each 1 or 2 PV modules are connected to DC input. Voltage at the back of each PV module never exceeds PV modules Voc, which is lower than 60Vdc for most of PV modules used with APsystems microinverters, which means the DC input voltage will never exceed 120Vdc, and this low voltage will reduce the risk of electrical shock, electrical arcs and fire hazards.
APsystems Microinverters maximize PV energy production
Each 2 input channels have individual Maximum Peak Power Tracking (MPPT) control, which ensures that the maximum power is produced to the utility grid regardless of the performance of the PV modules of other channels in the array. When PV modules in the array are affected by shade, dust, different orientation, or any situation in which one channel underperforms compared with the other channels, the APsystems Microinverter ensures top performance from the array by maximizing the performance of each channel individually within the array.
More reliable than centralized or string inverters
The distributed APsystems Microinverter system ensures that no single point of system failure exists across the PV system. APsystems Microinverters are designed to operate at full power at ambient outdoor temperatures of up to 65 deg C (or 149 F). The inverter case is designed for outdoor installation and complies with the IP67 environmental enclosure rating.
Simple to install
APsystems Microinvertes are compatible with most of 60 and 72 cell PV modules or 120 and 144 half-cut cells PV modules. (In order to confirm compatibility of PV module with APsystems microinverter, feel free to check our online “E-decider” module compatibility tool or contact your local APsystems Technical Support).
Installation requires a minimum number of accessories and microinverters offer a lot of versatility to the installer: microinverters can indeed be installed on different roofs with different orientation or with modules having different orientation.
In the same way, end-users can extend their system whenever they want with microinverters.
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply plugging it into any wall outlet and providing an Ethernet or Wi-Fi connection to a broadband router or modem.
After installing and setting the ECU (see ECU Instruction Manual), the full network of APsystems Microinverters automatically reports to the APsystems Energy Monitor and Analysis (EMA) web server.

APsystems Microinverter QT2D Introduction

APsystems 2 generation of native 3-phase microinverters are reaching unprecedented power outputs of 3200VA. Connecting up to 8 high power modules (4 by 2 in series), the QT2D provides a cost-efficient solution ideal for today’s fast growing commercial PV segment.
The innovative design makes the product unique while maximizing power production. The components are encapsulated with silicone to reduce stress on the electronics, facilitate
thermal dissipation, enhance waterproof properties and ensure maximum reliability of the system via rigorous testing methods including accelerated life testing. A 24/7 energy access through apps or web-based portal facilitate remote diagnosis and maintenance.
The new QT2D is interactive with power grids through a feature referred to as RPC (Reactive Power Control) to better manage photovoltaic power spikes in the grid. In addition, it provides 97% peak efficiency with 20% less components compared to the last generation product. QT2D is a game changer in 3-phase installations for commercial PV rooftops.
Key Product Feature:

  • Designed for 3-phase grid connection
  • 4 input channels
  • Single unit connects to 8 modules
  • Maximum continuous AC output power 3200VA
  • Engineered to match the highest power modules available (Maximum input current 20A)
  • Safety protection relay integrated
  • Adjustable output power factor
  • Balancing 3-phase output

APsystems Microinverter System Installation

A PV system using APsystems Microinverters is simple to install. Each Microinverter easily mounts on the PV racking, directly beneath the PV module(s). Low voltage DC wires connect from the PV module directly to the Microinverter, eliminating the risk of high DC voltage. Installation MUST comply with local regulations and technical rules.
Special Statement: we advise installation of an RCD breaker only if required by the local electrical code.
WARNING
①. Perform all electrical installations in accordance with local electrical codes.
②. Be aware that only qualified professionals should install and/or replace APsystems Microinverters.
③. Before installing or using an APsystems Microinverter, please read all instructions and warnings in the technical documents and on the APsystems Microinverter system itself as well as on the PV array.
④. Be aware that installation of this equipment includes the risk of electric shock.
⑤. Do not touch any live parts in the system, including the PV array, when the system has been connected to the electrical grid.
NOTIC
Even if not required by local electrical code, we strongly recommend to install surge protection devices in the dedicated AC box.
4.1 Additional accessories supplied by APsystems

  • AC Y3 Bus cable
  • AC Y3 Bus Cable End Cap
  • AC Y3 Bus Cable Y-CONN Cap
  • AC Y3 Bus Cable Unlock Tool
  • ECU
  • AC connectors male/female

4.2 Other required accessories not supplied by APsystems
In addition to your PV array and its associated hardware, you may need the following items:

  • An AC connection junction box
  • Mounting hardware suitable for module racking
  • Sockets and wrenches for mounting hardware

4.3 Installation Procedures
4.3.1 Step 1 – Verify that grid voltage matches microinverter rating
4.3.2 Step 2 – Y3 AC Bus Cable distribution
a. Each connector drop of the AC Bus cable matches the position of the microinverter.
b. One end of the AC bus cable is used to access the junction box into the power grid.
c. Wire the conductors of the AC bus: L1 – BROWN ; L2 – BLACK;L3 – GRAY.
WARNING
Wiring color code can be different according to the local regulation. Check all the wires of the installation before connecting to the AC bus to be sure they match. Wrong cabling can damage irreparably the microinverters: such damage is not covered by the warranty.
WARNING
APsystems QT2D Microinverter - Icon Do NOT carry the microinverter by the AC cable. This may cause the AC cable to partially or fully disconnect from the unit, resulting in no or poor operation.

4.3.3 Step 3 – Attach the APsystems Microinverters to the Racking
a. Mark the location of the microinverter on the rack, with respect to the PV module junction box or any other obstructions.
b. Mount one microinverter at each of these locations using hardware recommended by your module racking vendor,make sure the grounding washer is facing the racking.

APsystems QT2D Microinverter - Racking WARNING
Install the microinverters (including DC and AC connectors) under the PV modules to avoid direct exposure to rain, UV or other harmful weather events. Allow a minimum of 1.5 cm (3/4’’) below and above the casing of the microinverter to allow proper air flow.
The racking must be properly grounded as per local electrical code.
4.3.4 Step 4 – Ground the system
There’re 2 ways to ground the QT2D series microinverters.
1. By grounding washer attached.
After the microinverters and racking are reliably installed, the microinverter’s grounding washer can connect to the racking to ensure proper earthing.

APsystems QT2D Microinverter - Racking 1

2. By grounding copper wire.
Fix the grounding copper wire by the grounding lug.

APsystems QT2D Microinverter - Racking 2

4.3.5 Step 5 – Connect the APsystems microinverter to AC bus cable
Insert the microinverter AC connector into the trunk cable connector. Make sure to hear the “click” as a proof of robust connection

APsystems QT2D Microinverter - Racking 3

NOTIC

Check the microinverter technical data page 19 to confirm maximum allowable number of microinverters on each AC branch of the circuit.
AC connector interface as from left to right.

Cover any unused connectors with Bus Cable Y-CONN Cap to protect the unused connectors.

4.3.6 Step 6 – Install a Bus Cable End Cap at the end of AC bus cable

APsystems QT2D Microinverter - AC bus cable

4.3.7 Step 7 – Connect APsystems Microinverters to the PV Modules

NOTIC

  • Each channel connects 2 PV modules in series (For PV modules with Voc<60V).The input channel will not work if connects to a single module(Voc<60V). That means the quantity of PV modules in the sysem is even number.
  • No neutral wire output from inverter.
  • Compatible with both Delta and Wye 3-phase grid.

NOTIC
When plugging in the DC cables, the microinverter should immediately blink green ten times. This will happen as soon as the DC cables are plugged in and will show that the microinverter is functioning correctly. This entire check function will start and end within 10 seconds of plugging in the unit, so pay careful attention to these lights when connecting the DC cables.

WARNING
Double check to make sure all of the AC and DC wiring has been correctly installed.
Ensure that none of the AC and/or DC wires are pinched or damaged. Make sure that all of the junction boxes are properly closed.

APsystems QT2D Microinverter - AC bus cable 2


WARNING
Each PV panel must be carefully connected to the same channel.
Make sure to not split positive and negative DC cables into two different input channels:
microinverter will be damaged and warranty will not apply.
4.3.8 Step 8 – Complete the APsystems installation map
a. Each APsystems Microinverter has 2 removable serial number labels.
b. Complete installation map by sticking ID label of each microinverter at the right location.
c. The second serial number label, could be stuck on the solar module frame, which could help later to confirm the position of the microinverter without dismantling the PV module.

APsystems QT2D Microinverter - AC bus cable 3

NOTIC

  1. The layout of the microinverters’ serial numbers installation map is only suitable for typical installation
  2. Installation Map is available in the last page appendix of this manual.
  3. Use ECU_APP (available in the EMA Manager) to scan the serial numbers on the map when setting up the ECU (see ECU instruction manual for more info).

APsystems microinverter system operating instructions

To operate the APsystems microinverter PV system:

  1. Turn ON the AC circuit breaker on each microinverter AC branch circuit.
  2. Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after approximately one minute of waiting time.
  3. Microinverter data will be available in the EMA Manager APP or in the EMA web portal.
    Alternatively, LED sequences could be an indicator of microinverters status (see section 6.1)

NOTIC
Once the ECU has been commissioned properly, the APsystems Microinverters will start to send performance data to the ECU. The time required for all of the Microinverters in the system to report to the ECU will vary depending on the number of Microinverters in the system.

Troubleshooting

Qualified personnel can use the following troubleshooting steps if the PV system does not operate correctly:
6.1 Status Indications and Error Reporting
Assuming they are easily accessible and visible, Operation LEDs can give a good indication of the microinverters status
6.1.1 Start up LED
Ten short green blinks when DC power is first applied to the Microinverter indicates a successful Microinverter startup.
6.1.2 Operation LED
Flashing Slow Green (5 sec. gap) – Producing power and communicating with ECU Flashing Slow Red (5 sec. gap) – Not producing power
Flashing Fast Green (2 sec. gap) – Not communicating with ECU over 60mins, but still producing power.
Flashing Fast Red (2 sec. gap) – Not communicating with ECU over 60mins and not producing power.
Steady Red – default, DC side ground fault protection, see 6.1.3
6.1.3 GFDI Error
A solid red LED indicates the Microinverter has detected a Ground Fault Detector Interrupter (GFDI) error in the PV system. Unless the GFDI error has been cleared, the LED will remain red and the ECU will keep reporting the fault. Please contact your local APsystems Technical Support.
6.2 ECU_APP
APsystems ECU_APP (available in the EMA Manager APP) is the recommended tool to do on-site troubleshooting. When connecting the ECU_APP to the ECU hotspot (please check ECU User Manual for more detailed information), installer can check every microinverter status (production, communication) but also ZigBee signal strength, grid profile and other insightful data helping the troubleshooting.
6.3 Installer EMA (web portal or EMA Manager APP)
Before going on site for troubleshooting, installer can also check all information remotely using his installer account, either on the web or using the EMA Manager APP (see EMA Manager APP User Manual for more detailed information). Having access to module data (DC, AC, voltages and currents) gives the first indication on potential issues.
6.4 Trouble Shooting Guide Professional installers can also refer to our Troubleshooting Guide ( https://global.apsystems.com/resources/library/ , section libraries) to have more in depth  guideline on how to troubleshoot and fix PV installations powered by APsystems microinverters.
6.5 APsystems Technical Support
APsystems local Technical Support team is available to support professional installers to get familiar with our products and to troubleshoot installations when needed.
WARNING
Do not attempt to repair APsystems Microinverters. Please contact your local APsystems Technical Support.
WARNING

  1. Never disconnect the DC wire connectors under load. Ensure that no current is flowing in the DC wires prior to disconnecting.
  2. Always disconnect AC power before disconnecting the PV module wires from the APsystems Microinverter.
  3. The APsystems Microinverter is powered by PV module DC power. AFTER disconnecting the DC power, when reconnecting the PV modules to the Microinverter, be sure to watch for the quick red light followed by ten short green LED flashes.

6.6 Maintenance
APsystems microinverters do not require any specific regular maintenance.

Replace a microinverter

Follow the procedure to replace a failed APsystems Microinverter
A. Disconnect the APsystems Microinverter from the PV Module, in the order shown below:

  1. Disconnect the AC by turning off the branch circuit breaker.
  2. Disconnect the inverter AC connector from the AC Bus.
  3. Disconnect the PV module DC wire connectors from the microinverter.
  4. Remove the Microinverter from the PV array racking.
    B. Install a replacement Microinverter to the rack. Remember to observe the flashing green LED light as soon as the new Microinverter is plugged into the DC cables.
    C. Connect the AC cable of the replacement Microinverter to the AC bus.
    D. Close the branch circuit breaker, and verify proper operation of the replacement Microinverter.
    E. Update the microinverter in EMA Manage through “Replace” function and update the system’s map with new serial number labels.

Technical Data

  1. Be sure to verify that the voltage and current specifications of your PV module are compatible with the range allowed on APsystems Microinverter. Please check the microinverter datasheet.
  2. DC operating voltage range of the PV module must be within allowable input voltage range of the APsystems Microinverter.
  3. The maximum open circuit voltage of the PV module must not exceed the specified maximum input voltage of the APsystems.

8.1 QT2D 3-phase Microinverter Datasheet

Region Input Data (DC) APAC
Recommended PV Module Power (STC) Range 315Wp-670Wp+
Peak Power Tracking Voltage 58V-85V
Operation Voltage Range 52V-118V
Maximum Input Voltage 118V
Maximum Input Current 20A x 4

Output Data (AC)
Maximum Output Power| 3200VA
Nominal Output Voltage/Range (1)| 380V/324V-468V
Adjustable Output Voltage Range| 305V-478V
Nominal Output Current| 4.85Ax3
Nominal Output Frequency/ Range (1)| 50Hz/48-51Hz
Adjustable Output Frequency Range| 45Hz-55Hz
Adjustable Power Factor| 0.99/0.8 leading…0.8 lagging
Maximum Units per 4mm² Branch (2)| 6
Efficiency
Peak Efficiency| 97%
Nominal MPPT Efficiency| 99.90%
Night Power Consumption| 40mW
Mechanical Data
Operating Ambient Temperature Range (3)| -40 °C to +65 °C
Storage Temperature Range| -40 °C to +85 °C
Dimensions (W x H x D)| 359mm X 273mm X 56mm
Weight| 7kg
AC Bus Cable| 4mm²(28A)
DC Connector Type| Stäubli MC4 PV-ADBP4-S2&ADSP4-S2
Cooling| Natural Convection – No Fans
Enclosure Environmental Rating| IP67
Features
Communication (Inverter To ECU) (4)| Encrypted ZigBee
Isolation Design| High Frequency Transformers, Galvanically Isolated
Energy Management| Energy Management Analysis (EMA) system
Warranty(5)| 10 Years Standard ; Extended Warranty Optional
Compliances
Compliance| IEC 62109-1; IEC 62109-2; IEC 61000-6-1,-2,-3,-4; IEC 61727;
IEC 62116; AS 4777.3; MEA; PEA;
EN 62109-1; EN 62109-2; EN 61000-6-1; EN 61000-6-3;EN 50549-1;

  1. Nominal voltage/frequency range can be extended beyond nominal if required by the utility.
  2. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area
  3. The inverter may enter to power de-grade mode under poor ventilation and heat dissipation installation environment.
  4. Recommend no more than 80 inverters register to one ECU for stable communication.
  5. To be eligible for the warranty, APsystems microinverters need to be monitored via the EMA portal. Please refer to our warranty T&Cs available on global. APsystems.com

2022/06/27 Rev1.0
© All Rights Reserved
Specifications subject to change without notice please ensure you are using the most recent update found at web : global. APsystems.com

QT2D – Wiring Diagram

9.1 Sample Wiring Diagram

APsystems QT2D Microinverter - AC bus cable 4

NOTIC

  • Each channel connects 2 PV modules in series (For PV modules with Voc<60V).The input channel will not work if connects to a single module(Voc<60V). That means the quantity of PV modules in the sysem is even number.
  • No neutral wire output from inverter.
  • Compatible with both Delta and Wye 3-phase grid.

APsystems Microinverter Installation Map

The APsystems Installation Map is a diagram of the physical location of each microinverter in your PV installation. Each APsystems microinverter has two serial number labels. Peel the one label and affix it to the respective location on the APsystems installation map.
Installation Map Template

Installer:

|

PV module type: Qty:

|

Sheet of

|

N

---|---|---|---

Owner:

|

Microinverter type:   Qty:

 | Column 1| Column 2| Column 3| Column 4| Column 5| Column 6| Column 7
Row 1|  |  |  |  |  |  |
Row 2|  |  |  |  |  |  |
Row 3|  |  |  |  |  |  |
Row 4|  |  |  |  |  |  |
Row 5|  |  |  |  |  |  |
Row6|  |  |  |  |  |  |
Row 7|  |  |  |  |  |  |
Row 8|  |  |  |  |  |  |
Row 9|  |  |  |  |  |  |
Row10|  |  |  |  |  |  |

http://q-r.to/1OrC

Please scan this QR code to have access to our APPs and Products information

© All Rights Reserved

ALTENERGY POWER SYSTEM Inc.global.APsystems.com
APsystems Shanghai:

Rm.B305 No.188, Zhangyang Road, Pudong, Shanghai 200120,P.R.C
Tel: 021-3392-8205
EMAIL:info.apac@APsystems.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals