MONOGRAM ZXS900P Stainless Storage Drawer Installation Guide

June 10, 2024
MONOGRAM

INSTALLATION INSTRUCTIONS
Storage Drawer
ZXS900P, ZXS900S
MONOGRAM.COM

Safety Information

BEFORE YOU BEGIN
Read these instructions completely and carefully.

  • Note to installer — Be sure to leave these instructions with Consumer.

  • Note to Consumer — Keep these instructions for future reference.

  • Completion Time — 1 to 3 Hours.

  • Proper installation is the responsibility of the installer.
    Product failure due to improper installation is not covered under the warranty. See Owner’s Manual for warranty information.

  • If you received a damaged storage drawer, you should contact your dealer

  • For Monogram local service in your area, 1.800.444.1845.

  • For Monogram Service in Canada, call 1.800.561.3344.

  • For Monogram Parts and Accessories, call 1.800.626.2002.

MODELS AVAILABLE
30” Models: ZXS900P, ZXS900S
WARNING An anti-tip brace must be installed to prevent the drawer from tipping forward when opened and loaded. Failure to do so could result in personal injury.

Installation Preparation

TOOLS REQUIRED

MONOGRAM ZXS900P Stainless Storage Drawer

MATERIALS PROVIDED FOR USE WITH OPTIONAL BOTTOM TRIM KIT

MONOGRAM ZXS900P Stainless Storage Drawer - Fig

OPTIONAL BOTTOM TRIM KIT ZX30VT1 (not provided)

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 2

MATERIALS REQUIRED

MATERIALS REQUIRED (not provided)

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 4

Runners must be level, rigidly mounted and capable of supporting 150 pounds.
REMOVE PACKAGING
Place Storage Drawer on carton or protective pad to prevent damage to drawer front or finished flooring.

PRODUCT DIMENSIONS AND CLEARANCES

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 5

  • When installed, the front face of the drawer will be nearly flush with adjacent cabinetry doors.
  • Drawer overlaps will conceal cut edges on all sides of the opening
  • Drawer must have a 3/8” minimum clearance above the cabinet to kick.

When installing below ovens:

NOTE: Additional clearance between cutouts may be required. Check to be sure that oven supports above the Storage Drawer location do not obstruct the required interior  depth and height.

  • Allow appropriate minimum clearance between oven and drawer cutouts for clearance of overlaps. 5/8” Min for wall ovens and 1 1/2”Min for Adventism’s and Built In Steam Ovens

NOTE: If you are installing in frameless cabinets, it may be necessary to install 1/2” wide cleats to accept drawer mounting screws. See drawer for mounting screw locations.

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 6

When installing under a cooktop:

  • NOTE: When installing the storage drawer below a cooktop, a solid barrier must be installed at least 1” from the lowest point of the bottom of cooktop burner box to the top of cutout. Use any solid material such as 1/4” thick plywood. Allow at least 1/4” air gap between the barrier and the top of the storage drawer.

Installation below a cabinet drawer:
The storage drawer may be installed beneath a cabinet drawer.
Side to Side Installation:
Install two storage drawers in separate cutouts. Allow 1-3/4″ min. between cutouts

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 7

PROVIDE BOTTOM CABINET SUPPORT FOR ALL INSTALLATION TYPES

IMPORTANT: When installed below a single or double oven, check to be sure that any oven supports above the cutout do not obstruct the 23-1/2” required depth of the storage drawer cutout.

  • A minimum clearance of 5/8” for wall ovens and 1-1/2” for Advantiums and Built In Steam Ovens between oven and storage drawer cutouts are required.
    Additional clearance may be required if 2 x 4 blocks are used to support runners or solid floor of the oven above.

  • The drawer may be supported by either a solid bottom, 2 x 4 or 2 x 2 runners.

  • The support must be level and rigidly mounted, flush with the bottom edge of the cutout.
    There is no way to level the drawer once it has been installed. Be sure supports are level.

  • The entire weight of the drawer is supported by the runners or solid floor and must be capable of supporting 150 Ibis.

The storage drawers have three installation types — Standard, Flush Inset, and Flush Inset with Optional Bottom Trim. Please follow the cutout specifications for the type of  installation you are planning.

STANDARD INSTALLATION

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 9

FLUSH INSET INSTALLATION – NO TRIM

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 10

FLUSH INSET INSTALLATION WITH OPTIONAL BOTTOM TRIM KIT ZX30VT1

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 11

PREPARE THE INTERIOR
Cut and install side cleats:

  • Cut 2 side wood cleats to height of cabinet opening and approx. 2-1/2” in depth (A). Install on each side at an indicated depth from the front face of the cabinet.
    Cut and install top cleat:

  • Cut top wood cleat to width of cabinet opening minus 2 side cleat thicknesses. Install in top of cutout at an indicated depth from the front face of the cabinet.
    Cut and install bottom cleat:

  • Cut bottom wood cleat.
    Install onto the cabinet floor between the side cleats.
    Push it all the way back against cabinet wall and make sure its front face is at an indicated depth from the front cabinet face.

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 12

Installation

INSTALL ANTI-TIP BRACKETS
WARNING ANTI-TIP PRECAUTIONS
An anti-tip brace must be installed to prevent the drawer from tipping forward when opened and loaded. Failure to do so could result in personal injury.

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 13

INSTALL OPTIONAL BOTTOM TRIM ZX30VT1 IF APPLICABLE

  • On the underside of the case, locate 4 holes along the front edge.

  • Align the 4 holes on the trim bracket (included with the storage drawer) with the 4 large holes on the case.
    Using 4 screws provided, attach the bracket to the underside of the case.

  • Align the 2 holes in the optional bottom trim from ZX30VT1 kit with the 2 holes in the front facing portion of the bracket. Using the screws and flange serrated nuts provided, secure the trim to the bracket.

MONOGRAM ZXS900P Stainless Storage Drawer - Fig 14

INSTALL STORAGE DRAWER

  • Slide the left corner of the drawer into the opening.
  • Push the drawer back until the front flange is flush to the cabinet front.
  • Open the drawer fully.
  • Drill pilot holes through the holes in the overlapping frame, one on each corner.
  • Drive the wood screws provided into each corner.

NOTE: While performing installations described in this book, safety glasses or goggles should be worn.
For Monogram® local service in your area, call 1.800.444.1845.
NOTE: Product improvement is a continuing endeavor at GE Appliances. Therefore, materials, appearance and specifications are subject to change without notice.

31-2000898 Rev. 2
02-23 GEA
Printed in China

Documents / Resources

| MONOGRAM ZXS900P Stainless Storage Drawer [pdf] Installation Guide
ZXS900P, ZXS900S, ZXS900P Stainless Storage Drawer, Stainless Storage Drawer, Storage Drawer, Drawer
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

MONOGRAM User Manuals

Related Manuals