APsystems DS3 Series Solar Microinvert Installation Guide
- June 10, 2024
- APsystems
Table of Contents
- APsystems DS3 Series Solar Microinvert
- Important Safety Instructions
- APsystems Microinverter System Introduction
- APsystems Microinverter DS3 series Introduction
- APsystems Microinverter System Installation
- APsystems microinverter system operating instructions
- Troubleshooting
- Replace a microinverter
- Technical Data
- DS3 series – Wiring Diagram
- APsystems Microinverter Installation Map
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
APsystems DS3 Series Solar Microinvert
ALTENERGY POWER SYSTEM Inc. global.apsystems.com
APsystems Shanghai:
Rm.B305 No.188, Zhangyang Road, Pudong, Shanghai 200120,P.R.C
Tel: 021-3392-8205 EMAIL:
info.apac@APsystems.com
Important Safety Instructions
This manual contains important instructions to follow during installation and maintenance of the APsystems Photovoltaic Grid-connected Microinverter. To reduce the risk of electrical shock and ensure a safe installation and operation of the APsystems Microinverter, the following symbols appear throughout this document to indicate dangerous conditions and important safety instructions.
Specifications are subject to change without notice. Please ensure you are using the most recent update found at https://global.apsystems.com/resources/library/
WARNING: This indicates a situation where failure to follow instructions may cause a serious hardware failure or personnel danger if not applied appropriately. Use extreme caution when performing this task.
NOTICE: This indicates information that is important for optimized microinverter operation. Follow these instructions closely.
-
Only qualified professionals should install and/or replace APsystems Microinverters.
-
Perform all electrical installations in accordance with local electrical codes.
-
Before installing or using the APsystems Microinverter, please read all instructions and cautionary markings in the technical documents and on the APsystems Microinverter system and the solar array.
-
Do NOT disconnect the PV module from the APsystems Microinverter without first disconnecting the AC power.
-
Be aware that the body of the APsystems Microinverter is the heat sink and can reach a temperature of 80°C. To reduce risk of burns, do not touch the body of the Microinverter.
-
Do NOT attempt to repair the APsystems Microinverter. If the microinverter is suspected to be faulty, please contact your local APsystems Technical Support to start troubleshooting and obtain a RMA (Return Merchandise Authorization) number to start the replacement process if needed. Damaging or opening the APsystems Microinverter will void the warranty.
-
Caution!
When connecting a microinverter, it is recommended to first connect the AC Bus cable to the ground then connect the AC connector to ensure proper earthing of the microinverter, then do the DC connections. When disconnecting a microinverter disconnect the AC by opening the branch circuit breaker first but maintain the protective earthing conductor in the branch circuit breaker connected to the microinverter, then disconnect the DC inputs. -
Please install AC breakers on the AC side of the inverter.
Radio Interference Statement
EMC Compliance:The APsystems Microinverter can radiate radio frequency energy.
If not installed and used in accordance with the instructions, it may cause
harmful interference to radio communication.
APsystems Microinverter complies with EMC regulations, which are designed to
provide reasonable protection against harmful interference in a residential
installation.
Nonetheless, if the Microinverter does cause harmful interference to radio or
television reception, you are encouraged to try to correct the interferences
by one of more of the following measures:
- Reorient or relocate the receiving antenna
- Increase the separation between the Microinverter and the receiver
- Connect the Microinverter into an outlet on a circuit different from that to which the receiver is connected
If none of the recommendations suggested above bring significant improvement in terms of interferences, please contact your local APsystems Technical Support.
Symbols in lieu of words
Trademark
Caution, risk of electric shock.
Caution, hot surface.
Qualified personnel
Person adequately advised or supervised by an electrically skilled person to enable him or her to perceive risks and to avoid hazards which electricity can create. For the purpose of the safety information of this manual, a “qualified person” is someone who is familiar with requirements for safety, electrical system personnel and EMC and is authorized to energize, ground, and tag equipment, systems, and circuits in accordance with established safety procedures. The inverter and photovoltaic system may only be commissioned and operated by qualified.
APsystems Microinverter System Introduction
The APsystems Microinverter is used in utility-interactive grid-tied applications, comprised of three key elements:
- APsystems Microinverter
- APsystems Energy Communication Unit (ECU)
- APsystems Energy Monitor and Analysis (EMA) web-based monitoring and analysis system
This integrated system improves safety; maximizes solar energy harvest; increases system reliability, and simplifies solar system design, installation, maintenance, and management.
Safety with APsystems Microinverters
In a typical string inverter installation, PV modules are connected in
series. The voltage adds-up to reach high voltage value (from 600Vdc up to
1000Vdc) at the end of the PV string. This extreme high DC voltage brings a
risk of electrical shocks or electrical arcs which could cause fire.
When using an APsystems microinverter, PV modules are connected in parallel. Voltage at the back of each PV module never exceeds PV modules Voc, which is lower than 60Vdc for most of PV modules used with APsystems microinverters. This low voltage is considered “safe to touch” by fire departments and negates the risk of electrical shock, electrical arcs and fire hazards.
APsystems Microinverters maximize PV energy production
Each PV module has individual Maximum Peak Power Tracking (MPPT) control,
which ensures that the maximum power is produced to the utility grid
regardless of the performance of the other PV modules in the array. When PV
modules in the array are affected by shade, dust, different orientation, or
any situation in which one module underperforms compared with the other units,
the APsystems Microinverter ensures top performance from the array by
maximizing the performance of each module individually within the array.
More reliable than centralized or string inverters
The distributed APsystems Microinverter system ensures that no single point
of system failure exists across the PV system. APsystems Microinverters are
designed to operate at full power at ambient outdoor temperatures of up to 65
deg C (or 149 F). The inverter case is designed for outdoor installation and
complies with the IP67 environmental enclosure rating.
Simple to install
APsystems Microinvertes are compatible with most of 60 and 72 cell PV
modules or 120 and 144 half-cut cells PV modules. (In order to confirm
compatibility of PV module with APsystems microinverter, feel free to check
our online “E-decider” module compatibility tool or contact your local
APsystems Technical Support).
Installation requires a minimum number of accessories and microinverters offer
a lot of versatility to the installer: microinverters can indeed be installed
on different roofs with different orientation or with modules having different
orientation.
In the same way, end-users can extand their system whenever they want with
microinverters.
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply
plugging it into any wall outlet and providing an Ethernet or Wi-Fi connection
to a broadband router or modem. After installing and setting the ECU (see ECU
Instruction Manual), the full network of APsystems Microinverters
automatically reports to the APsystems Energy Monitor and Analysis (EMA) web
server.
APsystems Microinverter DS3 series Introduction
APsystems 3rd generation of dual microinverters are reaching unprecedented
power outputs of 730VA or 880VA to adapt to today’s larger power module. With
2 independent MPPT, encrypted ZigBee signals, the DS3-L and DS3 benefit from
an entirely new architecture and are fully backwards compatible with the QS1
and YC600 microinverters.
The innovative and compact design make the product lighter while maximizing
power production. The components are encapsulated with silicone to reduce
stress on the electronics, facilitate thermal dissipation, enhance waterproof
properties and ensure maximum reliability of the system via rigorous testing
methods including accelerated life testing. A 24/7 energy access through apps
or web based portal facilitate remote diagnosis and maintenance.
The new DS3 series is interactive with power grids through a feature referred to as RPC (Reactive Power Control) to better manage photovoltaic power spikes in the grid. With a performance and an efficiency of 97%, a unique integration with 20% less components, APsystems DS3-L & DS3 are a game changer to residential and commercial PV.
Key Product Feature:
- One microinverter connects to two modules
- Max output power reaching 730VA or 880VA
- Two input channels with independent MPPT
- Reactive Power Control
- Maximum reliability, IP67
- Encrypted ZigBee Communication
- Safety protection relay integrated
APsystems Microinverter System Installation
A PV system using APsystems Microinverters is simple to install. Each Microinverter easily mounts on the PV racking, directly beneath the PV module(s). Low voltage DC wires connect from the PV module directly to the Microinverter, eliminating the risk of high DC voltage. Installation MUST comply with local regulations and technical rules.
Special Statement: we advise installation of an RCD breaker only if required by the local electrical code.
WARNING
- Perform all electrical installations in accordance with local electrical codes.
- Be aware that only qualified professionals should install and/or replace APsystems Microinverters.
- Before installing or using an APsystems Microinverter, please read all instructions and warnings in the technical documents and on the APsystems Microinverter system itself as well as on the PV array.
- Be aware that installation of this equipment includes the risk of electric shock.
- Do not touch any live parts in the system, including the PV array, when the system has been connected to the electrical grid.
NOTICE: Even if not required by local electrical code, we strongly recommend to install surge protection devices in the dedicated AC box.
Additional accessories supplied by APsystems
- AC Y3 Bus cable
- AC Y3 Bus Cable End Cap
- AC Y3 Bus Cable Y-CONN Cap
- AC Y3 Bus Cable Unlock Tool
- ECU
- AC connectors male/female
Other required accessories not supplied by APsystems
In addition to your PV array and its associated hardware, you may need the
following items:
- An AC connection junction box
- Mounting hardware suitable for module racking
- Sockets and wrenches for mounting hardware
Installation Procedures
Step 1 – Verify that grid voltage matches microinverter rating
Step 2 – Y3 AC Bus Cable distribution
- Each connector drop of the AC Bus cable matches the position of the microinverter.
- One end of the AC bus cable is used to access the junction box into the power grid.
- Wire the conductors of the AC bus: L – BROWN ; N – BLUE;PE – YELLOW GREEN.
WARNING:
- Wiring color code can be different according to local regulations. Check all the wires of the installation before connecting to the AC bus to be sure they match. Improper cabling can irreparably damage the microinverters: such damage is not covered by the warranty.
- Do NOT carry the microinverter by the AC cable. This may cause the AC cable to partially or fully disconnect from the unit, resulting in no or poor operation.
Step 3 – Attach the APsystems Microinverters to the Racking
- Mark the location of the microinverter on the rack, with respect to the PV module junction box or any other obstructions.
- Mount one microinverter at each of these locations using hardware recommended by your module racking vendor.
WARNING: Install the microinverters (including DC and AC connectors) under the PV modules to avoid direct exposure to rain, UV or other harmful weather events. Allow a minimum of 1.5 cm (3/4’’) below and above the casing of the microinverter to allow proper air flow. The racking must be properly grounded as per local electrical code.
Step 4 – Ground the system
Y3 AC Bus cable has an embedded PE wire: this might be sufficient to ensure proper grounding of the whole PV array. However, in areas with special grounding requirements, external grounding work may still be needed, using the grounding lug supplied with the Microinverter
Step 5 – Connect the APsystems microinverter to AC bus cable
Insert the microinverter AC connector into the trunk cable connector. Make
sure to hear the “click” as a proof of robust connection
Best Practice: Use the AC Bus Cable Unlock Tool to disconnect the connectors.
NOTICE: Check the microinverter technical data page 19 to confirm maximum allowable number of microinverters on each AC branch of the circuit.
AC connector interface as from left to right.
Cover any unused connectors with Bus Cable Y-CONN Cap to protect the unused connectors.
Step 6 – Install a Bus Cable End Cap at the end of AC bus cable
Step 7 – Connect APsystems Microinverters to the PV Modules
NOTICE: When plugging in the DC cables, the microinverter should immediately blink green ten times. This will happen as soon as the DC cables are plugged in and will show that the microinverter is functioning correctly. This entire check function will start and end within 10 seconds of plugging in the unit, so pay careful attention to these lights when connecting the DC cables.
WARNING: Double check to make sure all of the AC and DC wiring has been correctly installed. Ensure that none of the AC and/or DC wires are pinched or damaged. Make sure that all of the junction boxes are properly closed.
WARNING: Each PV panel must be carefully connected to the same channel.
Make sure to not split positive and negative DC cables into two different
input channels: microinverter will become damaged and warranty will not apply.
Step 8 – Connect APsystems Microinverters to Grid
NOTICE
- Please install bi-polar circuit breakers with proper rated current or according to the local regulation, which are mandatory to connect to grid.
- Leakage current breakers or AFCI/GFCI breakers are not recommended to install.
Step 9 – AC Extension Cable
When AC extension cable is needed, users could connect the AC bus cable and AC extension cable in a junction box or use a pair of male/female AC connectors that APsystems provides as optional accessory.
Step 10 – Complete the APsystems installation map
- Each APsystems Microinverter has 2 removable serial number labels.
- Complete the installation map by sticking the ID label of each microinverter in the right location.
- The second serial number label, could be stuck on the solar module frame, which could help later to confirm the position of the microinverter without dismantling the PV module
NOTICE
- The layout of the microinverters’ serial number installation map is only suitable for a typical installation.
- Installation Map is available in the last page appendix of this manual.
- Use ECU_APP (available in the EMA Manager) to scan the serial numbers on the map when setting up the ECU (see ECU instruction manual for more info).
Step 11 – Warning Notice
A warning notice must be placed in such a way that anyone with access to live
parts is warned in advance of the need to switch off these parts. It is
imperative to verify that the power supply, measurement circuits (sense lines)
and other parts are not isolated from the network when the interface
protection switch is open.
As a minimum, warning labels shall be placed:
- On the switchboard (DNO panel and consumer unit) that has the PV generator connected to it;
- On all switchboards in between the consumer unit and the PV generator itself;
- On, or in the PV generator itself;
- At all points of isolation for the PV generator
APsystems microinverter system operating instructions
To operate the APsystems microinverter PV system:
- Turn ON the AC circuit breaker on each microinverter AC branch circuit.
- Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after approximately one minute of waiting time.
- Microinverter data will be available in the EMA Manager APP or in the EMA web portal. Alternatively, LED sequences could be an indicator of microinverters status (see section 6.1)
NOTICE
Once the ECU has been commissioned properly, the APsystems Microinverters will
start to send performance data to the ECU. The time required for all of the
Microinverters in the system to report to the ECU will vary depending on the
number of Microinverters in the system.
Troubleshooting
Qualified personnel can use the following troubleshooting steps if the PV system does not operate correctly:
Status Indications and Error Reporting
Assuming they are easily accessible and visible, Operation LEDs can give a
good indication of the microinverters status
Start up LED
Ten short green blinks when DC power is first applied to the Microinverter
indicates a successful Microinverter startup.
Operation LED
- Flashing Slow Green (5 sec. gap) – Producing power and communicating with ECU Flashing Slow Red (5 sec. gap) – Not producing power
- Flashing Fast Green (2 sec. gap) – Not communicating with ECU over 60mins, but still producing power.
- Flashing Fast Red (2 sec. gap) – Not communicating with ECU over 60mins and not producing power.
- Steady Red – default, DC side ground fault protection, see 6.1.3
6.1.3 GFDI Error
A solid red LED indicates the Microinverter has detected a Ground Fault
Detector Interrupter (GFDI) error in the PV system. Unless the GFDI error has
been cleared, the LED will remain red and the ECU will keep reporting the
fault. Please contact your local APsystems Technical Support.
ECU_APP
APsystems ECU_APP (available in the EMA Manager APP) is the recommended tool
to do on-site troubleshooting. When connecting the ECU_APP to the ECU hotspot
(please check ECU User Manual for more detailed information), installer can
check every microinverter status (production, communication) but also ZigBee
signal strength, grid profile and other insightful data helping the
troubleshooting.
Installer EMA (web portal or EMA Manager APP)
Before going on site for troubleshooting, installer can also check all
information remotely using his installer account, either on the web or using
the EMA Manager APP (see EMA Manager APP User Manual for more detailed
information). Having access to module data (DC, AC, voltages and currents)
gives the first indication on potential issues.
Trouble Shooting Guide
Professional installers can also refer to our Troubleshooting Guide
(https://global.apsystems.com/resources/library/, section libraries)for more
in depth guidelines on how to troubleshoot and fix PV installations powered by
APsystems microinverters.
APsystems Technical Support
The APsystems local Technical Support team is available to support
professional installers in becoming familiar with our products and to
troubleshoot installations when needed.
WARNING: Do not attempt to repair APsystems Microinverters. Please contact your local APsystems Technical Support.
- Never disconnect the DC wire connectors under load. Ensure that no current is flowing in the DC wires prior to disconnecting.
- Always disconnect AC power before disconnecting the PV module wires from the APsystems Microinverter.
- The APsystems Microinverter is powered by PV module DC power. AFTER disconnecting the DC power, when reconnecting the PV modules to the Microinverter, be sure to watch for the quick red light followed by ten short green LED flashes.
Maintenance
APsystems microinverters do not require any specific regular maintenance.
Replace a microinverter
Follow the procedure to replace a failed APsystems Microinverter
- Disconnect the APsystems Microinverter from the PV Module, in the order shown below:
- Disconnect the AC by turning off the branch circuit breaker.
- Disconnect the inverter AC connector from the AC Bus.
- Disconnect the PV module DC wire connectors from the microinverter.
- Remove the Microinverter from the PV array racking.
- Install a replacement Microinverter to the rack. Remember to observe the flashing green LED light as soon as the new Microinverter is plugged into the DC cables.
- Connect the AC cable of the replacement Microinverter to the AC bus.
- Close the branch circuit breaker, and verify proper operation of the replacement Microinverter.
- Update the microinverter in the EMA Manager through the “Replace” function and update the system’s map with new serial number labels.
Technical Data
WARNING:
- Be sure to verify that the voltage and current specifications of your PV module are compatible with the range allowed on APsystems Microinverter. Please check the microinverter datasheet.
- DC operating voltage range of the PV module must be within allowable input voltage range of the APsystems Microinverter.
- The maximum open circuit voltage of the PV module must not exceed the specified maximum input voltage of the APsystems.
DS3 series Microinverter Datasheet
- Nominal voltage/frequency range can be extended beyond nominal if required by the utility.
- Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area.
- The inverter may enter to power de-grade mode under poor ventilation and heat dissipation installation environment.
- Recommend no more than 80 inverters register to one ECU for stable communication.
- To be eligible for the warranty, APsystems microinverters need to be monitored via the EMA portal. Please refer to our warranty T&Cs available on global.APsystems.com
© All Rights Reserved
Specifications subject to change without notice please ensure you are using
the most recent update found at web :
global.APsystems.com
DS3 series – Wiring Diagram
Sample Wiring Diagram – Single Phase
APsystems Microinverter Installation Map
The APsystems Installation Map is a diagram of the physical location of each microinverter in your PV installation. Each APsystems microinverter has two serial number labels. Peel the one label and affix it to the respective location on the APsystems installation map.
Installation Map Template
Installer: | PV module type: Qty: | Sheet of | N |
---|---|---|---|
Owner: | Microinverter type: Qty: | ||
Column 1 | Column 2 | Column 3 | |
Row 1 | |||
Row 2 | |||
Row 3 | |||
Row 4 | |||
Row 5 | |||
Row6 | |||
Row 7 | |||
Row 8 | |||
Row 9 | |||
Row10 |
References
- APsystems Global | The global leader in multi-platform MLPE technology
- Documents Library – APsystems Global | The global leader in multi-platform MLPE technology