COOPERS OF STORTFORD L434 Set 2 Garden Obelisks Instruction Manual

June 9, 2024
Coopers OF STORTFORD

Set 2 Garden Obelisks
L434 v001: 02/11/22COOPERS OF STORTFORD L434 Set 2 Garden
Obelisks Dimensions
(H) 190 x (W) 40 x (D) 40cm
Material: Steel
Please read and retain these instructions for future reference

L434 Set 2 Garden Obelisks

It is recommended to assemble the obelisk horizontally on its side. Once assembled carefully stand it upright to install.
Use one of the tubular rings once it is assembled to mark out the leg positions in the desired location.

Parts

COOPERS OF STORTFORD L434 Set 2 Garden Obelisks - fig

ASSEMBLY INSTRUCTIONS / INSTRUCTIONS FOR USE:

Unpack the components carefully. Please check all parts have been removed from the packaging.

COOPERS OF STORTFORD L434 Set 2 Garden Obelisks - fig
2

Assembly

  • Connect 4x part A with the finial part H and G.
  • Assemble top ring 4x part B to sit inside the uprights.
    Where the uprights meet the ring, bolt all 4 together.
    For the top ring: Part A&C and 2xB.
    For the 2 longer rings, 2xC and 2xB.
    Then insert the 4 legs (Part D).

DISPOSAL

  • Coopers of Stratford use recyclable or recycled packaging where possible.
  • Please dispose of all packaging, paper, cartons, packaging in accordance with your local recycling regulations.
  • At the end of the product’s lifespan please check with your local council authorised household waste recycling centre for disposal.

The Enterprise Department

UK Head Office, 11 Bridge Street, Bishop’s Stortford, CM23 2JU
*Tel: 0844 4824400, Fax: 01279 756595
www.coopersofstortford.co.uk
EU address: D.S.B. LD, 160 Bd. de Fourmies, 59100 Roubaix, France
Tel: (+44) 1279 701269*
UK Calls cost around 7 pence per minute plus your telephone company’s network access.
Please check with your telephone supplier.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Coopers OF STORTFORD User Manuals

Related Manuals