EGUANA Evolve LFP 5kW Inverter Installation Guide

June 10, 2024
EGUANA

EGUANA Evolve LFP 5kW Inverter

EGUANA-Evolve-LFP-5kW-Inverter-product

Product Information

Evolve Home Energy Storage System

The Evolve home energy storage system is a product by Eguana that provides energy storage solutions for households. This system is available in four different models: Evolve LFP, Evolve LFP MAX, Evolve ESS, and Evolve 0513U & E-Gear ATS/EMC Panel. The Fleet Installer Web Application is a software that is designed to help authorized installation companies manage their fleet of energy storage systems. Fleet Installer application also permits remote commissioning and diagnostics, which are covered in a separate guide. The Fleet Installer application can be accessed through a web browser platform such as Google Chrome, Firefox, or Safari. However, it should be noted that Microsoft IE and Edge are not supported. Authorized installation companies can log into the Fleet Installer Web Application at https://www.mypowermyway.com/fleet_installer. The login credentials will be provided in an invitation email sent by the company. It is recommended to change the password after the first login.

The Fleet Installer dashboard provides a high-level view of the health of all systems monitored under the company account. The dashboard is divided into different categories, and systems that are flagged in any category can be reviewed by selecting [Details]. Data is polled from the systems in approximately 5-minute intervals.

Product Usage Instructions

  • Step 1: Login to the Fleet Installer Web Application using the provided login credentials.
  • Step 2: Review the dashboard to get a high-level view of the health of all systems monitored under the company account.
  • Step 3: To manage the security of the company’s fleet of installed systems, the Fleet Installer administrator can access different menus available to them such as Account Administration, Commissioning profiles, Customers, Blocks Management, and Installer dashboard devices.
  • Step 4: To commission the Evolve energy storage system, connect a USB cable from a laptop to the energy management controller (EMC) within the Evolve Hub. The EMC incorporates public key infrastructure (PKI) as a security measure to prevent unauthorized access to the system configuration settings.
  • Step 5: Follow the instructions provided in the separate guide for Fleet Installer Web Application: Remote Commissioning and Diagnostics to complete the commissioning process and diagnose any issues remotely.

It is important to read the user manual/instructions carefully before using this product as failure to follow instructions or warnings can result in electrical shock, serious injury, or death. Operating the product in a way that it was not intended can also result in permanent damage to the product. For the latest Evolve documents or updates, visit the Eguana website at www.eguanatech.com.

IMPORTANT INSTRUCTIONS

This manual contains important product information for your Evolve home energy storage system. This document is accurate at the time of publishing. Eguana reserves the right to make updates to the product without notice. For the latest Evolve documents, please visit our website at www.eguanatech.com

WARNING:  Read this document in its entirety before using this product. Failure to follow instructions or warnings can result in electrical shock, serious injury, or death. Operating the product in a way that it was not intended can also result in permanent damage to the product. This manual applies to the following products:

  • Evove LFP with Evolve Hub
  • Evolve LFP MAX with Evolve Hub MAX
  • Evolve ESS with Evolve Hub
  • Evolve 0513U & E-Gear ATS/EMC Panel

Introduction

Fleet Installer Web Application Software

This document is intended for authorized installation companies of Eguana Evolve home energy storage systems. The guide covers user account and device administration of an installation company’s fleet of energy storage systems.

Note: The Fleet Installer application also permits remote commissioning and diagnostics. These topics are covered in a separate guide, see – Fleet Installer Web Application: Remote Commissioning and Diagnostics. The Fleet Installer application runs on a web browser platform. Google Chrome, Firefox and Safari are supported. Microsoft IE and Edge are not supported. Login at: https://www.mypowermyway.com/fleet_installer

Enter your login credentials as assigned in your invitation email. A password change is recommended after the first login.

Dashboard review

EGUANA-Evolve-LFP-5kW-Inverter-fig-1

Each category in the dashboard provides a high level view of the health of all systems monitored under the company account. Systems that are flagged in any category can be reviewed by selecting [Details].

Note: Data is polled from the systems in approximately 5 minute intervals.

Account Administration

Commissioning the Evolve energy storage system is achieved via a USB connection from a laptop to the energy management controller (EMC) within the Evolve Hub. The EMC incorporates public key infrastructure (PKI) as a security measure to prevent unauthorized access to the system configuration settings. To manage the security of the company’s fleet of installed systems, the Fleet Installer administrator can:

  • Add / delete employees with access to the fleet installer dashboard.
  • Issue / revoke certificates to employees that are deployed to commission systems.

The on-boarding process: registering your company as an authorized installer

_ IMPORTANT:  _The company must be registered with Eguana to be assigned an authorized installer account with the Fleet Installer web application. Contact a regional office nearest you at www.eguanatech.com to request an administrator account. Once approved, you will be assigned an account with an invitation email from “My Power. My Way.”

Note: An Eguana service tech will initially have administrative access to a new company account. This provision is in place to provide remote support during the training phase. This can be disabled by the company administrator at any time.

Administrator permissions and tasks

IMPORTANT:  Ensure all permission levels are checked before completing admin tasks within this section.

EGUANA-Evolve-LFP-5kW-Inverter-fig-2

Add employee

EGUANA-Evolve-LFP-5kW-Inverter-fig-3

  1. From the top menu bar, select: management > employees
  2. Click [Add new employee]
  3. Enter personal (company) contact details, including: email address, phone number, and first/last name
  4. Scroll down to Permissions, and assign the relevant permissions The installers should have permission to the following:
    • User can add and edit customer devices.
    • Can send welcome email to customers.
    • Note: Editing other users should be restricted to the administrator only.
  5. Press [Create] to complete. This will trigger an automatic email invitation from My Power. My Way.

Create signing key

EGUANA-Evolve-LFP-5kW-Inverter-fig-4

The signing key provides the administrator with the authority to issue certificates to employees that will commission systems.

  1. From the top menu bar (right), select your user account
  2. Scroll down to Signing Keys, and click on [Create Signing Key]
  3. Complete the password fields in the pop-up menu. The employee login password is your login password. The signing key password is created here. You can use the same password as the employee login password.
  4. Press [Save] to complete.

Issue certificate

EGUANA-Evolve-LFP-5kW-Inverter-fig-6 Note : The prerequisite for this task is based on a certificate request from the employee(s) that will commission systems – see section 4 – Employee tasks.

  1. From the top menu bar, select: management > certificates
  2. Scroll down to the employee in the employee list that has requested a certificate, and select [Issue] or [Reject] in the right-most column.
  3. If issued, enter the signing key password that was created in section 3.2 to issue the certificate, and select [Issue]

Add organization information

This section is used to establish email issued service alarms from the company’s fleet of systems.

  1. From the top menu bar, select: management > organization
  2. Enter the company web address and main service contact info.
  3. Assign employees that will receive system service alarms by email.
  4. Upload a company logo. This logo will appear in the system owner’s dashboard support widget.

Employee tasks – system installers only

In order to connect to an EMC, a valid certificate must be installed on the employee’s laptop. The following instructions only apply to employees responsible for on site system commissioning.

EGUANA-Evolve-LFP-5kW-Inverter-fig-8 IMPORTANT:  The certificate is web browser specific. Use the same web browser for the certificate request /download /install, and connections to the EMC. Google Chrome is the preferred browser for all computer operating systems; including Windows, MAC, and Linux.

Request certificate
  1. From the top menu bar, select your user account
  2. Scroll down to Certificates, and click on [Request a Certificate]
  3. A pop-up window warns the user to ensure that a public browser window is open for the certificate request. Press [OK].
  4. Notify your administrator that the certificate has been requested.

Download Certificate

Your administrator will notify you that the certificate has been approved.

  1. From the top menu bar, select your user account
  2. Scroll down to Certificates, and click on [Download]
    • A pop-up menu appears:
  3. Enter the employee login password. This is the password used to log in to your account.
  4. Create a “downloaded certificate password”. You can use the same password as the employee login password.
  5. Select [Download]
  6. Save the certificate to your desktop, or retrieve from your downloads folder. The certificate is a personal type.

Install certificate – Google Chrome

EGUANA-Evolve-LFP-5kW-Inverter-fig-11

  1. Select the customize chrome button at top-right of the window.
  2. Click settings.
  3. In the search bar, type “manage certificates”
  4. Click [more] at the bottom of the search list (if applicable), and scroll down to select manage certificates
  5. Select [Import]
  6. The Certificate Import Wizard pop-up menu appears. Select [Next] and follow the instructions in the Wizard to complete the certificate installation.

Device Management

Add new device

EGUANA-Evolve-LFP-5kW-Inverter-fig-12

Device information

  • This menu is a summary of the information entered in section 3.1.

Transferring system ownership

The Current Owner field contains the information that assigns a consumer monitoring interface to thesystem owner. When the system is transferred to a new owner, the Current Owner field must be updated.

EGUANA-Evolve-LFP-5kW-Inverter-fig-13

  1. From the top menu bar, select: devices
  2. In the UID column, click on the UID number of the device for which the ownership will be transferred.
  3. Select the Information sub-menu.
  4. Click the gear icon and enter the new owner’s email and contact information in the pop-up window. to secure the transfer.

Device configuration – manage consumer features

IMPORTANT:  This menu provides access to features which can remotely alter the configuration settings of the energy management controller. Only the features relevant to administrators are covered in this section. Proceed with care.

Granting sytem owner control permissions: power reserve & emergency power reserve

While the energy storage system is entirely automated, the system can be provisioned to allow manual adjustment of the battery reserve capacity by the system owner. This permission is administered by a fleet installer account holder. There are two levels of permissions:

  • Power reserve:
    • By default, the battery is maximized for daily use as part of an energy savings algorithm; either solar self-consumption or time of use plans, where applicable. Approximately 25% is reserved for battery backup. This appears as a slider in the battery widget in the consumer interface, which can be adjusted to increase or decrease backup reserve capacity. This feature requires a manual adjustment for each time a change is required.
  • Emergency power reserve:
    • This feature allows the system owner to maintain a full battery for a defined period, in anticipation of a probable grid outage. This could be driven by an extreme weather event, for example. The duration of this mode is selectable by the owner.
  1. From the top menu bar, select: devices
  2. Select the Configuration > Configurations sub-menus.
  3. Select [Manage Consumer Features]
  4. Check the reserve features for which permission will be granted.
  5. Click [Save]

Device status – Performance Data

Each energy storage system collects system data in 15-second intervals. This data includes unique identifier information, energy production from the battery / solar / grid sources, and performance and fault data from the battery modules and the PCS. This data may be requested for the following uses:

  • Battery module warranty claims
  • Incentive programs that require proof of performance – ie) SGIP applications

Downloading device data

EGUANA-Evolve-LFP-5kW-Inverter-fig-15

  1. From the top menu bar, select: devices
  2. In the UID column, click on the UID number of the device for which the data will be downloaded.
  3. Select the Status > Production > Downloads sub-menus.
  4. Open the New Download sub-menu.
  5. Select Raw EMC data from the report type drop-down list.
  6. Enter a file name and select the start time and stop time from the lookup calendar that follows.
  7. Click [Create] to begin download. Depending on the file size, the download may take up to 30 minutes to complete. It will be saved in .CSV format which can be opened in any spreadsheet application.

Customer Administration

A customer is defined as the system owner, or person which will receive access to the monitoring system at the consumer level only. This is defined as the Consumer Interface, which is entirely separate from the Fleet Installer application. As per section 3.1, the customer’s contact information is recorded as part of adding a new device to the fleet installer. Once completed, the customer’s info is recorded under the customers tab in the top menu bar.

Send welcome email to the customer

  1. From the top menu bar, select: customers
  2. In the customer column, click on the customer name.
  3. Scroll down to the Welcome email last sent at field and click on the email icon in the adjacent column.
  4. Click [Send] in the pop up menu that follows.

The customer will receive an automated email with an account login from My Power. My Way.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals