CSFG 8Pack x The Crow Wall Mount Chassis Instruction Manual

June 9, 2024
CSFG

8Pack x The Crow Wall Mount Chassis
Instruction ManualCSFG 8Pack x The Crow Wall Mount
Chassis

THE CROW MANUAL

8Pack x The Crow Wall Mount Chassis

Risks related to the installation and use of the product and the rules / warnings that the consumer should follow when assembling the product:

  1. The product should be installed on the wall by a qualified technician, installation of the product by non-professionals may cause damage to the Product or personal injury:

  2. When assembling the device, use the accessories and parts supplied with the product. Other accessories, not provided by the manufacturer, may not support the weight of the product, which may result in it falling and causing damage and personal injury:

  3. When mounting the product on a wall, the following areas should be avoided to ensure safety, high performance of the product and prevent product failure:
    – do not install the product in 3 place susceptible to vibrations and impacts – the fixings of the product may become loose and the product may fall and become damaged and cause personal injury;
    – do not install the product near fire sprinklers – the heat generated by the product may activate the sprinkler, which will flood the device; this may in turn cause a short circuit or electric shock from computing devices installed on the product;
    – do not install the product near heating devices – the product may overheat and not work properly;
    – do not install the product in a place where electric cables run (including in the wall) – when installing the product, the cable may be punctured, which may result in electric shock or even death;
    – do not install the product in a place where water supply pipes run (including in the wall) – when installing the product, the pipe may be punctured, which may flood the device; this may in turn cause a short circuit or electric shock from computing devices installed on the product;
    – do not mount the product on a wall that will not support its weight (e.g. plasterboard walls) – the product may fall and become damaged and cause personal injury;
    – do not install the product near kitchen worktops snd air humidifiers, where it will be exposed to fats, moisture or oil mist – this may cause damage to the product and its fall, and personal injury, including electric shock;
    – do not install the product in places where it may be splashed, for example under shelves with items filled with water or liquid – items with water or other liquid may drip  onto the product; the above may result in flooding the product and damage to the product, or personal injury, including electric shock;

  4. Applying excessive force while driving the screws may damage the wall – which may affect the performance of the product or damage it;

  5. Do not allow children to play near the product unsupervised. Children may hit their head or body in angles causing injury; [maybe it is worth indicating at what height the product should be mounted?]

  6. Do not clean the product with wet towels or other objects that generate moisture – moisture may get into the product, which may damage the product;

  7. Do not touch the product during a lightning storm – it may cause a lethal electric shock. Make sure that any electrical devices mounted on the Product are disconnected from the power grid during a lightning storm – it may cause a lethal electric shock;

  8. Do not place metal or flammable objects inside the product – it may cause fire or damage to the product;

  9. Clean the product after disconnecting it from the power supply, using a soft, dry cloth. Do not spray water and other liquids directly on the product, and use chemical  preparations such as cleaning agents for cleaning windows, air fresheners, insecticides, alcohol – this may damage the product or electric shock;

  10. Do not touch the product with sharp or metal objects, e.g. nails of pens – these actions may damage the product or other devices mounted to the product;

  11. The product is not intended for use by people (including children) with reduced physical, sensory or mental abilities or by people without appropriate experience and knowledge:

WARNINGS

The manufacturer is not liable for material or personal damage resulting from failure to comply with the assembly instructions and the rules of safe use of the product.
Fittings for water-cooling require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber O-ring gaskets.
If tightening too hard the acrylic in the distribution plate may crack.

INFORMATION FOR DELIVERY RNO STACKING

CSFG 8Pack x The Crow Wall Mount Chassis - FIG

Package

CSFG 8Pack x The Crow Wall Mount Chassis - Package

All or things you should have in your box of THE CROW:

  1. lx WRLLMOUNT CHASSIS
  2. 2x SIDES
  3. lx WRLLMOUNT HOLDER
  4. lx GLASS
  5. GPU HOLDER
  6. 4x WRLLOISTANCES
  7. Sax MOTHERBOARD DISTANCES
  8. 4x GIRSS DISTANCES
  9. GPU BRACKET
  10. BUTTON RNO BUTTON HOUSING
  11. HOD BRACKETS
  12. PSU SHROUD
  13. SSD BRACKETS ADDITIONAL BAGS WITH SCREWS

Package

CSFG 8Pack x The Crow Wall Mount Chassis - Package1

IMPORTANT!

CSFG 8Pack x The Crow Wall Mount Chassis - Package2

In the next step you will install wall and glass distances. For our upper wall distances it’s important to set them in the right direction as two of them have a metal rod protruding from them. Check it during installation, you can rotate wall mount chassis to check this set after all.

After setting glass distances it will be hard to change the position of the upper wall distances. Make sure that you have set them in the right position.

Wall Distances

  1. Keep the wall mount chassis on a Flat surface and prepare the 4 wall distances.CSFG 8Pack x The Crow Wall Mount Chassis - wall distances

  2. Put each wall distance under the corners of the chassis. The holes need to be visible through the wall mount chassis.CSFG 8Pack x The Crow Wall Mount Chassis - wall distances1

  3. Check if holes are in right position.CSFG 8Pack x The Crow Wall Mount Chassis - wall distances2

  4. Insert and tighten the screws.CSFG 8Pack x The Crow Wall Mount Chassis - wall distances3 Wall Distances / Glass DistancesCSFG 8Pack x The Crow Wall Mount Chassis - glass distances

  5. Use the alien key to mount M4 x 8mm screws – 4 in each corner.CSFG 8Pack x The Crow Wall Mount Chassis - glass distances1

  6. Make sure they are all securely tightened. CSFG 8Pack x The Crow Wall Mount Chassis - glass distances2

  7. Repeat this section for each corner. This is how it should look after mounting the wall distances. CSFG 8Pack x The Crow Wall Mount Chassis - glass distances3

  8. The next step is mounting glass distances. The 4 long pieces are needed in this step. The 4 smaller knobs are used at the end when the hardened glass is mounted.
    Glass Distances

  9. Screw each glass distance into the holes in the corners.CSFG 8Pack x The Crow Wall Mount Chassis - glass distances4

  10. Tighten them securely. they should align well with the surface of the wall mount chassis.CSFG 8Pack x The Crow Wall Mount Chassis - glass distances5

  11. Be careful not to scratch the painted surface!CSFG 8Pack x The Crow Wall Mount Chassis - glass distances6

  12. This is what it should look like once done.CSFG 8Pack x The Crow Wall Mount Chassis - glass distances7
    PSU SHROUD

  13. For this part you will need: 2 sides of the PSU shroud. Shroud Cover, 2 pieces of M3x12mm countersunk screws. 4 pieces of M4xBmm screws (black).CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud1

  14. Place the cover on the side panels of the PSU shroud.CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud2

  15. Use 2 pieces of M3x12mm countersunk screws to tighten the cover to the panels.CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud3

  16. Take care no to scratch the PSU cover.
    PSU SHROUDCSFG 8Pack x The Crow Wall Mount Chassis - psu
shroud4

  17. Next step is to attach the PSU shroud to the wall mounted chassis.CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud5

  18. Place the PSU shroud in the position showed in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud6

  19. When attaching the PSU shroud to the wall mounted chassis it is easier to place the chassis in an upright position as the screws are tightened from the backside with 4 pieces of M4x12mm screws. CSFG 8Pack x The Crow Wall Mount Chassis - psu shroud7

  20. Use an alien key to tighten the screws, you can manipulate the position of the shroud before you tighten the screws.
    PSU BracketCSFG 8Pack x The Crow Wall Mount Chassis - psu
bracket

  21. Next step is to mount the PSU bracket. Where to mount it depends on your PSU size. There are 3 pieces of M4xSmm screws to mount the PSU bracket to theCSFG 8Pack x The Crow Wall Mount Chassis - psu bracket1

  22. The PSU bracket is mounted in the area shown above with the red arrows. Screws have to be tightened from the backside with an alien key.CSFG 8Pack x The Crow Wall Mount Chassis - psu bracket2

  23. Red area – There are three rows of screw holes for three possible distances to mount the PSU.CSFG 8Pack x The Crow Wall Mount Chassis - psu bracket3

  24. View from the backside – Use the alien key to tighten the screws.
    PSU BracketCSFG 8Pack x The Crow Wall Mount Chassis - psu
bracket4

  25. We recommend that you keep the chassis vertical while mounting the PSU bracket.CSFG 8Pack x The Crow Wall Mount Chassis - psu bracket5

  26. View from the right profile – Tighten screws securely.CSFG 8Pack x The Crow Wall Mount Chassis - psu bracke5

  27. The PSU bracket should Fit on your wall mount chassis surface without a gap. Congratulations! Your PSU shroud and PSU bracket are done!
    Next step will be the PC power button.
    Power ButtonCSFG 8Pack x The Crow Wall Mount Chassis - power
button

  28. Power button set has 3 main parts.CSFG 8Pack x The Crow Wall Mount Chassis - power button1

  29. Black-red wire and power button has to be placed in the aluminum housing.CSFG 8Pack x The Crow Wall Mount Chassis - power button2

  30. After that. the black power button housing is placed on topCSFG 8Pack x The Crow Wall Mount Chassis - power button3

  31. Make sure that the button housing is placed correctly. of the aluminum housing. when you click the button the movement should be smooth.
    Power ButtonCSFG 8Pack x The Crow Wall Mount Chassis - power
button4

  32. The button set is mounted From the backside of the wall mount chassis.CSFG 8Pack x The Crow Wall Mount Chassis - power button5

  33. That’s the correct placement!CSFG 8Pack x The Crow Wall Mount Chassis - power button6

  34. Make sure that the holes align in the Front as well as the black power button housing, just like the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - power button7

  35. Tighten the 2 pieces of M3x5mm screws From the frontside.
    Power Button/GPU SupportCSFG 8Pack x The Crow Wall Mount Chassis - gpu
support

  36. Be careful not to scratch the painted surface of the wall mount chassis. This is how the finally placement of the power button should look like.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support1

  37. Now it is time for GPU Support. There are two parts.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support2

  38. First the long part is placed on the green area shown above.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support3

  39. Place it as shown on the picture above, it’s attached with two screws from the backside of the chassis.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support4

  40. View from the backside – You will use 2 pieces of M4x8rnm screws.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support5

  41. Tighten the screws securely, the GPU holder should not be able to move afterwards.CSFG 8Pack x The Crow Wall Mount Chassis - gpu suppor6

  42. This is how it should look like when done.CSFG 8Pack x The Crow Wall Mount Chassis - gpu support6

  43. Place the adjustable support in the holder as shown in the picture above.
    GPU Support / MOBO DistancesCSFG 8Pack x The Crow Wall Mount Chassis -
mobo distanes

  44. Push it to down to a position you are comfortable with, you can always change this laterCSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes 1

  45. The arrow above points towards a small screw, this you can tighten with an alien key to make sure you get the height that you need For your GPU support.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes2

  46. Now it’s time for our motherboard distances – we will call it MOBO to make it easier. There are five parts – lx small. 3x medium, lx large.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes3

  47. They will be placed within the area marked above.
    M080 Distances

  48. This is the proper position for the MOBO parts.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes4

  49. This is how the MOBO distances needs to be placed. Red lines show the alignment of the holes for the screws which you tighten from the backside.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes5

  50. View from the backside – You will use 12 pieces of M4xBmm screws.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes6

  51. Tighten them securely and check from the frontside that the distances are locked in place.CSFG 8Pack x The Crow Wall Mount Chassis - mobo distanes7
    MOBO Distances / GPU Holder

  52. Now you are done with the distances for the MOBO, this is how it should look like. CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder

  53. The GPU holder! Rest you can see there are 3 main parts. First you need to assemble both aluminum holders to the base, for that you will need 4 pieces of M4x1Grnm screws.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder1

  54. Important! Check that you got the mounting position correct! All three parts are different. This is what it should look like.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder2

  55. Use the 4 screws and tighten them securely with the alien key.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder3
    GPU Holder

  56. Once the set is put together it needs to be mounted on the chassis. 4 pieces of M4x8mm screws are needed.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder4

  57.  Make sure that the GPU holder is placed correctly by locating the part shown in the red Frame above.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder5

  58. Tighten the 3 pieces of M4xBmm screws with an alien key from the backside, as you can see on the picture you can manipulate the GPU holders position before you tighten the screws.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder6

  59. This is how it should look once complete.CSFG 8Pack x The Crow Wall Mount Chassis - gpu holder7
    SSD Bracket

  60. The 550 bracket contains two aluminum parts and 4 pieces of M3xernm black screws.CSFG 8Pack x The Crow Wall Mount Chassis - ssd bracket

  61. The 550 bracket is placed on the backside of the wall mounted chassis in the area shown in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - ssd bracket1

  62. Mount the bracket on the backside shown on the pictureCSFG 8Pack x The Crow Wall Mount Chassis - ssd bracket2

  63. Make sure to tightened the screws from the front. the screws are tightened from the front.CSFG 8Pack x The Crow Wall Mount Chassis - ssd bracket3
    HOD Absorber

  64. This is the HOD absorber.

  65. The HOD absorber is mounted on the backside of the chassis shown above.CSFG 8Pack x The Crow Wall Mount Chassis - hdd absorber1

  66. Place the absorbers as shown in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - hdd absorber2

  67. Attach the HOD absorber with 4 pieces of M3xErnm screws from the front.CSFG 8Pack x The Crow Wall Mount Chassis - hdd absorber 3
    THE CROWCSFG 8Pack x The Crow Wall Mount Chassis - hdd
absorber3
    You have made a great job! You are almost done! This is what your wall mount should look like now. In the steps below you will work with the peripherals – Pinions and Specters. If you haven’t purchased the Pinion distroplates or Spectra OS pop-tops you can jump to page 33.
    THE CROWCSFG 8Pack x The Crow Wall Mount Chassis - the
crow
    View From right side – so you can compare your current status. IF you haven’t purchased the Pinion distroplates or Specter OS palmtops you can jump to page

  68. Pinion

  69. The pinions contains one acrylic element and two aluminum elements. Be very careful with the acrylic element as it’s easily scratch and crack if not handled with care.CSFG 8Pack x The Crow Wall Mount Chassis - pinion

  70. To avoid scratches you can use the Styrofoam from the packaging as a protective base.CSFG 8Pack x The Crow Wall Mount Chassis - pinion1

  71.  The Crow can house two pinions, they are placed in the areas shown in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - pinion2

  72. The picture above shows how the brackets should be placed.CSFG 8Pack x The Crow Wall Mount Chassis - pinion3

  73. The pinions are attached to the chassis with 2 pieces of M4x3Omm screws along with silicon pads From the backside.CSFG 8Pack x The Crow Wall Mount Chassis - pinion4

  74. Insert them to their Full length as shown in the picture.CSFG 8Pack x The Crow Wall Mount Chassis - pinion5

  75. Now from the front, place the aluminum brackets on the screws as shown in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - pinion6

  76. Important! This is correct position for our lower bracket for Pinion. The corners point upwards.CSFG 8Pack x The Crow Wall Mount Chassis - pinion 7

  77. View from Frontside of our chassis. Just to be clear -your current status with Pinion should look like that.CSFG 8Pack x The Crow Wall Mount Chassis - pinion7

  78. Carefully place the acrylic Pinion aligned with it’s screw-holes on the screws. The picture above shows the standard placement of the Pinion for ensured watertubing compatibility.CSFG 8Pack x The Crow Wall Mount Chassis - pinion8

  79. Gently press the acrylic Pinion towards the screws while simultaneously tightening the screws from the backside. Take care to not tighten too hard as the acrylic might crack.CSFG 8Pack x The Crow Wall Mount Chassis - pinion9

  80. The screws are only to be tightened so that there are no gap between the acrylic and aluminum and the aluminum and the chassis.CSFG 8Pack x The Crow Wall Mount Chassis - pinion10

  81. Now you repeat the process on the other side. CSFG 8Pack x The Crow Wall Mount Chassis - pinion11

  82. This is how it should look like with the Pinions mounted in the standard configuration.CSFG 8Pack x The Crow Wall Mount Chassis - pinion12

  83. The red markings show what you can look for to make sure you will have an easy time to do your custom-loop.CSFG 8Pack x The Crow Wall Mount Chassis - pinion13

  84. Check if there is no gap between surface of acrylic parts. Tighten all screws up. If all is set. you are done with Pinions!CSFG 8Pack x The Crow Wall Mount Chassis - pinion14
    Specter

  85. The next step is Specter, peripheral for the OS pump.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre

  86. The Specter set contains: Acrylic top, aluminum base and a rubber gasket and 4 pieces of M4x8rnm screws (black) and 4 pieces of M4x2Smm screws (silver). The OS pump in the picture is not included in the set.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre1

  87. We strongly recommend to use the Styrofoam from the boxCSFG 8Pack x The Crow Wall Mount Chassis - Spectre2

  88. Place your rubber gasket in the Specter and then place the as a coaster to prevent scratches on the acrylic. OS pump in the Specter as shown in the picture.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre3

  89. Place the aluminum base on the 05 pump and the Specter as shown in the picture above. Make sure that the countersunk screw holes are visible.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre4

  90. Carefully lie down our aluminum base. There will be wires going from 05 pump – they have to be inside of hole in aluminum base.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre5

  91. Use 4 pieces of M4x2Smm screws to connect the aluminum base with the acrylic top.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre6

  92. Tighten the screws carefully with the alien key, making sure not to tighten too hard which might make the acrylic crack.CSFG 8Pack x The Crow Wall Mount Chassis - Spectre7
    Specter for The CrowCSFG 8Pack x The Crow Wall Mount Chassis -
crow

  93. There are two areas where you can Fit your Specters. Both are shown in red rectangle in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - crow1

  94. Make sure to put your cable through the hole of the wall mount First before placing the OS pumps base into the hole. Be careful not to scratch the PSU shroud which is very close to the hole on the right side.CSFG 8Pack x The Crow Wall Mount Chassis - crow2

  95. This is what it should look like when looking at it From the side.CSFG 8Pack x The Crow Wall Mount Chassis - crow3

  96. Use 4 pieces of M4x8mm screws (black) with silicon washers to fasten the OS pump to the chassis.CSFG 8Pack x The Crow Wall Mount Chassis - crow4

  97. Tighten the screws with the Allen key until it’s secure.CSFG 8Pack x The Crow Wall Mount Chassis - crow5

  98. This is what it should look like when Finished. Repeat the procedure with the other pop-top.CSFG 8Pack x The Crow Wall Mount Chassis - crow6

  99. Your Final destination with Specters should look like that.CSFG 8Pack x The Crow Wall Mount Chassis - crow7You have now successfully assembled the crow! Here are some views on how it should look once done from a few different angles.CSFG 8Pack x The Crow Wall Mount Chassis - crow8
    The next step will be mounting it to the wall before we mount the glass panel.
    Wall BracketCSFG 8Pack x The Crow Wall Mount Chassis - Wall
Bracket

  100.  The last part is our wall bracket. Check the direction of it as you place it on the wall. The three holes are the bottom part that should be aligned with the wall. There are no screws delivered with the chassis. Make sure that you use the correct screws for what type of wall you are placing your chassis on! Always seek advice from a professional carpenter before placing heavy equipment on any wall.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket1

  101. The first step is to make sure that the wall bracket is leveled. This is done by placing it on the Hight you want the top of the case to be and fastening it with a single screw in the middle. Use a spirit level to find the correct angle of the bracket. then use a pencil to make a mark in the other two holes where you need to attach screws.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket2

  102. We can’t stress enough how important it is that you chose the correct screws and/or plugs for what type of wall you have. A fully equipped wall mount can weigh in at around 35 kilograms.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket3

  103. You can see the pins in the red boxes above that are supposed to be placed in the holes of the bracket.
    Mounting on the wallCSFG 8Pack x The Crow Wall Mount Chassis - Wall
Bracket4

  104. Take your wall mount and bring it close to the wall, slightly above the wall bracket, as the picture above shows. Carefully let it slide down into the holes of the bracket. We strongly recommend that you are two adults doing this steps as a fully equipped wall mount is heavy.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket5

  105. Make sure to hold your wall mount securely when doing this in case you missed the holes. it can be hard to see if you have placed it correctly, this is the reason also to have two adults involved in mounting on the wall.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket6

  106. Once the pins are fit into the bracket holes your wall mount is set.CSFG 8Pack x The Crow Wall Mount Chassis - Wall Bracket7

  107. In the picture above you can see it from another angle.
    Side panelsCSFG 8Pack x The Crow Wall Mount Chassis - Side
panel

  108. The side panels will be mounted to the wall distances on the left and right side. There are 4 pieces of M4 8mm screws included for these parts.CSFG 8Pack x The Crow Wall Mount Chassis - Side panel1

  109. The side panels are mounted as shown in the picture above.CSFG 8Pack x The Crow Wall Mount Chassis - Side panel2

  110. Use two of the M4 8mm screws on each side. One at the top and one at the bottom.CSFG 8Pack x The Crow Wall Mount Chassis - Side panel3

  111. Before you tighten the screws, put the side panels in place and make sure that they fit smoothly.
    Side panels / Glass coverCSFG 8Pack x The Crow Wall Mount Chassis - glass
cover

  112. Place the side panel on the side and secure it with the two screws (upper and lower part of side panel) – 2 pieces of M4xSmm.CSFG 8Pack x The Crow Wall Mount Chassis - glass cover1

  113. This is what it should look like with the side panel in place.CSFG 8Pack x The Crow Wall Mount Chassis - glass cover2

  114. Repeat the procedure on the other side.CSFG 8Pack x The Crow Wall Mount Chassis - glass cover3

  115. The last part to assemble is the glass cover.
    Glass coverCSFG 8Pack x The Crow Wall Mount Chassis - glass
cover4

  116. If you have the knobs for the glass cover on, you need to remove all four of them.CSFG 8Pack x The Crow Wall Mount Chassis - glass cover5

  117. Place the plastic washers on the threaded screw sticking out from the glass distance, repeat on all four glass distances. Then carefully place the glass on the protruding screws.

  118. Place the second second of plastic washers on the protruding screws on the outside of the glass distance, then put back the knobs and tighten them carefully. Just enough for the glass to be locked in place.

  119.  Start at the top and work your way down. Here we are, after a long journey! Your Crow is Finally done!
    THE CROWCSFG 8Pack x The Crow Wall Mount Chassis - glass
cover7
    Congratulations! Your set is done! Of course there is the whole part of designing your loop and placing your components as well, but that we leave for you to do. After all, it is your piece of art!

SPECIFICATIONS

CSFG 8Pack x The Crow Wall Mount Chassis - wall
distances4CSFG 8Pack x The Crow Wall Mount
Chassis - wall distances5

COLOR Black. White
CASE MATERIAL Aluminium
GLASS COLOR Transparent. Graphite. Dark
GLASS DISTANCES 4
RECOMMENDED PCI-RISER LENGH1 200-400mm
2.5″ DRIVE ABSORBER 1
2.5″ DRIVE BRACKET 1
MOTHERBOARD COMPATIBILITY Rtx
MOTHERBOARD DISTANCES 5
GPU-13FIRCKET VERTICAL 1
PSU-BRACKET VERTICAL 1
MAX GPU LENGHT 400mm with distribution plate 300mm with reservoir
MRX PSU LENGHT 1135mm
PSU FORM FACTOR Atx
MRX CPU COOLER HEIGHT Waterblack
EXPANSION SLOTS 2
FAN OPTIONS Gx120mm
RADIATOR OPTIONS 2x3SDmm
WEIGHT 10.5kg
DIMENSIONS 540x920x200mm
SIDE PANELS 2
MOUNTINGPLATE 1
POWER BUTTON 1
THE CROW 1
WALLDISTANCES 4
PINION 2
SPECTRE 2

THE CROW

CSFG 8Pack x The Crow Wall Mount Chassis - wall
distances6

PINION

CSFG 8Pack x The Crow Wall Mount Chassis - wall
distances7

SPECIFICATIONS
LENGTH: 380mm
WIDTH: 95mm
HEIGHT: 30mm
WEIGHT: 984g
CRPRCITY: 250mI

SPECTRE

CSFG 8Pack x The Crow Wall Mount Chassis - wall
distances8 SPECIFICATIONS
LENGTH: 92mm
WIDTH: 92mm
HEIGHT: 50mm
WEIGHT: 390g

Documents / Resources

| CSFG 8Pack x The Crow Wall Mount Chassis [pdf] Instruction Manual
8Pack x The Crow Wall Mount Chassis, 8Pack x, The Crow Wall Mount Chassis, Wall Mount Chassis, Mount Chassis
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals