SPECTRA Stack Shipping Bracket Installation Guide

June 9, 2024
Spectra

SPECTRA Stack Shipping Bracket

SPECTRA-Stack-Shipping-Bracket-product

Copyright
© 2022 Spectra Logic Corporation. All rights reserved. This item and the information contained herein are the property of Spectra Logic Corporation.

Notices
Except as expressly stated herein, Spectra Logic Corporation makes its products and associated documentation on an “AS IS” BASIS, WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, BOTH OF WHICH ARE EXPRESSLY DISCLAIMED. In no event shall Spectra Logic be liable for any loss of profits, loss of business, loss of use or data, interruption of business, or for indirect, special, incidental or consequential damages of any kind, even if Spectra Logic has been advised of the possibility of such damages arising from any defect or error.

Information furnished in this manual is believed to be accurate and reliable. However, no responsibility is assumed by Spectra Logic for its use. Due to continuing research and development, Spectra Logic may revise this publication occasionally without notice, and reserves the right to change any product specification at any time without notice.

Trademarks
BlackPearl, BlueScale, CC, RioBroker, Spectra, SpectraGuard, Spectra Logic, StorCycle, TeraPack, TFinity, TranScale, and Vail are registered trademarks of Spectra Logic Corporation. Attack Hardened, Eon Protect, and PreCal are trademarks of Spectra Logic Corporation. MigrationPass is a service mark of Spectra Logic Corporation. All rights reserved worldwide. All other trademarks and registered trademarks are the property of their respective owners.

Part Number
90970045 Revision A

Revision History

Revision Date Description
A December 2022 Initial release.

Contacting Spectra Logic

To Obtain General Information

Spectra Logic Website: www.spectralogic.com.

United States Headquarters
Spectra Logic Corporation 6285 Lookout Road Boulder, CO 80301 USA
Phone: 1.800.833.1132 or 1.303.449.6400
International: 1.303.449.6400
Fax: 1.303.939.8844.

European Office
Spectra Logic Europe Ltd.
329 Doncastle Road Bracknell Berks, RG12 8PE United Kingdom
Phone: 44 (0) 870.112.2150
Fax: 44 (0) 870.112.2175

Spectra Logic Technical Support

Technical Support Portal: support.spectralogic.com.

United States and Canada
Phone:
Toll-free US and Canada: 1.800.227.4637
International: 1.303.449.0160
Mexico, Central and South America, Asia, Australia, and New Zealand
Phone: 1.303.449.0160

Europe, the Middle East, Africa
Phone: 44 (0) 870.112.2185
Deutsch Sprechende Kunden
Phone: 49 (0) 6028.9796.507
Email: [email protected].

Spectra Logic Sales
Website: shop.spectralogic.com.

United States and Canada
Phone: 1.800.833.1132 or 1.303.449.6400
Fax: 1.303.939.8844
Email: [email protected].

Europe
Phone: 44 (0) 870.112.2150
Fax: 44 (0) 870.112.2175
Email: [email protected].

To Obtain Documentation
Spectra Logic Website: support.spectralogic.com/documentation.

ROBOTICS SHIPPING BRACKET INSTALLATION & REMOVAL

This document describes installing and removing the robotics shipping bracket in a Spectra Stack library. The frame is only required when a Stack library is installed in a data center rack prior to shipping.

Estimated Time = 5 – 10 minutes

BEFORE YOU BEGIN
Before installing or removing the shipping bracket, ensure you have addressed the following requirements.

Gather Materials and Tools

Required

  • A #1 Phillips screwdriver
  • A small screwdriver

Recommended

  • An anti‐static mat
  • A static protection wristband or grounding foot strap

Ensure ESD Protection
The installation environment must be free of conditions that could cause electrostatic discharge (ESD). To protect the unit from ESD, follow these procedures when repairing or testing the product:

  • Place a static protection mat on the work surface used while removing and installing components. Use a 1‐megohm resistor to ground the static protection mat.
  • Wear a static protection wristband or grounding foot strap whenever you handle components that have been removed from their anti‐static bags. Connect the wristband to the static protection mat or to other suitable ESD grounding.

Note:
Keep all electronic components in anti‐static bags when not in use.

INSTALL THE SHIPPING BRACKET

Use the instructions in this section to install the robotics shipping bracket in the Spectra Stack tape library prior to shipping.

  1. Remove the top cover.

    • Using a small screwdriver, press down on the release latch on the top of the chassis at the front.SPECTRA-Stack-Shipping-Bracket-fig- \(1\)
    • Slide the top cover towards the front of the chassis until it contacts the screwdriver.
    • Remove the screwdriver and slide the cover forward to release it from the chassis.
    • Lift the cover off and set it aside.
  2. Using a #1 Phillips screwdriver, remove the two screws that secure the slot 5 drive bay cover.SPECTRA-Stack-Shipping-Bracket-fig- \(2\)

  3. Move the drive bay cover to the slot 1 position at the bottom of the library.

  4. Using a #1 Phillips screwdriver, install the two screws you removed in Step 2 to secure the cover to the chassis.

  5. Locate the shipping lock inside the library at the front of the chassis.SPECTRA-Stack-Shipping-Bracket-fig- \(3\)

  6. To unlock the shipping lock, from the front of the chassis, slide the latch to the left (1), pull the latch toward the front of the chassis (2), then slide the latch to the right (3).

  7. Grasp the robotic module gently by the sides and pull up to raise the robotic elevator approximately one inch.SPECTRA-Stack-Shipping-Bracket-fig- \(5\)

  8. Using your fingers, raise the robotic elevator using the two cutout holes on both sides of the robot until it is level with the top of the library chassis. It takes approximately ten to 15 seconds to raise the robotic elevator fully.
    Important Do not raise the robotic elevator higher than the top of the chassis to avoid disengaging the elevator from the track.SPECTRA-Stack-
Shipping-Bracket-fig- \(6\)

  9. While holding the robotic elevator at the top of the chassis, install the robotic shipping bracket in the slot 5 drive bay (see Figure 2 on page 6).
    Note: It may be helpful to have a second person install the bracket while you hold the elevator in place.

  10. Using a #1 Phillips screwdriver, remove the two screws under the handle of the robotic shipping bracket (1) and install the two screws at the ends of the shipping bracket to secure it to the chassis (2).SPECTRA-Stack-Shipping-Bracket-fig- \(7\)

  11. Once the bracket is in place, release the elevator and allow it to rest on the robotic shipping bracket.

  12. Locate the shipping lock inside the library at the front of the chassis.SPECTRA-Stack-Shipping-Bracket-fig- \(8\)

  13. To engage the shipping lock, from the front of the chassis, slide the latch to the left (1), pull the latch toward the rear of the chassis (2), then slide the latch to the right (3).

  14. Position the cover over the opening in the chassis so that the tabs on the sides of the cover align with the slots in the chassis, and slide the cover towards the rear of the chassis until it locks in place.SPECTRA-Stack-Shipping-Bracket-fig- \(10\)

REMOVE THE SHIPPING BRACKET

Use the instructions below to remove the shipping bracket after the library is installed in the data center.

Important
You must remove the bracket prior to powering on the library to avoid an initialization failure.

  1. Remove the top cover.

    • Using a small screwdriver, press down on the release latch on the top of the chassis at the front.SPECTRA-Stack-Shipping-Bracket-fig- \(11\)
    • Slide the top cover towards the front of the chassis until it contacts the screwdriver.
    • Remove the screwdriver and slide the cover forward to release it from the chassis.
    • Lift the cover off and set it aside.
  2. Locate the shipping lock inside the library at the front of the chassis.SPECTRA-Stack-Shipping-Bracket-fig- \(12\)

  3. To unlock the shipping lock, from the front of the chassis, slide the latch to the left (1), pull the latch toward the front of the chassis (2), then slide the latch to the right (3).

  4. Using a #1 Phillips screwdriver, remove the two screws that secure the shipping bracket to the chassis (2) and install the screws under the handle of the robotic shipping bracket (1).SPECTRA-Stack-Shipping-Bracket-fig- \(14\)

  5. Using your finger, hold the robotic elevator in place (see Figure 6 on page 8) while you pull the shipping bracket out of the chassis.

  6. Release the elevator and allow it to slowly descend to the bottom of the chassis.

  7. Store the bracket and screws for use if you need to move the library after installation.

  8. Using a #1 Phillips screwdriver, remove the two screws that secure the slot 1 drive bay cover.SPECTRA-Stack-Shipping-Bracket-fig- \(15\)

  9. Move the drive bay cover to the slot 5 positions in the library.

  10. Using a #1 Phillips screwdriver, install the two screws you removed in Step 8 to secure the cover to the chassis.

  11. Replace the top cover.
    Note: Replacing the top cover is only necessary if the Stack base module is the topmost chassis in the rack.

    • Position the cover over the opening in the chassis so that the tabs on the sides of the cover align with the slots in the chassis.SPECTRA-Stack-Shipping-Bracket-fig- \(16\)
    • Slide the cover towards the rear of the chassis until it locks in place.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Spectra User Manuals

Related Manuals